Metro DIY | Timetable | 简体中文
| News | About Us |Operations Overview | Customer Service | Station Environment | Facilities | Metro Management | Metro Culture |

Now, there are four metro lines have been put into operation. They have a total length of 124 km, with 84stations, and form a line network of the shape of a cross plus a semicircle.

Open Time Line Distance Station Comments
May, 1993 The southern section of Line 1 32.66 kilometers 25 becomes a big traffic artery running throughout Shanghai from north to south.
Apr., 1995 the whole line of Line 1
Jul., 1997 the southern extension of Line 1
Dec., 2004 the northern extension of Line 1
Jun., 2000 Line 2, Phase I 24.73 kilometers 17 runs throughout Shanghai from east to west and connects both sides of the Huang-pu River.
Dec., 2006 Line 2, Phase II
Dec., 2000 Line 3, Phase I 40.23 29 surrounds the CBD areas of Shanghai and mainly consists of elevated lines.
Dec., 2006 Line 3, Phase II
Dec. 2005 Line 4 with its “C” shaped construction 26.60 kilometers 13 connects Line 3, and forms a circle.
Total 4 Lines 124.22 84 --

 

 
| News | About Us | Operations Overview | Customer Service | Station Environment | Facilities | Metro Management | Metro Culture |
Copyright © 2006 SHMETRO Inc. All Rights Reserved.
Design by : erp110.com