Latest
Home » Road Projects » Area 3 » Road Project
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

A3 Hindhead Improvement

The project will deliver quicker, more reliable journeys on a safer road.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A3 Hindhead Improvement

A3 Hindhead Improvement

Status
Current
Located in
Area 3Map of the Agency's Operational Areas
Scheme type
Targeted Programme of ImprovementsRoad Schemes Managed by the Highways Agency
Updates
Get email alerts when we publish new information Get email alerts when we publish new information

The Project

The A3 Hindhead project is one of the schemes in the Government's programme of major schemes.

The project will complete the dual carriageway link between London and Portsmouth and remove a major source of congestion, particularly around the A3/A287 traffic signal controlled crossroads. The new road will be 6.5km (4miles) long and includes 1.8km (1.1miles) twin bored tunnels under the Devil's Punch Bowl Site of Special Scientific Interest.

The project will deliver quicker, more reliable journeys on a safer road, and remove much of the present peak time "rat-running" traffic from unsuitable country roads around Hindhead. It includes the closure of the existing A3 around the Devil's Punch Bowl, bringing considerable environmental benefits to an internationally prized area. The centre of Hindhead will be freed from the daily gridlock that blights the area, with the result that the project will bring benefits to road users, local residents, and the highly prized environment.

Work started in January 2007, with the main tunneling works planned to start in 2008 and the tunnel open for traffic in mid 2011. Further details about the timetable of works can be found in the Timetable page. A PDF showing the location of the scheme is available in the Contact Information and Map page.

Latest Headlines

  • Live journey time information to keep drivers informed - see the Journey times page
  • Traffic diverted to allow construction of Greensand Way and Hindhead Hill underpasses - see the Traffic Management page.
  • Visitor centre and viewing platform now open - see the Community Relations page
  • Latest progress photographs - see the Photographs  page

Please browse through the links in the right hand menu for more information on this project (latest news).