Yankton Bridge
Project #: DPS-NH-81-4(113)
Control #:
31315
Kris Winter - District Engineer

Text Only

Project Contacts:

Robert Wiebelhaus, Project Manager, 402-254-6552
Pat Boyle, District Construction Engineer, 402-370-3470
Larry Hausman, Public Relations Coordinator, 402-254-6552
Lisa Sudbeck, Management Tech, 402-254-6552

Project Info Updated July 2007
Photos Updated Regularly

Views of Construction

We have tried to provide the map info in the best format for fastest download/viewing. Most are in DjVu, which reduces them even more. If you do not have the DjVu reader, please download the FREE READER by clicking on the DjVu button on the left sidebar.

Map of Construction | Aerial View

Construction : The 2.1 miles of  improvements begin 0.4 miles south of the US 81 & N 121 junction and extend north crossing the Missouri River approximately 1000' upstream of the existing US 81 bridge, ending just south of the intersection of 2nd and Broadway in Yankton, SD. Improvements for this section of US 81 include widening and new roadway construction, and construction of a new bridge over the Missouri River.

Lighting/Signals/Signing: Roadway Lighting will be provided along the entire project beginning at the US 81 & N 121 junction.  This will include the bridge and the urban section in Yankton, SD.

Meridian Bridge: The South Dakota DOT is negotiating a contract for the design to convert the Meridian Bridge to a pedestrian/bicycle facility. Plans for the south approach and the connecting trails are not finalized. South Dakota DOT will own the bridge and the City of Yankton will maintain the bridge.

Project Cost: The current total cost for the project is $23,903,498