Brief History

The photo shows the prototype being built in the 70s.

The skeleton is like working on an invisible hull.  You are not locked into the compound curve of the hull but work through a series of flat planes and box shapes to above settee height when carpet can come into its own where more curves are treated with a soft look.  Minimum skills allow you to obtain a shipwright finish.  When the interior is finished the wiring and plumbing can be installed between the gaps of the interior and steel mesh.  This is easy to achieve.  In the 12m boat I fed 1000ft of wiring through the hull gaps in three hours.

 

1976

   Home      5Top of Page