Scope of services :
  • Feasibility Study/Consultancy Services.

Epic (PVT) Limited is among the well qualified to assist in preparing feasibility studies including :

  • Site survey including locational conditions. Investigation of soil conditions, selection of plant site etc.
  • Study of raw material conditions.
  • Technical and financial assessment of proposals for loan sanctioning organizations.
  • Economic evaluation of the Project.
  • Survey of labour conditions for construction and operation.
  • Comparative evaluation and procurement for technology from foreign and local sources.

  • Design Services.

    Computerized design services are provided in all the major disciplines. Area in which work is carried out include system design, process design, equipment specifications, detailed Mechanical design, Plant layout, Piping design, Electrical & Instrumentation etc.

  • Turnkey Services.

    Turnkey services are offered for carrying out Project evaluation and preparation of proposal for the supply of plants on turnkey basis. Licencing arrangements with reputed overseas companies are available in the fields of Chemical, Petrochemical, Sugar, Oil and Gas Processing Industries.

  • Construction Services.

    EPIC provides a full range of services covering Civil construction, Mechanical erection, Electrical installation and Instrumentation.
    Construction management techniques practised by EPIC incorporate integrated planning and control system designed for optimum time and cost efficiency.

EPIC also offers the following associated services :

  • Construction Management.
  • Estimating, Budgeting and Cost Control.
  • Scheduling and Progress Monitoring.
  • Inspection and Quality Control.
  • Transportation.
  • Start up Assistance and Commissioning.
  • back


Major areas of construction are as follows:

  • Mechanical erection work.

    - Storage Tanks, Steel Structure.
    - Reactors, Columns, Towers and Vessels.
    - Head Exchange Equipment/Vessels.
    - Rotary Machine.
    - Process/Off Site Piping.

  • Civil construction work on turnkey projects only which include RCC foundations of Plant and Equipment and Industrial Building.
  • Electrical and Instrumentation work of turnkey projects which include cable laying, generators, motor and transformer installations, lighting system/electrification instrument calibration, installation and loopcheck, instrument cables, panels and control room etc. back

EPIC’s services are available in the following manner.

  • SERVICES:

    - Consultancy
    - Feasibility Study
    - Work study of the Units.
    - Study for Material Balancing & Modernization.
    - Project Planning.
    - Financial Planning.
    - Equipment Planning.
    - Plant Designing.
    - Product Designing.
    - Process Designing/Basic Designing.
    - Detail Designing
    - Project Management
    - Plant Management.
    - Know-how & Technical Assistance’s.
    - Technology Transfer.
    - Mechanical Engineering.
    - Civil Works for Industrial Construction.
    - Civil Foundation.
    - Commissioning of Plant, Machinery & Equipment.
    - Training of Personnel’s.
    - Maintenance.
    - Spare Parts Supplies.
    - Joint Ventures/Collaborations.
    - Field balancing of machinery.
    - Vibration, Analysis & Diagnoses of rotating machinery.
    - Installation, Commissioning and Maintenance of Steam
    and Gas Turbines.
    - Steam Boiler Installation, Commissioning & Maintenance.

  • PRODUCTION & MANUFACTURING SERVICE
  • - Fabrication of whole Plant, Machinery & Equipment.
    - Shop Fabrication & Machinery.
    - Site Fabrication.
    - Erection/Installation of whole Plant, Machinery & Equipment.
    - Parts Products, assemblies, Sub-Assemblies of Equipment’s.
    - Electrification.
    - Electric Panel Boards (Design, Fabrication & Supply).
    - Sand Blasting/Wire Scrubbing.
    - Painting.
    - Wrap Coating.
    - Insulation.
    - Instrumentation.

  • TRADE SERVICES.
    • - Indenting.
      - Import/Export.
      - Marketing.

  • WORK COMPLETED - SUGAR INDUSTRY back

CLIENT YEAR OF SERVICES RENDERED NO. COMPLETION

  • RANIPUR SUGAR MILLS 1999
    Complete maintenance of the plant LIMITED, RANIPUR within shortest possible time. The job includes fabrication of local machinery and equipment, dismantling, clearing and re-erection of equipment, complete piping.
  • 01. DIGRI SUGAR MILLS 1996
    i. Supply and Fabrication of LIMITED DIGRI locally fabricated Machinery
    and Equipment which includes Structures, Process Vessels, Crystallizers, Magma Minglers, Conveyors,etc. etc.
  • 1997 ii.
    Complete Erection of their Sugar Mills Project including electrification and instrumentation on turnkey basis.
  • iii
    Consultancy & BMR of the plant for enhancement of capacity of themills.
  • 02. THARPARKAR SUGAR 1997
    Complete Erection of their Sugar MILLS LTD., THARPARKAR Mills Project including electrification and instrumentation on turnkey basis.


  • 03. LARKANA SUGAR MILLS 1997
    Supply & fabrication of SRI LIMITED LARKANA Clarifier, Talofloc Clarifier, Flashing Vessel, Mud Feed Mixer, Bagacillo Blower etc. for their BMR/Change
    of Process Project
  • 04. LARR SUGAR MILLS. 1996
    Complete Erection of their Sugar LIMITED, SUJAWAL Mills Project including electrification and instrumentation. on turnkey basis.
  • 05. INDUS SUGAR MILLS 1994
    Supply and Fabrication of LIMITED RAJANPUR locally fabricated Machinery and Equipment which includes Structures, Process Vessels, Crystallizers, Magma Minglers, Conveyors, Feed Table etc. etc.
  • 06. MATIARI SUGAR MILLS 1990
    i. Complete erection of Sugar Mills. LIMITED MATIARI Crushing capacity of 3000 tons/day extendable to 4000 tons/day on turnkey basis.
  • 1993 ii.
    Supply & Fabrication of Evaporators having capacity of 2300 Sq.M.
  • 07. AL-ABBAS SUGAR MILLS 1992
    Complete Erection of their Sugar LTD., MIRPURKHAS Mills Project including electrification and instrumentation on turnkey basis.
  • 08. NATIONAL SUGAR 1991
    Supply & Fabrication of Feeding MILLS LTD., SARGODHA Tables, Masceuite Receivers, Cooling Crystallizers, Vertical Crystallizers, etc.
  • 09. SHAHTAJ SUGAR MILLS 1989
    i. Complete erection of Sugar Mills LTD., MANDI BAHAUDDIN Machinery & Equipment for their Extension and Modernization Project.

  • 1981 ii.
    Design, fabrication & Manufac- turing of Mechanical Circulators for Vacuum Pans.
  • 10. SANGHAR SUGAR MILLS 1987
    Complete erection of Sugar Mills. LIMITED MATIARI Project including electrification and instrumentation on turnkey basis.
  • 11. KHAZANA SUGAR MILLS 1987
    Fabrication and erection of Alcohol LTD., PESHAWAR Distillation Plant including Civil work on turnkey basis.
  • 12. KAMALIA SUGAR MILLS 1987
    i. Complete Erection of Sugar Mills LTD., KAMALIA Extension Project including Turbines, Turbo Alternators, Steam Boiler 80 Tons capacity and other process equipment. (Total weight approx 1500 Tons).
  • 1982 ii.
    Supply and fabrication of Auxiliary Cane Carrier, Cane Feeding Table and Truck Tippler including erection.
  • 13. UNITED SUGAR MILLS 1982
    i. Design , fabrication , erection LTD., SADIQABAD and commissioning work of Sugar MILLS Extension Project.
  • 1980 ii.
    Design and fabrication of Vacuum Pan, Cooling Crystallizer, Condensate Storage Cap. 150,000 Gallons.
  • 14. THATTA SUGAR MILLS 1986
    Supply, fabrication & erection LTD., THATTA. of Structures and installation of Core Sampler Pilot Project including supply & fabrication of Vertical Juice Heater, Vertical Cooling Crystallizers and Magma Minglers.
  • 15. SINDH ABADGAR’S 1985
    Fabrication and Erection of Storage SUGAR MILLS LTD., Tanks and Process Equipment. DEENPUR.
  • 16. MIRPURKHAS SUGAR 1981
    Consultancy, designing, fabrication and erection of Exhaust & Vapour Piping, Juice & Syrup Pipeline for their BMR Project.
  • 17. NOON SUGAR MILLS 1982
    Design and Fabrication of Juice BHALWAL Heaters and Vacuum Pans.
  • 18. SHAHMURAD SUGAR 1980
    Fabrication of Process equipment MILLS LTD. JHOK SHARIF including
    Vessels, Storage Tanks, Pug Mills and Screw Conveyors.
  • 19. BABA FARID SUGAR 1979
    Fabrication of Sugar Mills MILLS, OKARA equipment including, Boiler Preheater & Duct, Cane Kicker, Sulphitation Oven, Crystallizer, Blower, Cyclones, Process Vessels and Storage Tanks etc. back


WORK COMPLETED - GLASS INDUSTRY
SR. CLIENT SERVICES RENDERED NO.

  • 1. ASLO ELECTRICAL Design, Fabrication & Erection of Fuel Oil Storage
    INDUSTRIES LTD. Tanks and various piping for steam, oil, gas and KARACHI. water etc. Including supports, hangers etc., LPG Cylinders manifold system, Compressed air mani fold & distribution system and Trollies for Factory uses.

  • 2. NASIR SIDDIQ CORP. Design, Fabrication, Erection and commissioning LTD., SHEIKHUPURA. of Process Equipment, Belt Conveyors, Bucket LAHORE. Elevators, Travelling Conveyors, Silos, Hoppers, Chutes and Bins Structures Platforms, stairs case for Sand Processing Plant & Lime Processing Plant.
  • 3. CORNPAK LIMITED, Fabrication & Erection of Steel structure for
    KORANGI INDUSTRIES Furnace, Sleeve Carrier with Tracks, Annealing
    AREA, KARACHI. Lehr for Vials, Cooling Conveyors for Glass tubes, Exhaust Air Ducting System and various trolleys for transport.
  • GUNJ GLASS WORKS Design, Fabrication & Erection of steel Structure
    LTD. HASSANABDAL Glass Melting Furnace & Machine House. Piping for water, gas fuel oil and compressed air. Fuel oil and Solvent Storage Tanks.

  • 5. ALI GLASS WORKS LTD. Fabrication and Erection of Steel Structure, HASSANABDAL equipment and allied piping of the Plant.
  • RAVI GLASS LIMITED Fabrication and Erection of Steel Structure, LAHORE. equipment and allied piping of the Plant. back

WORK COMPLETED - SOAP AND ALLIED INDUSTRIES

R. CLIENT SERVICES RENDERED NO.

  • 1. ZULFIQAR INDUSTRIES Design, Fabrication & Erection of Process LTD., S.I.T.E. KARACHI. Equipments and Conveying System for Toilet Soap Manufacturing Plant.
  • 2. ASHRAF SOAP Fabrication & Erection of Soap and Glycerin INDUSTRIES KAMOKE, Recovery Plant including Storage Tanks for GUJRANWALA. Raw Material.
  • 3. UNIVERSAL CHEMICAL Fabrication & Erection of complete unit of Soap & GENERAL MILLS LTD., & Glycerine Recovery Plant including Storage KARACHI. Tanks for Raw Material.
  • 4. ALLIED CHEMICAL LTD. Fabrication of complete unit of Soap & Glycerine HUB CHOWKI. Recovery Plant including Storage Tanks for Tallow Caustic etc.
  • 05. AL-HIJAZ LIMITED Design, technical know-how, fabrication, LAHORE. installation and commissioning including insulation, electrification and installation of Glycerin Recovery Plant, capacity 1000 Kgs./day Crude Glycerine and 100 Kgs./ Distilled Glycerine.
  • 6. KOHINOOR SOAP Supply & fabrication of Soap Crutcher, Soap
    & DETERGENT. Feed Tank, Rotary Work & Steam Booster.
  • 7. CRESCENT PAK. Supply & Fabrication & Erection of Process
    INDUSTRIES LTD., vessels and piping. KARACHI.
    back


WORK COMPLETED- PETROCHEMICAL, CHEMICAL & ALLIED INDUSTRY

SR. CLIENT SERVICES RENDERED NO.

  • 1. CHAMAN CHEMICAL Supply & Fabrication of Locally Fabricated
    INDUSTRIES (PVT) LTD., Machinery & Equipment for their Barite LAHORE. Plant.
  • 1. BILAL CHEMICAL IND. Turnkey Project. Complete Design, Fabrication (PVT) LTD., GADOON and Erection of Polyvinyl Acetate Manufacturing Plant.
  • 2. PETROCHEMICAL LTD. Turnkey Project. (Lube Oil Reclamation Cum
    ISLAMABAD. Blending Plant 5000 Tons P.A.) Design, Technical know-how, fabrication , installation & commissioning including civil work, installation
    electrification with panel boards.
  • 3. ASHRAF LUBRICANTS Turnkey Project. (Lube Oil Reclamation cum
    CO. FAISALABAD. Blending Plant 5000 Tons P.A.) Design, Technical know-how, fabrication installation, commissioning including insulation, instrumentation and electrification with panel
    boards.
  • 4. PAKISTAN WAXES LTD. Turnkey Project (3000 Tons of Slack Wax P.A.)
    HUB CHOWKI. Design, Technical know-how, fabrication installation including insulation, instrumentation and electrification with panel boards and commissioning .
  • 5. CALCIUM LTD., Turnkey Project (15 tons perf day PrecipitatedPESHAWAR. Calcium Carbonate Manufacturing Plant Design, technical know-how fabrication,
    installation including insulation, instrumentation and electrification with panel boards and commissioning.
  • 6. NATIONAL REFINERY Erection of Storage Tank of different capacities
    LTD. LUBE EXPANSION ranges from 1000-4000 M3 AS SUB-CONTRACTORS TO M/S. DESCON LTD, KARACHI
  • 7. S. G RAYON MILLS. Fabrication and Erection of S. S. Silos S.I.T.E. KARACHI. and Storage Tanks.
  • 8. ATTOCK REFINERY, Fabrication & Erection of large Storage
    RAWALPINDI. Tanks.
  • 9. DILON LTD., KARACHI. Fabrication of Stainless Steel Vessels M.S.
    Platforms & Pipe supports.
  • 10. PAK CARB LIMITED. Supply fabrication & erection of equipment
    HUB CHOWKI. for Activated Carbon Plant.
  • 11. SUPER CHEMICAL Supply, fabrication and erection of (PVT) LIMITED, Machinery & Equipment for Formaldehyde KARACHI Manufacturing Plant.
  • 12. AL-BAQAR (PVT) LTD. Turnkey Project.Complete design, fabrication
    NOORIABAD. and installation of activated Fullers Earth Plant .
  • 13. NATIONAL REFINERY Erection & Installation of equipment LIMITED, KARACHI. and Pipeline for Dimineralization Unit at Revamp-II at Kemari, Karachi.
  • 14. PAKISTAN ATOMIC Erection of Flare Stack & Fabrication ENERGY COMMISSION. & Erection of Flare Stack Supporting JAUHARABAD. Structure at their Kundian Chemical. Plant-I, Jauharabad (Khushab).
  • 15. TUFAIL CHEMICAL Complete supply & fabrication of INDUSTRIES (PVT) Machinery & Equipment of Caustic LIMITED, LAHORE. Soda Plant.
  • 16. KHAZANA SUGAR Turnkey Project. Fabrication & Erection of MILLS LTD., PESHAWAR Alcohol Distillation Plant with Civil Work.
  • 17. TRISTAR CHEMICAL Supply & Fabrication of Machinery & LIMITED, KARACHI. Equipment for their PVA Plant. back

WORK COMPLETED - PHARMACEUTICAL INDUSTRY

SR. CLIENT SERVICES RENDERED NO.

  • 1. HOECHST PAKISTAN Fabrication of S. S. Reactor for P.V.A. LTD. KARACHI. Slotted Steel Pallet Storage Racks for Warehouse.
  • 2. BOOTS CO. (PAKISTAN) Design, Fabrication & Erection of LTD., KARACHI. Exhaust Air Ducting System including Blowers.
  • . ABBOT LABORATORIES Design, Fabrication & Erection of the PAK. LTD., KARACHI. following:

    - Slotted Steel Pallet Storage Racks
    & Partition fending.
    - S. S. Jacketed Liquid Glucose
    Storage Tanks.
    - Mono rail, Hoist & Platforms.

  • 4. STERLING PRODUCTS Design, Fabrication, erection and (PAK),KARACHI. commissioning of the following:

    - Double Cone Blender
    - Vee Blender
    - Conveyor Packing Belt
    - Slotted Steel Pallet Storage Racks.
    - Drum lifting & tilting hoist

  • HI. Commissioning of Ribbon Mixer.
  • 6. JOHNSON & JOHNSON Design and fabrication of S. S.Storage LTD., KARACHI. Tanks.
  • 7. CIBA-GEIGY (PAK)LTD., Design, Fabrication & Erection of KARACHI. M.S. Steel Gates for Warehouses. back

WORK COMPLETED - CERAMIC INDUSTRY

SR. CLIENT SERVICES RENDERED NO.

  • 1. KARAM CERAMICS LTD. Fabrication & Erection of the following:
    KARACHI - Silos, Hoppers, Bins etc. - Belt Conveyors.

    - Structure, Platforms, Stairs cases.
    - Ducting Blowers.
    - Insulation.

  • 2. SHABBIR TILES & Fabrication & Erection of Silos, Structures, CERAMICS LTD. Track and Chimney Parts. KARACHI
  • 3. EURO CERAMICS (PVT ) Supply fabrication of equipment for their
    LIMITED, HUB CHOWKI. Table Ware Plant.

  • STRUCTURAL WORK.

    • 1. SAUDI ARABIAN Design, Fabrication & Erection including Near Hill Park, PECHS civil work or Steel Structural Shed. KARACHI.
    • 2. BALUCHISTAN Fabrication & Erection of Maleable iron HUB CHOWKI Casting Unit, including Building Steel Structures at Hub Chowki, Baluchistan. back

    WORK COMPLETED - PAPER & BOARD PLANT

    SR. CLIENT SERVICES RENDERED NO.

    • 1. PAKISTAN SUPERWOOD Turnkey Project. INDUSTRIES LTD, Dismentalling of Particle Board Plant KARACHI. from Italy, Erection and Commissioning in Karachi, Pakistan.
    • 2. BANGLADESH Turnkey Project. PARTICLE BOARD Dismentalling of Particle Board Plant BANGLADESH. from Italy, Erection and Commissioning
      at Chittagong, .
    • 3. AL-NOOR SUGAR MILLS, Supply, fabrication of Local Machinery,
      MORO. Erection of complete Plant (Imported Machinery from Sweden & local equipment manufactured by us) of Medium Density Fiber Board Plant.
    • 4. KAWALITY BOARD (PVT) Turnkey Project. LIMITED, LAHORE. Dismantling of Hard Board Plant from Germany, maintenance erection & commissioning at Raiwind Pakistan.
    • 5. AL-NOOR MDF BOARD Supply, fabrication of machinery & MILL LIMITED, MORO. equipment of Bag Filter System for the MFDB Plant.
    • 6. SUPER BOARD MILLS Ltd Consultancy Services / Supervision for DHAKA, BANGLADESH. Dismantling of a particle Board Plant from Venezuela & re-erection and commissioning at Dhaka - Bangladesh.


    • 7. T. K. CHEMICAL Dismantling of a Paper Plant from Germany & COMPLEX. CHITTAGONG Supervision of maintenance & Re-erection at BANGLADESH Chitagong- Bangladesh.
    • 8. GARIB SONS (PVT.) LTD. Consultancy Services / Supervision of Karachi Dismantling, maintenance & Re-erection of a Particle Board Plant Dismantled for Hub Baluchistan and Re-erected at Karachi.
    • 9. SEHAR BORAD Locally manufacturing of major Equipment for INDUSTRIES (PVT.) LTD Particle Board Plant and their erection & MIAN CHANNU. Commissioning at Mian Channu Disst. Khanewal. back

    GENERAL

    SR. CLIENT SERVICES RENDERED NO.

    • 1. STEEL ALLOYS LTD. Designing Fabrication, Erection of complete LAHORE. Foundry Equipment.

      - Overhead Travelling Crane.
      - Cooling Tower
      - Shot Blasting Machine.
      - Sand Muller
      - Moulding Boxes
      - Core Baking Oven
      - Annealing Furnace
      - Instrumentation & Electrification
      with panel boards.

    • KARACHI Design, fabrication and Installation of DEVELOPMENT Aeration System for Sewage Treatment AUTHORITY, KARACHI. Plant.
    • 3. UNION BISCUIT Design, Fabrication & Erection of Steam FACTORY KARACHI. Jacketed S. S. Tanks and Pipeline.
    • 4. TEXTILE WINDING Fabrication & Assembly of Screw MACHINERY CO. LTD. Conveyor for Fecto Cement Plant. KARACHI.
    • 5. ASIAN FOOD IND. LTD. Turnkey Project. KARACHI. Design, supply, fabrication & installation of Belt Conveyors, Hoppers and Glucose Storage Tank etc.
    • 6. GHARIBWAL CEMENT Tuenkey ProjectComplete civil, electrical and LTD. AS SUB- mechanical work of Pack House of Gharibwal CONTRACTOR HEAVY Cement Ltd. on turnkey basis. MECHANICAL COMPLEX.
    • 7. PROGRESSIVE FIBRES Complete Fabrication and Erection of
      LIMITED, HUB CHOWKI. Supporting Structure for the Polyester Fibre Plant back

    CONSULTANCY SERVICES RECENTLY COMPLETED.

    SR. CLIENT SERVICES RENDERED NO.

    • 1. NATIONAL SUGAR Complete technical Consultancy MILLS LTD. LAHORE. services for Sugar Mills Project on turnkey basis.
    • 2. UNITED SUGAR MILLS Consultancy service for Sugar LIMITED, SADIQABAD. Mills Extension Project.
    • 3. INDUS SUGAR MILLS Complete Consultancy service for LIMITED, RAJANPUR. Sugar Mills Project on turnkey ` basis.
    • 4. SUPER CHEMICAL (PVT) Consultancy Services for LIMITED KARACHI. Formaldehyde Manufacturing Plant.
    • 5. DIGRI SUGAR MILLS Complete Consultancy Services LIMITED, DIGRI. for Sugar Mills Project on turnkey basis.
    • 6. TUFAIL CHEMICAL IND. Consultlancy for their Formic Acid (PVT) LTD., LAHORE. Plant. back

    ERECTION SERVICES COMPLETED

    SR. CLIENT SERVICES RENDERED NO.

    • 01. DIGRI SUGAR MILLS Complete Erection of their Sugar DIGRI Mills Project including electrification and instrumentation on turnkey basis.
    • 02. THARPARKAR SUGAR Complete Erection of their Sugar MILLS LTD., THARPARKAR Mills Project including electrification and instrumentation on turnkey basis.
    • 04. LARR SUGAR MILLS. Complete Erection of their Sugar LIMITED, SUJAWAL Mills Project including electrification and instrumentation. on turnkey basis.
    • 05. INDUS SUGAR MILLS Complete Erection of their Sugar LIMITED, RAJANPUR Mills Project including electrification and instrumentation. on turnkey basis.
    • 06. MATIARI SUGAR MILLS Complete erection of Sugar Mills. LIMITED MATIARI Crushing capacity of 3000 tons/day extendable to 4000 tons/day on turnkey basis.
    • 07. AL-ABBAS SUGAR MILLS Complete Erection of their Sugar LTD., MIRPURKHAS Mills Project including electrification and instrumentation on turnkey basis.
    • 08. SHAHTAJ SUGAR MILLS Complete erection of Sugar Mills LTD., MANDI BAHAUDDIN Machinery & Equipment for their Extension and Modernization Project.
    • 09. SANGHAR SUGAR MILLS Complete erection of Sugar Mills.

    • LIMITED MATIARI Project including electrification and instrumentation on turnkey basis.
    • 10. KAMALIA SUGAR MILLS Complete Erection of Sugar Mills LTD., KAMALIA Extension Project including Turbines, Turbo Alternators, Steam Boiler 80 Tons capacity and other process equipment. (Total weight approx 1500 Tons).
    • 11. UNITED SUGAR MILLS Complete erection of Sugar Mills LTD., SADIQABAD Extension Project including Electri- fication and instrumentation on turnkay basis.
    • 12. PEOPLES STEEL MILLS LTD., Erection of Machinery and KARACHI Equipment at Plant Precision Forging Machine & Morgard Shammer Mill.
    • 13. AL-NOOR SUGAR MILLS Complete erection of Medium Density MORO Fibre Board Plant on Turnkey basis.
    • 1. KAMALIA SUGAR MILLS Complete erection of Sugar Mills LIMITED, KAMALIA. Extension Project,
    • 2. SANGHAR SUGAR MILLS Complete erection of Sugar Mill LIMITED, SANGHAR. including Electrical and Instrumentation Work.
    • 3. KHAZANA SUGAR MILS Fabrication and erection of alcohol LIMITED, PESHAWAR. distillation plant with civil work on turnkey basis.
    • 4. SHAHTAJ SUGAR MILLS Complete erection work of Sugar LTD., MANDI BAHUDDIN Extension and Modernization Project.
    • 5. AL-NOOR SUGAR Complete erection of Medium MILLS LTD, MORO. Density Fibre Board Plant.
    • 6. UNITED SUGAR MILLS Executing the design, fabrication, LIMITED, SADIQABAD. erection and commissioning work of Sugar Mills Extension Project.
    • 7. MATIARI SUGAR MILLS Complete erection work of Sugar LIMITED, MATIARI. Project.
    • 8. AL-ABBAS SUGAR MILLS Complete erection of their Sugar LIMITED, MIRPURKHAS. Mills Project including Electrification and instrumentation.
    • 9. INDUS SUGAR MILLS Supply and fabrication of Machinery LIMITED, RAJANPUR. and Equipment and complete Erection of Sugar Mills Project
      including Electrification and Instrumentation.
    • 10. LARR SUGAR MILLS Complete Erection of their Sugar LTD., SUJAWAL. Mills Project including electrification and instrumentation.
    • 11. THARPARKAR SUGAR Complete Erection of their Sugar MILLS LIMITED, Project including electrification THARPARKAR.


    • 12. DIGRI SUGAR MILLS Complete Erection of their Sugar LIMITED, DIGRI. Mills Project including electrification and instrumentation.
    • 13. PEOPLE STEEL MILLS Fabrication & Erection of Machinery & LTD., KARACHI Equipment at Plant Precision Forging Machine & Morgard Shammer Mill.

    The professional services rendered satisfactorily to the following Industries in the country.

    • 1. Refineries.
    • 2. Petrochemical Industries.
    • 3. Chemical Plant and Industries.
    • 4. Pharmaceutical Industries.
    • 5. Blow Carbon Industries
    • 6. Sugar Industries.
    • 7. Heavy Steel Rollering & Foreging Plants.
    • 8. Metallurgical Foundries.
    • 9. Power Plant for Industries.
    • 10. Ceramic Industries & Various Other Industries.
    • 11. Paper and Board Industries.
    • 12. MDF Board/Chip Board Industries.
    • 13. Bulb Manufacturing Industries.
    • 14. Soap Industries.
    • 15. Food Processing Industries.

    EPIC’s experience include the achievements of designing, fabrication, erection and commissioning of the following complete Plants and offer on Turnkey basis.

    • 1. Lube Oil Reclamation Plants.
    • 2. Calcium Carbonate Plants.
    • 3. Lubricants Blending Plants.
    • 4. Paper and Board Plant
    • 5. MDF Board/Chip Board Plant
    • 6. Soap & Glycerin Manufacturing Plants.
    • 7. Wax Sweetening Plant. back

    List Of Technical And Qualified Staff
    • 01. MUMTAZ AHMED (MANAGING DIRECTOR) B.Sc.(Chemical Engineering) 21 years of vast experience in Process, Design, Fabrication and Engineering Management.
    • 02. MOHAMMAD ANWAR, (DIRECTOR) Mechanical Engineer,26 years of experience in Shop Fabrication, Installation, Commissioning & Maintenance of Chemical & Processing Plant which includes Paper & Board, MDF & Chip Board Plants, Power Generation (Steam Turbine, Gas Turbines, Diesel Generation). First Class Boiler Engineer
    • 03. MOHAMMAD SHARIF, (DIRECTOR) B.S.EE, M.E. USA.38 years experience in Power Resources Development Including 12 years as Chief Engineer Power House in SAUDI ARABIA.
    • 04. MOHAMMAD ALAM, (DIRECTOR) M.Sc., Diploma in Sugar Technology.26 years of experience in Sugar Industries in different Capacities.
    • 05. NASEER AHMED, (GENERAL MANAGER Technical) B.Sc. (Mech. Engineering)
    • 21 years of experience in Mechanical Engineering Design, Fabrication Installation, Commissioning and Maintenance of the Chemical Process Plants. Vast experience in manufacturing of Steel and its special alloys.
    • 06. SAEED AHMED, (MANAGER Projects ) B.Sc. (Mech. Engineering) 16 years of experience in Erection of Process Plant, Fabrication of storage tanks, pressure vessels, steel structure and pipeline. Also have the experience regarding the development and production of Tractor Parts, which is involved forging, casting and machining processes.Member of Pakistan Engineering Council.
    • 07. ANIS AHMED, MANAGER (Projects & Planning) B.E. (Mechanical)17 years of experience in Mechanical Engineering Design and development of Spare Parts with Computer Aided Design technology and have used most modern techniques i.e. Coordinate Measuring Machines ( CMM ) & related software for the development of sophisticated Spare Parts of Pakistan Steel.Well aware with computer software specially related to CNC Programming and also for Product Design & Development, Manufacturing and Planning. Worked for system development and software design for Engineering and Data Base Management. Presently engaged in Projects and Planning. Life member of Pakistan Engineering Council.
    • 08. TAHIR AZIZ, MANAGER (Works) B.Sc. (Metallurgy) 12 years of experience in management and supervision of Foundry Shop. Applied for Life membership of Pakistan Engineering Council.
    • 09. MOHAMMAD AMIR, Asst. Engineer (Projects & Planning) B.E. (Mechanical) 04 years of experience in Design of Equipment for the Fabrication, Estimating and Planning for the Sugar & Process Industries and the project planning and execution along with the preparation of bidding documents, job costing and correspondence for the purchase of local as well as foreign equipment for sugar and process industry. Life member of Pakistan Engineering Council.

    • 10. ATIF AHMED, (ENGINEER) B.E. (Mechanical)
    • 11. MOHAMMAD TAHIR, (ENGINEER) Diploma of Associate Engineer.
      16 years of experience in Design of Equipment for the Fabrication, Estimating and Planning for the Sugar & Process Industries.
    • 12. AFTAB AHMED, (ENGINEER) B.Sc. (Mech. Engineering)05 years of experience in Fabrication and Erection of Mechanical and other Industrial Plants.
    • 13. MOHAMMAD NAEEM, (ENGINEER) Diploma of Associate Engineer,14 years of experience in Fabrication, Erection and Maintenance of Sugar & other Industrial Plants.
    • 14. MOHAMMAD TAHIR, (ENGINEER) Diploma of Associate Engineer.
      15 years of experience in Design of Equipment for the Fabrication, Estimation and Planning for the Sugar & Process Industries
      .
    • 15. MOHSIN MAQSOOD, (ENGINEER) Diploma of Associate Engineer.15 years of experience in Fabrication and Erection of Sugar & other Industrial Plants.
    • 16. YOUNAS ROMANI (Sr. DRAUGHTSMAN)
      Diploma in Mechanical Draughtsman. 20 years of experience in Mechanical Draughtsman ship Using Most modern designing and drafting techniques with the help of computer and latest software.
    • 17. MOHAMMAD ZULFIQAR (FOREMAN)Over 25 Years Experience in Tankage / Pipeline Welding Fabrication & Erection Work. back







     