Shatin to Central Link: Prequalification for Electrical and Mechanical Contract - Platform Screen Doors for SCL Phase 1 & APG Retrofit for MOL (Contract No.: 1154)

 

SHATIN TO CENTRAL LINK

Prequalification for Electrical and Mechanical Contract

Expressions of Interest are invited from contractors who wish to submit a tender for

Platform Screen Doors for SCL Phase 1 & APG Retrofit for MOL
Contract No.: 1154

 

1.

Background Information

 

The Shatin to Central Link (SCL), which consists of Phase 1 – East West Line (EWL) and Phase 2 – North South Line (NSL), is a strategic railway line that runs through multiple districts in Hong Kong to strengthen the current railway networks by connecting several existing lines through a number of interchange stations. The 11-km EWL extends the Ma On Shan Line (MOL) from Tai Wai Station to Hung Hom where it will connect to the West Rail Line to form an East-West rail corridor. The NSL is a 6-km extension of the East Rail Line from Hung Hom Station across the harbour to Admiralty Station, forming the North-South rail corridor.

The existing MOL consists of 9 above-ground stations (Tai Wai, Che Kung Temple, Sha Tin Wai, City One, Shek Mun, Tai Shiu Hang, Heng on, Ma On Shan and Wu Kai Sha) which will be retrofitted with Automatic Platform Gates (APG).

The EWL consists of 7 new stations (Hin Keng, Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and Hung Hom) which will be fitted with Platform Screen Doors (PSD).

 

2.

Scope of Works

 

The scope of works comprises the design, manufacture, supply, delivery, installation, testing, commissioning and rectification of defects during the defects liability period of the APG for the 9 above-ground stations of the existing MOL and the PSD for the 7 new stations of the EWL.

 

3.

Key Dates (All tentative)

 

Contract

Tender

Issue

Tender

Return

Contract Award

Contract Completion

1154

Q2/2012

Q3/2012

Q4/2012

Q2/2018

 

4.

Expressions of Interest

 

In order to be considered for prequalification, interested parties having relevant resources, qualifications and experiences are requested to express their interest on or before 14:00 (Hong Kong Time) on 10 February 2012 via the MTR Corporation Limited's E-Tendering System.  Late applications will not be considered.

For contractors registered under the E-Tendering System, please click the following link and log into the system for expression of interest:
http://www.hkextender.com 

For contractors not registered under the E-Tendering System, please click the following link and search for the advertisement notice of Contract 1154 for registration and expression of interest:
http://www.hkextender.com/process/GuestLogon.asp

 

5.

Closing Date for Return of Answers / Information

 

Upon expression of interest, the contractors will receive invitation of prequalification via the E-Tendering System within 2 weeks of 10 February 2012. The contractors shall complete and submit all information and details as required in the invitation via the E-Tendering System no later than the time specified in the prequalification invitation letter.

All invitations and submissions for prequalification and tender will be carried out through the E-Tendering System at http://www.hkextender.com.

For enquiries, please contact Mr Jason Lau, Contracts Administration Manager, via jwslau@mtr.com.hk.

 

Back Top