Managing Critical Isotopes:
Stewardship of Lithium-7 Is Needed to Ensure a Stable Supply
GAO-13-716: Published: Sep 19, 2013. Publicly Released: Oct 17, 2013.
Additional Materials:
- Highlights Page:
- Full Report:
- Accessible Text:
Contact:
(202) 512-3841
trimbled@gao.gov
Timothy M. Persons, Ph.D.
(202) 512-6412
personst@gao.gov
Office of Public Affairs
(202) 512-4800
youngc1@gao.gov
What GAO Found
Little is known about lithium-7 production in China and Russia and whether their supplies can meet future domestic demand. According to industry representatives, China and Russia produce enough lithium-7 to meet demand from U.S. pressurized water reactors, a type of commercial nuclear power reactor that requires lithium-7 for safe operation. However, China's continued supply may be reduced by its own growing demand, according to an expert that is familiar with China's plans. Specifically, China is building several pressurized water reactors and developing a new type of reactor that will require 1,000s of kilograms of lithium-7 to operate, rather than the 300 kilograms needed annually for all 65 U.S. pressurized water reactors. Relying on two producers of lithium-7 leaves U.S. pressurized water reactors vulnerable to lithium-7 supply disruptions.
No federal entity has taken stewardship responsibility for assessing and managing risks to the lithium-7 supply, but DOE is taking some steps. Risk assessment is the identification and analysis of relevant risks, communication of risks to stakeholders, and then taking steps to manage the risks, according to federal standards for internal control. Officials at DOE, the National Nuclear Security Administration (NNSA), and the Nuclear Regulatory Commission (NRC) told GAO they view lithium-7 as a commercial commodity for which industry is responsible. Industry representatives told GAO that they had no concerns about the lithium-7 supply, as they have experienced no problems in obtaining it. But GAO learned that industry representatives may not be familiar with all the supply risks. Notwithstanding, DOE plans to set aside 200 kilograms of lithium-7 and is funding research on lithium-7 production methods. DOE also studied lithium-7 supply and demand and concluded that no further action is needed. However, GAO found several shortcomings in its study, including that DOE underestimated the amount of lithium-7 used domestically. Industry estimates show that about 300 kilograms of lithium-7 are used annually in the United States, whereas DOE estimated that 200 kilograms are used annually. This and other shortcomings make it unclear if DOE's conclusion is correct that no additional action is needed.
Based on information from agency officials and industry representatives, GAO identified three options to mitigate a potential lithium-7 shortage: (1) building a domestic reserve is a low-cost option that could help in the short-term; (2) building a domestic production capability is a longer-term solution that could eliminate lithium-7 imports, but take about 5 years and cost $10-12 million, according to NNSA; and (3) reducing pressurized water reactors' reliance on lithium-7 is another longer-term solution, but may require years of research and changes in how reactors are operated.
Why GAO Did This Study
About 13 percent of our nations electricity is produced by pressurized water reactors that rely on lithium-7, an isotope of lithium produced and exported solely by China and Russia, for their safe operation. Lithium-7 is added to the water that cools the reactor core to prevent the cooling water from becoming acidic. Without the lithium-7, the cooling waters acidity would increase the rate of corrosion of pipes and other infrastructurepossibly causing them to fail. Utilities that operate the pressurized water reactors have experienced little difficulty obtaining lithium-7, but they may not be aware of all the risks of relying on two producers.
GAO was asked to review the supply and domestic demand for lithium-7 and how risks are being managed. This report examines (1) what is known about the supply and demand of lithium-7, (2) what federal agencies are responsible for managing supply risks, and (3) alternative options to mitigate a potential shortage. GAO reviewed documents and interviewed officials from DOE, NNSA, and NRC, in addition to industry representatives. This report is an unclassified version of a classified report also issued in September 2013.
What GAO Recommends
GAO recommends that the Secretary of Energy ensure a stable future supply of lithium-7 by directing the Isotope Program to take on a stewardship role for lithium-7 by taking steps, including fully assessing risks and accurately determining domestic demand. DOE concurred with the recommendation.
For more information, contact David C. Trimble, (202) 512-3841 or trimbled@gao.gov or Dr. Timothy M. Persons, (202) 512-6412 or personst@gao.gov.
Recommendation for Executive Action
Status: Closed - Implemented
Comments: DOE's Isotope Program has taken actions in 4 areas--assessing risk, communicating with stakeholders, managing risks, and assessing demand--that address this recommendation. To assess risks, program officials have regular communications with intelligence officials in DOE to understand foreign supply risks. Additionally, program officials have documented supply risks and identified actions for mitigation. To communicate with stakeholders, the program holds annual conferences on isotopes and has established relationships with key stakeholders in the domestic lithium-7 market, including companies that supply lithium-7 to U.S. reactor companies. To manage risks, the Isotope Program has encouraged DOE's Office of Nuclear Energy to work with the Electric Power Research Institute to research ways to recycle lithium-7, which they have done. The Isotope Program has also worked with Y-12 to set aside approximately 1,300 kg of lithium-7 and is now funding work to purify 500 kg of it so it is ready for immediate use. To assess demand, the Isotope Program tasked the National Isotope Development Center to determine the domestic demand for lithium-7, which it did and found the annual demand to be approximately 500 kg. These actions were undertaken during the course of our review or following the publication of our report on the lithium-7 supply issue.
Recommendation: To ensure a stable future supply of lithium-7, the Secretary of Energy should direct the Isotope Program, consistent with the program's mission to manage isotopes in short supply, to take on the stewardship role by fully assessing supply risks; communicating risks, as needed, to stakeholders; ensuring risks are appropriately managed; and fully and accurately determining domestic demand.
Agency Affected: Department of Energy
Explore the full database of GAO's Open Recommendations »
Jan 19, 2017
-
National Nuclear Security Administration:
A Plan Incorporating Leading Practices Is Needed to Guide Cost Reporting Improvement EffortGAO-17-141: Published: Jan 19, 2017. Publicly Released: Jan 19, 2017.
Nov 21, 2016
-
Program Management:
DOE Needs to Develop a Comprehensive Policy and Training ProgramGAO-17-51: Published: Nov 21, 2016. Publicly Released: Nov 21, 2016.
Nov 17, 2016
-
Indian Energy Development:
Additional Actions by Federal Agencies Are Needed to Overcome Factors Hindering DevelopmentGAO-17-43: Published: Nov 10, 2016. Publicly Released: Nov 17, 2016.
Oct 24, 2016
-
Nuclear Material:
Agencies Have Sound Procedures for Managing Exchanges but Could Improve Inventory MonitoringGAO-16-713: Published: Sep 23, 2016. Publicly Released: Oct 24, 2016.
Sep 14, 2016
-
Nuclear Weapons:
NNSA Should Evaluate the Role of the Enhanced Surveillance Program in Assessing the Condition of the U.S. Nuclear StockpileGAO-16-549: Published: Sep 14, 2016. Publicly Released: Sep 14, 2016.
Sep 8, 2016
-
Department of Energy:
Actions Needed to Strengthen Acquisition Planning for Management and Operating ContractsGAO-16-529: Published: Aug 9, 2016. Publicly Released: Sep 8, 2016.
Aug 11, 2016
-
Nuclear Supply Chain:
DOE Should Assess Circumstances for Using Enhanced Procurement Authority to Manage RiskGAO-16-710: Published: Aug 11, 2016. Publicly Released: Aug 11, 2016.
Aug 9, 2016
-
DOE Project Management:
NNSA Needs to Clarify Requirements for Its Plutonium Analysis Project at Los AlamosGAO-16-585: Published: Aug 9, 2016. Publicly Released: Aug 9, 2016.
Aug 4, 2016
-
Nuclear Waste:
Waste Isolation Pilot Plant Recovery Demonstrates Cost and Schedule Requirements Needed for DOE Cleanup OperationsGAO-16-608: Published: Aug 4, 2016. Publicly Released: Aug 4, 2016.
Jul 15, 2016
-
Nuclear Security:
NRC Has Enhanced the Controls of Dangerous Radioactive Materials, but Vulnerabilities RemainGAO-16-330: Published: Jul 1, 2016. Publicly Released: Jul 15, 2016.
Looking for more? Browse all our products here