The Wayback Machine - https://web.archive.org/all/20050212215822/http://hawaii-marine.com:80/templates/Trim_Article.htm
anchor-chrome_md_clr.gif (6449 bytes)

Hawaii Marine Company
Naval Architectural, Marine Engineering & Computer Aided Drafting & Engineering

drwgcompassCLR.gif (6171 bytes)

E-mail - hmt@hawaii-marine.com    Web Site - http://hawaii-marine.com
45-302 Makalani St., Kaneohe, HI, USA   96744-2819
Phone/Fax (808) 247-6443

Home Background References Stability Article Trim Article Usage Terms Privacy Policy Tech Support



Understanding Trim

By: Brian Trenhaile, P. E., Naval Architect & Marine Engineer, Hawaii Marine Company, 2004
 

There are basically only two types of trimming calculations.  Other trimming calculations are just variations of these two fundamental types.  In Case I you know the vessel's weight and center of gravity (CG) location and you seek to find the forward and after drafts.  In Case II you know the forward and after drafts and desire to know the vessel's weight and center of gravity (CG) location.  The simple approach that is presented here should be readily understandable by anyone with a basic understanding of algebra and geometry.

This article should benefit anyone involved with designing or operating any type of floating vessel.  Regulatory agents and classification society employees also need to understand these methods in order to check various designs for compliance.  This article is also designed to give a good theoretical understanding of the calculative methodology utilized in the trim and stability sheets sold on this site.

The vessel's "Curves of Form" are needed to perform these calculations.  No attempt is made to describe the theory behind or how to construct the "Curves of Form."  This article is only concerned with application of "Curves of Form" data.
 

Vessel Geometry and Sign Conventions Adopted

Vessel geometry is defined in figure below.  All items are drawn to show the positive sign conventions adopted for this method.

Some important characteristics of this picture are:
bullet

B is the Buoyancy Force provided by the vessel with level trim.  Usually obtained from a "Curves of Form" plot.  In this procedure B is numerically equal to the vessel's displacement (i. e. B = D).

bullet

W is the total weight applied to the vessel.  Usually obtained from a "Weights and Moments" analysis.

bullet

L is the length between the forward and after draft marks

bullet

LCG is the Longitudinal Center of Gravity location, normally obtained from a "Weights and Moments" analysis.

bullet

LCB is the Longitudinal Center of Buoyancy location, usually obtained from a "Curves of Form" plot.

bullet

LCF is the Longitudinal Center of Floatation, normally obtained from a "Curves of Form" plot.

bullet

TA is the draft and the Aft Draft marks

bullet

TF is the draft at the Forward Draft marks

bullet

TM is the Draft Amidships, located midway between forward and aft draft marks

bullet

TLCF is the draft located at the Longitudinal Center of Floatation.

The sign conventions adopted for this presentation are:
bullet

Distances Aft of Amidships are Positive, applies to LCG and LCB

bullet

Trim by the stern is defined as Positive

bullet

Trim Moment causing trim by the stern is Positive

bullet

Trim Lever that causes trim by the stern is Positive

Now that the geometry is defined and the sign conventions are stated, we can proceed with the two basic trimming cases.
 

Case I - Displacement & CG Location Known Find Forward & Aft Drafts

This option is utilized over and over again in design and operational stages to determine a vessel's responses to various loading conditions. 

Step 1 - Obtain Equilibrium
bullet

For equilibrium the vessel weight must equal the vessel's displacement, W = D

bullet

With this displacement enter the "Curves of Form" and obtain a draft.  This draft (TLCF) obtained is the draft present at the LCF location.

Step 2 - In the "Curves of Form" at this LCF draft obtain the following:
bullet

Moment to Trim
bullet

MTI Moment to Trim one Inch, for English Units of long tons·feet/inch or

bullet

MTC Moment to change Trim one Centimeter, for Metric Units of
metric tons·meters/cm.

bullet

Longitudinal Center of Buoyancy, LCB, feet or meters, with aft of amidships defined as positive

bullet

Longitudinal Center of Floatation, LCF, feet or meters, with aft of amidships defined as positive

Step 4 - Find the Trim
bullet

First the trim lever is defined mathematically as Trim Lever = LCG - LCB, in either feet or meters.  If this value is positive trim by the stern should be produced.  If it is negative the vessel should trim by the bow.  Sign convention consistency is extremely important.  For instance if the LCG is 5 feet aft of amidships and the LCB is 2 foot forward, the trimming lever would be equal to 5 - (-2) = positive 7 feet.  Since the numerical value is positive this scenario will cause trim by the stern.

bullet

The applied trimming moment is defined mathematically as TM = D·(LCG - LCG)

bullet

The hydrostatic response trimming moment is defined mathematically as:
bullet

TM = TRIM·MTI for English units

bullet

TM=TRIM·MTC for metric units.

bullet

For equilibrium to occur, the applied trimming moment must equal the response trimming moment.  The previous defined equations are combined, algebraically rearranged with the following expressions for trim obtained:
bullet

TRIM = D·(LCG-LCB)/MTI for English units of inches, the value obtained must be converted to feet, by dividing by 12,  prior to applying it in the formulas which follow.

bullet

TRIM = D·(LCG-LCB)/MTC for metric units of centimeters, the value obtained must be converted to meters, by dividing by 100, prior to applying it in the formulas which follow.

bullet

When the above expressions are satisfied, there is corresponding subtle hydrostatic physical reality for the trimmed vessel condition.  This reality is that the LCB has moved to a new location that is either directly above or below the LCG location.  However, the initial LCB that must be applied in these trim calculations correspond to the vessel in a level condition (i. e. obtained from "Curves of Form" values).

Step 5 - Find the Forward and After Draft Via Geometry
bullet

This method involves the use of similar triangles and the position of the LCF.

bullet

For the forward draft the similar triangles present yield the following expression TRIM/L = dTF/(LCF+L/2), solve this for dTF to obtain dTF = (TRIM/L)·(L/2+LCF) = TRIM·(1/2+LCF/L), then apply the following formula from geometry to obtain the forward draft TF = TLCF - dTF = TLCF - TRIM·(1/2+LCF/L).

bullet

For the aft draft the similar triangles present yield the following expression TRIM/L = dTA/(L/2-LCF), solve this for dTA to obtain dTA = (TRIM/L)·(L/2-LCF) = TRIM·(1/2-LCF/L), then apply the following formula from geometry to obtain the forward draft TA = TLCF + dTA = TLCF + TRIM·(1/2-LCF/L).

bullet

Alternatively, based on geometry, the after draft may be more simply computed as follows:
TA = TF + TRIM.

bullet

With the forward and aft drafts known the mean draft can be quickly computed as follows:
TM = (TF + TA)/2
.

Step 6 - Important Points to Remember
bullet

If the LCB is aft of the LCG the vessel will trim by the bow.  If the LCB is forward of the LCG then the vessel will trim by the stern.  These principles apply regardless of the position of the LCF.

bullet

Sign convention consistency is extremely important.  If they are not followed the formulas presented here will not work properly.

Step 7 - Improvements Made to this site's Trim and Stability Sheets
bullet

The MTI or MTC  values that are presented in the "Curves of Form" are based on the assumption that metacentric radius in the longitudinal direction is equal to the metacentric height in the longitudinal direction (i. e. BML = GML).  This assumption yields approximations for moment to trim values.  These approximations are normally adequate since in most cases there is not much difference between the BML and GML values.  Furthermore the approximations must be made because the VCG values are not known at the time that the "Curves of Form" are made.

bullet

However in the "Trim and Stability Sheets," that are available on this website, the VCG values are known for the conditions at hand, so the moment to trim values are computed accurately.  Three basic formulas are applied.  First, by definition, the restoring moment = GMLD·Tanq.  Second geometry present requires that Tanq = Opposite/Adjacent = TRIM/L.  Three, by definition GML = KML - VCG, where KML is obtained from the "Curves of Form" instead of MTI or MTC.  All three of these equations are combined and rearranged yielding: MTF = (KML - VCG)·D/L.  MTF in this case is moment to trim one foot, where TRIM equals one foot.  Note that ML can be obtained from the following formula: KML = BML + VCB.  The "Curves of Form" may just give BML and VCB, but this is alright since these can be summed to obtain the KML value.  Another article in this website, "Understanding Stability" explains the theory discussed in this paragraph.  However, a little adaptation is required by the reader because that article applies to stability in the transverse direction and this article applies to stability in the longitudinal direction.


Case II - Forward & Aft Drafts Known, Find Displacement & LCG Location

This option is used by naval architects, yacht and boat designers, marine surveyors, marine inspectors and others for deadweight surveys and for stability tests.  It is also used by dock masters, by captains, mates, fisherman and others who may want to determine a vessel's weight and center of gravity location.

The first goal of this analysis is to find the LCF draft.  This draft is needed because the "Curves of Form" are based on the LCF draft and not the mean draft.  After this draft is determined, the primary goals of obtaining a displacement and the LCG location are easily determined through the use of the "Curves of Form" data.

Step 1 - Calculate the Mean Draft & Trim Present
bullet

Compute the mean draft present, where TM = 1/2·(TF + TA).  Remember the "Curves of Form" are not based on this mean draft but on the LCF draft.  However this mean draft serves its purpose as a close estimate for the LCF draft and is initially used to retrieve preliminary data from the "Curves of Form."

bullet

Compute the trim present, with this formula  TRIM  = TA - TF.

bullet

These values of draft and trim are now used to help determine the LCF draft (TLCF).

Step 2 - Obtain the LCF Draft Through Iteration
bullet

At TM go into the Curves of Form and obtain a initial value for LCF.

bullet

An expression for the LCF draft needs to be derived.  Fortuitously the waterline slope (or Tanq = TRIM / L) and the ship length (L between forward and aft draft marks) are known.  From similar triangles we have  dTLCF / TRIM = LCF / L.  From geometry we have  TLCF = TM + dTLCF.  Combining the preceding two equations we have:  TLCF = TM + (TRIM)·LCF / L

bullet

Compute the initial guess for LCF draft through application of TLCF = TM + (TRIM)·LCF / L

bullet

Go back to the "Curves of Form" with initial TLCF just computed and obtain a new value for LCF.

bullet

Recompute the LCF draft, by using the LCF value just obtained into the following formula: TLCF = TM + (TRIM)·LCF / L.

bullet

The LCF just obtained should be close to the one previously calculated.  If not, repeat this process using the most recent LCF draft value to enter the "Curves of Form" to get a new LCF value.  Recompute another LCF draft using the formula TLCF = TM + (TRIM)·LCF / L and compare it with the preceding LCF draft computed, they now should be very close.  Usually only need to iterate once.  The last value for LCF draft is the considered the actual LCF draft and it is applied in the rest of this analysis.

Step 3 - Obtain "Curves of Form" Data Based on the LCF Draft
bullet

With the last TLCF value enter the "Curves of Form" and obtain the following:

bullet

Displacement, D

bullet

Longitudinal Center of Buoyancy, LCB

bullet

Moment to Trim, MTI or MTC.  Which term depends on applicable units system.
bullet

MTI for English units of inches, the value obtained from "Curves of Form" must be converted to feet, by dividing by 12,  prior to applying it in the formulas which follow.

bullet

MTC for metric units of centimeters, the value obtained from "Curves of Form" must be converted to meters, by dividing by 100, prior to applying it in the formulas which follow.

Step 4 - Derive Relationships Between Trim and LCG
bullet

Two relationships for trimming are presented and then equated to each other, the combined result is then manipulated to give an expression for computing LCG.

bullet

First the applied trimming moment is defined as TM = D·(LCG - LCB).

bullet

Second the hydrostatic response moment is defined as TM = MTI·TRIM.

bullet

These equations are equated to each other and solved for LCG to obtain the following result:
LCG = LCB + MTI · TRIM /
D

Step 5 - Calculate the LCG Value
bullet

With the LCB, TRIM, MTI (converted to per foot or meter) and displacement compute the LCG using the formula just derived in Step 4.

Step 6 - Important Points to Remember
bullet

It  trim value is positive, the vessel is has trim by the stern (the stern is submerged deeper than the bow) then the LCG must be located aft of the LCB.

bullet

If trim value is negative, the vessel has trim by the bow (the bow is submerged deeper than the stern), then the LCG must be located forward of the LCB.

bullet

Sign convention consistency remains extremely important!  If they are not followed exactly the formulas presented here will not work properly.


 

Up ] Background ] References ] Stability Article ] [ Trim Article ] Usage Terms ] Privacy Policy ] Tech Support ]

Copyright © 1997- 2004 Hawaii Marine Company, 45-302 Makalani St., Kaneohe, HI   96744-2819  USA    Phone/Fax (808) 247-6443 Emergencies (808) 235-0870.  This Site Last modified: 07/24/04 10:27 PM.

emailCLR.gif (4349 bytes)

This web site created by Advanced Technology Associates Hawaii.  For questions or comments about this web site send e-mail to Brian Trenhaile at bt@atah.net.

flowani.gif (14628 bytes)