Jochen Kissel showing the
first signals on the
oscilloscope.
|
Jochen Kissel (middle)
looking for the pressure
in the vacuum chamber.
|
P. Muss and A.Glasmachers
checking their electronics.
|
A view of CIDA in the
opened vacuum chamber.
|
A closer view of the target.
|
A. Glasmachers and
H. von Hoerner discussing
the electronics of the sensor.
|
Jochen Kissel and Ch. Heiss
connecting the power
supplies to the flanges on
the vacuum chamber. Right
M. Stuebig, one of our assistants.
|
Jochen Kissel looking for the
first signals, left Ch. Heiss.
|
The first signal!
|
Jochen Kissel adjusting the
oscilloscope, right Ch. Heiss.
|
Ch. Heiss among the assis-
tants, left M. Stuebig, right
T. Roestermundt, making
the first series of measure-
ments.
|
The third assistant,
R. Wondrascheck, together
with M. Stuebig, J. Rynö
(foreground), and Jochen
Kissel (background). Left
background D. Pitzler, one
of the technicians.
|
Ch. Heiss at an unattended
moment...
|
"Here's the iron!"
|
M. Genzer and J. Rynö at
the opened vacuum chamber.
|
The CIDA team waiting for signals. From left to right:
M. Genzer, J. Rynö,
A. Glasmachers, Ch. Heiss,
and P. Muss.
|
This is how Maria made the
photographs of the instrument.
|
After the tests...
|