CORK COUNTY COUNCIL

N22 Ballyvourney � Macroom � Ballincollig Road Project

ROUTE SELECTION REPORT


Background

Development

Environment

Engineering
& Economics

Summary
& Conclusion

Figures

Appendices

Addenda

Drawings
List

Alternative
Drawings

Drawings of the Emerging Preferred Route

 

Contents

Background

Chapter 1: Background to the Scheme

Development

Chapter 2: Public Consultation

Chapter 3: Development of the Route Options

Environment

Chapter 4: Landscape & Aesthetics

Chapter 5: Cultural Heritage

Chapter 6: Surface Water & Drainage

Chapter 7: Geology & Hydrogeology

Chapter 8: Ecology

Chapter 9: Air Quality

Chapter 10: Noise & Vibration

Chapter 11: Planning

Chapter 12: Socio-Economics

Chapter 13: Demolition and Loss of Amenity

Chapter 14: Agriculture

Chapter 15: Mineral Resources

Engineering & Economics

Chapter 16: Road Alignment

Chapter 17: Construction Impacts

Chapter 18: Cost Estimate

Chapter 19: Economic Assessment

Chapter 20: Structures

Summary & Conclusions

Chapter 21: Summary & Conclusion

Chapter 22: Discussion on Road Cross-Section

Chapter 23: Development of the EPR

 

Back to Top


 

Appendices

Appendix 2 Appendix 3
Appendix 5 Appendix 6
Appendix 8 Appendix 9
Appendix 10 Appendix 14
Appendix 18 Appendix 21
Appendix 23

 

Back to Top


 

Figures

Figure 3.1
Development of Route Options
Concept Route Corridors (March 2001)

Figure 3.2
Development of Route Options
Workshop 4 April 2001

Figure.3.3
Development of Route Options
Routes Presented at Public Consultation 2 (June 2001)

Figure 3.4
Development of Route Options
Plan of Current Route Options (February 2002)

Figure 4.1
Landscape Character Zones

Figure 5.1
Cultural Heritage Sites

Figure 6.1
Rivers, Lakes and Areas Prone to Flooding

Figure 7.1
Geology

Figure 8.1
Ecology & Potential River Crossings

Figure 10.1
Noise Survey Locations

Figure 13.1
Amenity

Figure 15.1
Mineral Resources

Figure 16.1
Standard Cross Sections

Figure 16.2
Junction Locations

Figure 19.1
Travel Time Survey on National & Regional Routes

Figure 19.2
Design Year AADT Flows for Route Options

Figure 22.1
AADT Flows for Preferred Route and Existing Road Network

 

Back to Top


Alternative Drawings List

Legend

Alternative 1
Slieveragh

Alternative 2a
Killeen/Ballymakeery

Alternative 2b
Ballymakeery/Toonlane/Coolnacaheragh

Alternative 3
Coolavokig/Lackaneen/Lissacresig/Inchinilinane

Alternative 4
Killaclug/Glananarig/Clonfadda/Codrum

Alternative 5
Teerbeg/Gurteenroe/Kilnagurteen/Ballyveerane/Coolyhane

Alternative 6
Coolyhane/Bealick/Ummera

Alternative 7
Ummera/Coolcour 

Alternative 8
Farranavarrigane/Inchinashigane

Alternative 9
Inchinashigane/Tooms East/Dunisky

Alternative 10
Dunisky/Carrigdarrery/Ballymichael

Alternative 11
Ballymichael/Clodah

Alternative 12
Clodah/Inchirahilly

Alternative 13
Clodah/Inchirahilly

Alternative 14
Knocknagoul/Currahaly/Farran/Garryhesty

Alternative 15
Garryhesty/Knockanemore

Alternative 16
Kilcrea/Garryhesty

Alternative 17
Kilcrea/Garryhesty/Knockanemore/Carrigane

Alternative 18
Knockanemore/Carrigane

 

Addenda

Under Construction

 


Cork Co. Co. Back to Introduction Back to Top


Best viewed using MS Internet Explorer 6

Comments to Webmaster