May 07, 2013 16:44 UTC
Latest updates[?]: Budgets 2012-2018; FY 2014 budget in detail; $110M Fleet support contract; What next for the fleet?
ER/MP, armed
In August 2005, “Team Warrior” leader General Atomics Aeronautical Systems, Inc. in San Diego, CA won a $214.4 million cost-plus-incentive-fee contract for research, development, test and evaluation (RDT&E) of the Extended Range/ Multi Purpose Unmanned Aerial Vehicle System (ER/MP UAS). That was just the first step along the US Army’s $5 billion road to fielding a true Medium Altitude, Long Endurance, armed UAV, modified from the USAF’s famous MQ-1 Predator.
The ER/MP program was part of the US Army’s reinvestment of dollars from the canceled RAH-66 Comanche helicopter program, and directly supports the Army’s Aviation Modernization Plan. Its position got a boost when a 2007 program restructuring cut the Future Combat Systems Class III UAV competition, in favor of ER/MP. Next, the US Air Force saw this Predator derivative as a threat and tried to destroy it, but the program survived the first big “Key West” battle of the 21st century. Now the MQ-1C “Gray Eagle” is moving into full production, as the US Army’s high-end UAV. This FOCUS article offers a program history, key statistics and budget figures, and ongoing coverage of the program’s contracts and milestones.
Continue Reading… »
May 05, 2013 18:30 UTC
Latest updates[?]: Australia's Labor government picks the riskiest possible way forward, with a poor track record of success, for the strategic centerpiece of Australia's maritime power. In exchange, it lets the politicians pay off domestic interest groups; Does Australia even own the IP rights for what it seems to want to do?
Bridge to the future?
In its 2009 White Paper, Australia’s Department of Defence and Labor Party government looked at the progress being made in ship killing surveillance-strike complexes, and at their need to defend large sea lanes, as key drivers shaping future navies. These premises are well accepted, but the White Paper’s conclusion was a surprise. It recommended a doubling of Australia’s submarine fleet to 12 boats by 2030-2040, all of which would be a new successor design that would replace the RAN’s Collins Class submarines.
The surprise, and controversy, stem from Australia’s recent experiences. The Collins Class was designed with the strong cooperation of ThyssenKrupp’s Swedish Kockums subsidiary, and built in Australia by state-owned ASC. The class has had a checkered career, including significant difficulties with its combat systems, issues with acoustic signature and propulsion, major cost growth to A$ 5+ billion, and schedule slippage. Worse still, reports indicated that the RAN can only staff 2 of its 6 submarines. High-level attention led to a report and recommendations to improve the force, but whether they will work remains to be seen. Meanwhile, the nature of Australia’s SEA 1000 future submarine project – and its eventual cost – remain unclear, with estimated costs in the A$ 36-44 billion range. This FOCUS article covers Australia’s options, decisions, and plans, as their future submarine program slowly gets underway.
Continue Reading… »
May 02, 2013 18:55 UTC
Latest updates[?]: Budgets 2012-2018; Training system contract makes Warren Buffett happy; The perils of restructuring KC-X; Basing options and contenders; USAF plans higher usage for KC-46As than KC-135s.
KC-135: Old as the hills…
DID’s FOCUS articles cover major weapons acquisition programs – and no program is more important to the USAF than its aerial tanker fleet renewal. In January 2007, the big question was whether there would be a competition for the USA’s KC-X proposal, covering 175 production aircraft and 4 test platforms. The total cost is now estimated at $52 billion, but America’s aerial tanker fleet demands new planes to replace its KC-135s, whose most recent new delivery was in 1965. Otherwise, unpredictable age or fatigue issues, like the ones that grounded its F-15A-D fighters in 2008, could ground its aerial tankers – and with them, a substantial slice of the USA’s total airpower.
KC-Y and KC-Z buys are supposed to follow in subsequent decades, in order to replace 530 (195 active; ANG 251; Reserve 84) active tankers, as well as the USAF’s 59 heavy KC-10 tankers that were delivered from 1979-1987. Then again, fiscal and demographic realities may mean that the 179 plane KC-X buy is “it” for the USAF. Either way, the stakes were huge for all concerned.
In the end, it was Team Boeing’s KC-767 NexGen/ KC-46A (767 derivative) vs. EADS North America’s KC-45A (Airbus KC-30/A330-200 derivative), both within the Pentagon and in the halls of Congress. The financial and employment stakes guaranteed a huge political fight no matter which side won. After Airbus won in 2008, that fight ended up sinking and restarting the entire program. Three years later, Boeing won the recompete. Now, they have to deliver.
Continue Reading… »
May 01, 2013 16:30 UTC
Latest updates[?]: 6th - and maybe final? - ship ordered; Arctic mission; Construction progress; Full acceptance of USCGC Stratton; Article formatting improvements highlight milestones.
WMSL-750 Bertholf
The US Coast Guard’s massive $25 billion Deepwater meta-program (really Deepwater-II given post-9/11 changes) has endured more than its share of ups and downs. Nevertheless, Congressional support has remained strong, and efforts are being made to restructure the program and get it back on track. Yet the USCG’s Island Class cutter modification program, and the Deepwater Fast Response Cutter supposed to replace it, have faced many difficulties.
The Legend Class National Security Cutters are the largest ships in the Deepwater program, and represent the program’s flagship in more ways than one. The 418 foot, 4,400 ton ships will be frigate-sized vessels with a 21 foot draughts [1], and are rather larger than the 379 foot, 3,250 ton Hamilton Class High Endurance Cutters (HECs) they will replace. Controversies regarding durability and potential hull fatigue, as well as significant cost overruns, have shadowed the new cutter’s construction. Nevertheless, the program appears to be moving forward. This DID FOCUS Article covers the Legend Class cutters’ specifications, program history, and key events.
Continue Reading… »