Trans-Texas Corridor
Home | Site Tools (downloads)  
decorative graphic
About TTCTTC ProjectsGet InvolvedGet the FAQsTTC FinancingTTC & MeNews &LlibraryComments/Mailing List
decorative graphic
decorative graphic
TTC Projects Upon clicking the navigation items below, subnavgtion will appear (where applicable). You may need to manually activate your screen reader to continue reading the page.
 
 
Did You Know...

Do you have a question?
Check out our FAQ section.


Download the free Adobe Acrobat Reader

PDF documents require Adobe Reader for viewing.

decorative graphic decorative graphic
 

decorative graphic

TTC-35 (Oklahoma to Mexico/Gulf Coast)
WHAT'S NEW - Last Updated 3/1/2007

ABOUT TTC-35

General Location

The proposed TTC-35 corridor generally parallels I-35. The initial study area is approximately 600 miles long, extending from north of Dallas/Forth Worth to Mexico and possibly the Gulf Coast.

Environmental Study

Since Spring 2004, TxDOT has held 171 public meetings to receive public input on possible locations for this corridor. The last series of meetings was held in Summer 2006, with more than 6,000 comments submitted. This phase of the environmental study will result in a preferred corridor no more than 10 miles wide or a no-build option. If a preferred corridor is selected, additional environmental studies will be needed to narrow the final alignment.

Construction

No construction contracts have been awarded.  In March 2005, TxDOT and Cintra-Zachry signed a comprehensive development agreement for TTC-35.  This agreement authorizes a $3.5 million planning effort only.

graphic
©2004 TxDOT. All Rights Reserved.