United returns 787 to service today; WSJ points to other issues

United Airlines is the latest carrier to return the Boeing 787 to service today, on a route from Houston to Chicago. UAL CEO Jeff Smisek is joined by Boeing CEO Jim McNerney on the flight.

Meantime, the Wall Street Journal rained on the parade a bit with an article detailing other issues facing the 787. (Via Google News, but subscription may be required.)

Japan Air Lines, ANA and LAN expect to have the airplane back in service in June, according to reports.

Deliveries of new 787s resumed this month. All this will soon return momentum to Boeing, with formal launch of the 787-10 now anticipated by observes to likely come at the Paris Air Show. Launch will come with orders–widely believed to be from British Airways, Singapore Airlines and Air Lease Corp, and possibly others. If this happens, these will go a long way to restoring the brand damage caused by the ground of nearly 3 1/2 months.

Implications include a boost in the production rate of the 787 to as much as 14 a month. Although this may or may not be announced concurrent with the 787-10 launch, the boost is, in our view, a must. While Boeing expects some 787-9 customers to swap to the 10, reality demands that production increase beyond the 10/mo that will be achieved by the end of this year.

Boeing needs new capacity for the 10 and to open slots for customers who want the 8 and the 9. The line is essentially sold out to 2019-2020 as it is.

EIS for the 10 is planned for 2018, giving the supply chain plenty of time to ramp up.

Fourteen a month–seven in Everett and seven in Charleston–is an unprecedented rate for a wide-body airplane. Airbus is producing the A330 at 10-11 a month and plans to push out the A350 at 10/mo, though at one time there had been talk of a target of 13. The company is already considering a second production line to accommodate demand for the A350-1000. Like the 787, the A350 is essentially sold out to 2019/2020.