Barcelona - Husa Oriente |
The hotel is currently renovating approximately 50 rooms in the hotel until March 2006.
|
Madrid-Fiesta Gran Colon |
The hotel is currently restoring the facade of the hotel. This should be completed by the beginning of June 2006.
|
Vienna-Airo Tower |
The hotel is currently under renovation. All rooms will be refurbished in stages and should be completed by March 2006.
|
Dubai Jumeira Rotana |
The hotel will be partially closed for renovation works from the 1st December 2005 until the end of May 2006.
|
Bayreuth-Treff Rheingold |
The hotel has ceased to operate and has now closed down.
|
Cardiff-Novotel Cardiff |
The hotel is currently refurbishing the newer side of the building. Work is currently being done on the 2nd floor. They will also work on the public areas. The completion date is currently set for June 2006.
|
Hameelinna-Rantasipi Aulanko |
The hotel is currently renovating its rooms, sauna and pool. This will be completed in February 2006.
|
Rome-Grand Hotel Plaza |
The hotel is currently renovating 10 rooms. No completion date has yet been given.
|
Warsaw-Europejski |
This hotel will be closed as of the 1st of July, 2005.
|
Windermere-Old England |
The hotel has advised that the elevator nearest the reception area is out of order and has no date to be fixed as of yet. One wing of the hotel has been closed off for refurbishment, and there is some scaffolding present on the outside of the building. The hotel is planning to carry out renovation works for 18 months. They will update all of the rooms and create a leisure centre which will include a swimming pool and health spa.
|
Dublin Shelbourne |
The hotel will be closed until September 2006 for renovations.
|
Milan Mercure Milano Corso |
The hotel will be undergoing renovation works to renew all of the guests bathrooms. The work will be carried out one floor at a time and will be completed in April 2006.
|
Albufeira Montechoro |
The hotel is currently carrying out maintenance works on the swimming pool, which will continue until March 2006. Guests will be able to use the pool at the Montechoro Club nearby
|
Bath Bath Spa |
There are works taking place to build a Spa outside the hotel. They are also carrying out soft refurbishment on the public areas. From January to March 2006 they will close the swimming pool to carry out works.
|
Cannes Beau Sejour |
The hotel will close for renovation works from the 21st November until the 1st December and then again from 19th December 2005 12th January 2006. They will work on a new kitchen and build a Spa.
|
Carcassonne Du Soleil Le Ter |
The hotel will close on the 1st November 2005 until the 01st April 2006 for renovation works.
|
Dubai Jumeira Rotana |
The hotel will be partially closed for renovation works from the 1st December 2005 until the end of May 2006
|
Durnstein Schloss Duernstein |
The hotel will close for major building works from the 3rd November 2005 and will reopen in April 2006.
|
Faro Eva |
The hotel will begin renovation works from the 5th November until January 2006. The works will take place on the single rooms and they will build a health club on the ground floor
|
Dubai Jumeira Rotana |
The hotel will be partially closed for renovation works from the 1st December 2005 until the end of May 2006.
|
Geneva Le Palace Hilton Geneve |
The hotel will be carrying out renovation works from November 2005 until May 2006. The works will take place on half of the rooms as well as the reception, lobby and bar area.
|
Amalfi Dei Cavalieri |
The hotel has closed for renovation works until the end of March 2006.
|
Amsterdam Novotel Amsterdam |
The hotel is currently undergoing renovation works until April 2006. They will work on the rooms and corridors.
|
Barcelona Condes De Barcelon |
There are currently renovation works taking place in the annex building, which is closed to guests. Work is also taking place on the restaurant, which will re-open in December 2005. Breakfast is served on the 1st floor whilst the works take place. Once the annex is completed they will work on the main building and hope to have this completed by June 2006.
|
Barcelona Le Meridien |
The hotel is currently carrying out renovation works from the 1st to the 3rd floors. They are also working on a new restaurant, which will be opened next summer.
|
Barcelona Nunez Urgell |
The hotel will be undergoing renovation works from the end of December 2005 for approximately one year. The hotel is on 10 floors and they will close and work on one at a time.
|
Barcelona Principal |
The hotel is undergoing some renovation works on one of the buildings. 30 rooms are closed for redecoration and are due to be completed in April 2006.
|
Basel Drei Konige Am Rhein |
The hotel is closed until March 2006 for renovation works.
|
Beaune Novotel Beaune |
The hotel will be closed from the 4th December 2006 until the end of February 2006 to allow them to carry out renovation works.
|
Bucharest Lebada |
The hotel will be closing down for major renovation works on the 21st December 2005. They hope to reopen in January 2007.
|
Budapest Taverna |
The hotel will be undergoing renovation works until the middle of April 2006. They will work on the Vaci Utca side until the middle of February 2006 and will then work on the Petofi Utca side from February until April 2006. All rooms, the lobby, and sauna will be worked on.
|
Brussels Novotel Off Grand Place |
The hotel will be carrying out renovation works until the end of June 2006. The works are planned to take place on the 1st, 2nd and 3rd floors. They will work floor by floor and the area should be closed off from view. Between January and April 2006 they also plan to carry out works on the bar and restaurant. During this time the restaurant will be closed and a cold breakfast buffet will be offered.
|
Cannes Beau Sejour (Update) |
The hotel will close for renovation works from the 19th December 2005 12th January 2006. They will work on a new kitchen are and build a Spa.
|
Dubai Jumeirah Rotana |
The hotel will begin renovation works on the 1st December 2005. They will work on the rooms and public areas. Work on the rooms will be done floor by floor. The pool and Boston Bar will remain open during this time. Breakfast will be served in the main restaurant Brauhaus.
|
Dubai Le Meridien |
The hotel is renovating the entertainment centre, which is due for completion in February 2006. Works are also taking place in the kitchen, which will be completed in June 2006. Works on the guest rooms will continue until January 2007.
|
Dubai Sheraton Jumeirah Beach Resort & Towers |
Due to the ongoing development of the Jumeirah Beach area guests may experience some background noise in the open areas. Land view rooms overlook the development site and sea view rooms may partially overlook the works. Works inside the hotel have been completed, however works in the area are not due to completed until the second quarter of 2006.
|
Giardini Naxos Russott |
The hotel will be closed until April 2006 in order to allow renovation works to be carried out.
|
Gdansk Novotel Gdansk Centrum |
The hotel will be refurbishing the rooms until May 2006. During the works there will be no car park available for guests use.
|
Geneva Royal Geneva |
The hotel is closed for renovation works until the 01st June 2006. They will work on the restaurant, breakfast room, lobby and front of the building as well as adding a new conference room and additional 30 rooms.
|
Glasgow Crowne Plaza Glasgow |
The hotel has now been re-branded as the Crowne Plaza Glasgow. The hotel will undergo a multi-million pound investment and will undergo a full refurbishment. They will install air conditioning throughout the hotel and refurbish the rooms, restaurant and bars as well as the conference area. A new club floor will also be added at the top of the hotel. They have not advised a completion date as yet.
|
Guimaraes Pousada N.Sra.Da Oliveira |
The hotel is closed for renovation works until the 24th February 2006.
|
Interlaken- Victoria-Jungfrau |
The Spa will be closed for renovation works from the 12th December 2005. They will work on the Swimming Pool, Sauna, Whirlpool, steam bath, solarium and changing rooms.
|
London Berners |
The hotel has advised of a large-scale renovation programme to all the public areas. They will re style the restaurant and the lobby will be renovated. Additional meeting rooms will be added on the ground floor. All bedrooms will also be worked on and a Gym will be added to the 1st floor area. They will also add another floor to the building to accommodate suites. Work is due to begin in January 2006 and is expected to take approximately 18 months to complete.
|
London Ibis London Earls Court |
The hotel have been undergoing renovation works, they have installed air conditioning in all the rooms and a new fire alarm system. They still have to carry works out on the car park and are refurbishing the 3rd floor at the moment. They will also carry works out on the lobby at the back of the hotel. All works will be completed in December 2006.
|
London Inter-Continental London |
The hotel has now closed for renovation works and will remain closed until June 2006.
|
Lucerne Grand National |
The hotel will be carrying out works on the faηade of the hotel until March 2006.
|
Lyon Sofitel Lyon Bellecour |
The hotel has begun renovation works on some of the floors. They will work on the 3rd floor during December 2005 and in January and February 2006 the 1st & 2nd floors will be worked on.
|
Nice Splendid Nice |
The hotel is currently carrying out works on the 3rd floor, which is closed off. Works are also taking place on a few rooms on other floors at the same time. These works will stop prior to Christmas and will resume in January 2006. The restaurant has been moved from the 2nd to the 8th floor.
|
Paris Rochester Champs Elysees |
The hotel will close from the 19th to 23rd December to join a new extension building to the main part of the hotel.
|
Riga Europa Royale Riga |
The hotel has been undergoing works and has delayed the reopening until the end of March 2006.
|
Rome Princess |
The hotel will be undergoing renovation works on the 2nd floor until the end of March
|
Rome Waldorf |
The hotel plan to renovate the rooms in building c, from December 2005 until March 2006.
|
Seville Murillo |
The hotel has now begun the last phase of the renovation works. They will work on the rooms, bathrooms and work by floor on the right wing. Works are currently planned to be completed in February 2006.
|
Sorrento Nice |
The hotel will be closing for renovations from December 2005 until the middle of March 2006.
|
St Julians Corinthia San Gor |
The hotel will be undergoing renovation works from December 2005 until March 2007.
|
Valencia Tryp Azafata |
The hotel will be undergoing renovation works until May 2006. During the works they will have a limited number of rooms available during this time. Work on one wing has already been completed and has been reopened
|
Venice Concordia |
The hotel will be carrying out renovation works to the hallways and some of the rooms until the middle of February 2006
|
Windermere Old England |
The gable end demolition of the collapsed part of the hotel has now begun. The work will take approximately one year to complete. There will be heavy works and scaffolding visible to the guests.
|
Geneva Novotel Geneve Centre |
The hotel is undergoing renovations on some of the floors, however these areas are closed off for the works. They will work on 3 floors until March 2006.
|
Gothenburg Radisson SAS Park |
The hotel has been taken over by the Elite Hotel group, since January 2005 they have been undergoing renovation works. Some of the rooms have been finished at the end of September 2005, and the remainder of the rooms will then be worked on from December 2005 until early 2006.They are planning to create a new fitness centre in the basement of hotel.
|
Gozo Kempinski San Lawrenz |
The hotel has been undergoing renovations, which should have been completed, these have now run over and although the hotel has reopened some works will continue.
|
London Vencourt |
The hotel will be closing down for a total refurbishment on the 14th October 2005. They currently plan to reopen on the 1st March 2006 as a Premier Travel Inn.
|
Munich Holiday Inn City Centre |
Rooms in the 3rd and 4th wings are currently being renovated and are closed to guests. No completion date has been set for these works yet.
|
Nazare Praia |
The hotel are currently working on a building adjacent to the hotel, this has scaffolding erected on the outside and will eventually be linked to the main hotel building. There are no works taking place within the hotel (which the clients use).
|
Nice Novotel Nice Arenas Airport |
The hotel will begin renovation works at the beginning of October 2005. They will work on two floors, which will be closed for the works.
|
Nice Quality Acropole Nice |
The work on the annex at the hotel will begin on the 4th November 2005, 50 rooms will be closed off and the annex will be separated from the main hotel.
|
Paris Novotel Paris Bagnolet |
The hotel will renovate approximately half of the bedrooms in the hotel. No completion date has been set yet.
|
Porches Pestana Viking |
The hotel has closed for renovation works until April 2006.
|
Rome Princess |
The hotel has advised of renovation works, which will take place on rooms on the 2nd floor. They plan to begin on the 1st November and hope to be completed in March 2006. They will close the work area off from the guests view.
|
Venice Delfino |
The hotel will be carrying out works on the main kitchen, which will mean the restaurant will have to be closed. Breakfast service will not be affected, however they will be unable to serve dinner and have arranged for this to take place in a local restaurant, which is approximately 200 metres from the hotel. No completion date has been given yet.
|
Abu Dhabi Sheraton Abu Dhabi |
The pool area will be closed for maintenance from the 3rd December for approximately 2 weeks. The family and kids pool will be available as well as the lagoon during this time
|
Albufeira Montechoro |
The hotel is currently carrying out maintenance works on the swimming pool, which will continue until March 2006. Guests will be able to use the pool at the Montechoro Club nearby.
|
Athens Athens Gate |
The hotel will close for renovation works in November 2005.
|
Athens Olympic Palace |
The hotel will be closed for renovation works from the 15th November 2005 until March 2006.
|
Barcelona Confortel Almirant |
The hotel will undergo a complete renovation from the 18th November 2005 until April 2006. They will work on all areas and will extend the restaurant and reception areas. They also plan to build a fitness club.
|
Barcelona Husa Internacional |
The hotel will begin renovation works on the 16th November 2005 until April 2006. The hotel has two buildings, one with two floors and one with four floors. The building with four floors will undergo a complete renovation. The entrance is in the building undergoing the works so these will be seen on arrival, breakfast will be available as usual.
|
Bath Bath Spa |
There are works taking place to build a Spa outside the hotel. They are also carrying out soft refurbishment on the public areas. From January to March 2006 they will close the swimming pool to carry out works.
|
Bivigliano Giotto Park |
The hotel will close for renovation works from the 6th November 2005 until the end of February 2006.
|
Bucharest Intercontinental |
The Balada restaurant is undergoing renovation works and is closed for use. There are two other restaurants available for the guests use during this time.
|
Cannes Beau Sejour |
The hotel will close for renovation works from the 21st November until the 1st December and then again from 19th December 2005 12th January 2006. They will work on a new kitchen and build a Spa.
|
Durnstein Schloss Duernstein |
The hotel will close for major building works from the 3rd November 2005 and will reopen in April 2006
|
Hanover Kastens Hotel Luisen |
The hotel is currently undergoing renovation works and will also build a gym on the 6th floor. The works are due for completion in March 2006.
|
Lucerne Schiller |
The hotel will be closed for renovation works from the 01st December 2005 until the 27th March 2006.
|
Madrid Finisterre |
The hotel is currently undergoing a complete refurbishment. The works will continue until January 2007 and this will also include the addition of new rooms.
|
Marbella El Fuerte |
The hotel will undergo renovation works until the middle of February 2006. They will work on the indoor swimming pool. The hotel is made up of two buildings and they will try to work on one at a time.
|
Marbella Sofitel Los Montero |
The beach club will be closed for a complete refurbishment until March 2006.
|
Montecatini Grand Bretagne |
The hotel is currently closed for renovation works
|
Monte Carlo De Paris |
The hotel will begin renovation works on the 31st October 2005 and hope to complete these by the end of May 2006. They will work on some of the rooms, but the work areas should be sealed off.
|
Milan Leonardo Da Vinci |
The hotel will begin a complete renovation programme at the beginning of November 2005. They will work on all the rooms, the bar and hall areas. There is no completion date set as yet.
|
Nice Quality Acropole Nice |
The hotel will begin renovation works at the end of November 2005. They will work on the entire building over a three year period. The works will include the faηade, which involves scaffolding being put in place. The hotel is in two parts and they will work on one part at a time.
|
Paris Novotel Paris Bagnolet |
The hotel will carry out renovation works from the end of November 2005 until the middle of January 2007. They will work on the conference centre and all the rooms.
|
Paris Scribe |
The hotel will be undergoing renovation works until April 2006. The bar will be closed for works, during this time an alternative area will be available for use. Works will also take place in the lobby area.
|
Porto Mercure Batalha |
The hotel will begin a complete renovation at the end of November 2005. The works are expected to last until March 2006, all rooms and corridors will be worked on starting on the 6th floor.
|
Toldeo P.N. Conde De Orgaz |
The hotel will be carrying out renovation works from December 2005 until May 2007. 50 rooms will be closed from both the hotel buildings and over the swimming pool and garden for works. To try and minimise disruption where possible the work areas will be sealed off.
|
Valencia Tryp Azafata |
The hotel have been undergoing renovation works which will be completed around the 10th November and they will then begin works on the second wing and work on this until the middle of May 2006.
|
Vienna Artis |
The hotel has advised that they are renovating the bedrooms on the 5th floor during November 2005. Then in January and February 2006 they will work on the 1st, 2nd, 3rd and 4th floors.
|
Windermere Old England |
The hotel is carrying out renovations to repair damage caused by storms earlier in the year.
|
Geneva Le Palace Hilton Geneve |
The hotel will be carrying out renovation works from November 2005 until May 2006. The works will take place on half of the rooms as well as the reception, lobby and bar area.
|
Bordeaux Mercure Chateau Chartrons |
The hotel will be undergoing renovation works on parts of the hotel. The work areas are due to be closed off from view, however no completion date has been given yet.
|
Bratislava City Hotel Bratislava |
The hotel is carrying out renovation works to the lobby, which will be completed by the end of November 2006.
|
Carcassonne Du Soleil Le Terminus |
The hotel will close on the 1st November 2005 until the 01st April 2006 for renovation works.
|
Paris Rochester Champs Elysees |
The hotel is currently creating an additional 16 rooms. The works are taking place inside the extension part and not in the main building.
|
Aswan Moevenpick Elephantine Island Resort |
The renovation of the swimming pool and all day restaurant are ongoing. Both of these areas are now expected to be completed in late Spring 2006. Works on the lobby and first floor bar is expected to begin in the New Year.
|
Barcelona Arts |
The hotel is still continuing with renovation works, and is currently working on some of the rooms. Works are due for completion in June 2006.
|
Barcelona Le Meridien |
The first floor of the hotel facing Pinto Fortuny Street is still undergoing renovation works and will be completed in January 2006. Once this is completed they will work on the 1st to 9th floors on the Las Ramblas Boulevard side.
|
Barcelona Melia Barcelona |
The hotel is currently renovating the rooms and once these are completed will then work on the public areas. All works will be completed in 2007.
|
Frankfurt Continental Frankfurt |
The hotel is still under renovation works, they are now working on the right side of the 1st and 2nd floors. The third floor is already completed and they are not planning any works for the fifth floor
|
Hartsad Viking Nordic |
Due to a fire in the hotel sauna, they have had to close down for repair works for approximately 4 months.
|
Helsinki Cumulus Seurahuone |
The hotel will close for renovation works in the 1st January 2006 until the middle of April 2006.
|
Loja La Bobadilla |
The hotel will close on the 8th January 2006 until the 31st March 2006 in order to carry out renovation works on all the rooms. They will also create a business room and carry out renovations on the fitness and public areas.
|
London Hilton On Park Lane |
The hotel will be carrying out renovation works from December 2005 until April 2006. They will work on the 7th, 8th and 26th floors. The restaurant on the 28th floor will be closed from January to March 2006 due to window works.
|
London Ibis London Earls Court |
The hotel has been undergoing renovation works, the installation of Internet access into the rooms is now completed, as is the works on the meeting rooms on the 2nd floor. They will start works on the group lobby and car park in January 2006.
|
London Lowndes |
The hotel will close down for refurbishment from December 2005 for approximately 9 months.
|
Munich Hilton Munich City |
There are currently renovation works taking place on the 4th floor, which should be completed by the middle of February 2006. They also plans to carry out works on the lobby and reception areas in January 2006.
|
Munich Parkhotel Schwabing |
The hotel are carrying out some renovation works on the exterior faηade, these are due for completion in May 2006. Scaffolding is visible to guests from the outside.
|
Nazare Da Nazare |
The hotel will be closed from the 1st January until the end of February 2006 to allow them to carry out renovation works.
|
Nice Choiseul |
There are currently renovation works taking place on the top three floors of the hotel. The floors are closed during the works, no completion date has been advised yet.
|
Rome Hassler |
The hotel will be undergoing renovation works from December 2005. They will work on a new faηade and scaffolding will be in place.
|
San Cugat Novotel Sant Cugat |
The hotel is currently renovating the public areas. The restaurant and Cafeteria have been closed and a provisional area set up in meeting rooms. Works are expected to be completed in March 2006.
|
Strasbourg Monopole Metropole |
The hotel will be closed for refurbishment from the 2nd 7th January 2006 and again from the 20th February until 04th March 2006.
|
Taormina Excelsior Palace |
The hotel is closed for renovation works from the 6th January until 6th February 2006.
|
Antwerp Ambassador |
Renovation works will take place in the hotel from January to April 2006. They will work on 2 floors at a time and should be closing the work areas off.
|
Arles Nord Pinus |
The hotel will be closed until the 28th February 2006 for renovation works.
|
Assisi Dei Priori |
The hotel will be closed for renovation works from 16th January until 16th February 2006.
|
Assisi Subasio |
From the 15th January until end of March 2006 the hotel will be closed for renovation works.
|
Baden Baden Queens |
The hotel will be undergoing renovation works from the 9th January until the end of March 2006. They will completely renovate the bathrooms and rooms, as well as the public areas.
|
Barcelona Condes De Barcelona |
The renovation works on the Restaurant have been delayed and will now not be completed until the middle of January 2006. They are also continuing with the works on the annex building, which should be completed in June 2006.
|
Bath Bath Spa |
The hotel will be adding a new swimming pool from January until Spring 2006. During this time there will be no pool available for customers use.
|
Berne Savoy |
Renovation works in the bathrooms will begin at the beginning of February 2006 for a few days.
|
Bordeaux Mercure Chateau Chartrons |
Renovation works will begin in January 2006 for approximately one year. They will work on all the rooms in stages.
|
Brno Grand Brno |
The hotel will begin renovation works on the 2nd February until approximately the middle of April 2006. Rooms on the Front side of the hotel will be closed to upgrade the rooms and bathrooms.
|
Canterbury County |
The hotel will close for major renovation works from the 14th January until the end of June 2006.
|
Chantilly Chateau De Montvillargenne |
The hotel will begin renovation works in January and will continue until June 2006.
|
Copenhagen Imperial |
The hotel will carry out renovation works from January to April 2006. Work will be carried out floor by floor and 150 rooms and bathrooms will be worked on.
|
Dublin Temple Bar |
Renovation works will be taking place on the public areas from January until the end of February 2006.
|
Essen Sheraton Essen |
The hotel will be carrying out decoration works from January until the end of February 2006. The restaurant will be closed so meals will be served in a banqueting room.
|
Evora Pousada Dos Loios |
The hotel will be closed for refurbishment works until the 31st March 2006.
|
Freiburg Novotel |
The hotel will undergo a complete renovation from the 9th January 2006. They will work on all areas and will close floors off as the work takes place. These are expected to be completed in early March 2006.
|
Funchal Reids |
The hotel will be closed for renovation works from the 16th January 2006 for approximately 3 months.
|
Graz Trend Europa |
The hotel will begin renovation works to the rooms in January 2006. They will work on the 2nd and 3rd floors until approximately April 2006.
|
Helsinki Cumulus Seurahuone |
From the 05th January 2006 renovation works will be taking place on the rooms, corridors and restaurant in the hotel. The hotel will be closed during the works and expects to reopen in April 2006.
|
Hof Bei Salzburg Arabellashearton Jagdof |
The Spa area will not be available to guests on the 30 31st January 2006. They will re open some of the services on the 1st February.
|
Istanbul President Istanbul |
The exterior of the hotel will be undergoing construction works until the end of March 2006. Scaffolding will cover part of the building.
|
Karlsruhe Renaissance Karlsruhe |
Renovation works will begin on the 3rd January 2006. They will work on the lobby and bar areas as well as reception. They hope to complete the works in February 2006.
|
London Ibis London Earls Court |
Works on the group lobby and car park will be in January 2006, no completion date has been given for these as yet
|
Lucerne Central |
The hotel will be closed for renovation works between the 16th January and 22nd February 2006.
|
Lyon Sofitel royal Lyon |
Renovation works will take place on the breakfast room and reception area from January until April 2006. During the works breakfast will be served in the former restaurant on the ground floor.
|
Mijas Club Puerta Del Sol |
The hotel will be undergoing renovation works from January until March 2006. They will work on the conference rooms as well as some of the bedrooms.
|
Milan Leonardo Da Vinci |
The hotel has now closed for approximately 2 years to carry out renovation works.
|
Nice Boscolo Atlantic |
The hotel will begin renovation works at the beginning of February 2006 until early 2007. They will close during these works.
|
Nice De Berne |
The hotel has been undergoing renovation works, which have now been extended and they will remain closed until the end of April 2006.
|
Paris Novotel Paris Bagnolet |
There will be renovation works taking place from January 2006 until early 2007
|
Paris Scribe (Update) |
The hotel began renovation works in September 2005. In January 2006 they will begin works on the lobby and 3rd and 4th floors and then in March 2006 will work on the 1st and 2nd floors. The works should be completed by the beginning of Summer 2006.
|
Rothenburg Prinz |
The hotel will undergo renovation works from the middle of January 2006. They will work on the rooms and bathrooms on the 4th floor and hope to have the works completed by the end of March 2006.
|
Salzburg Austria Trend Airport Centre |
The hotel will close due to renovation works from the 08th January until the middle of April 2006.
|
Sorrento Grand Hotel Excelsior Vittoria |
The hotel will close from the 5th January 2006 until the middle of March 2006. They will carry out renovation works in different stages and parts of the hotel.
|
Toledo P.N. Conde De Orgaz |
Renovation works will begin in the middle of January 2006 until early 2007.
|
Tromso Radisson Sas Tromso |
The hotel will be building a new lobby bar, congress and meeting rooms and bedrooms from January 2006 until early 2007.
|
Venice Gardena |
The hotel will be closed for renovation works from the 08th 09th February 2006.
|
Vienna Artis |
The hotel has advised that they are renovating the bedrooms on the 1st, 2nd, 3rd and 4th floors. The work will take place until the end of February 2006.
|
Vienna Im Palais Schwarzenberg |
At the beginning of 2006 the hotel will begin renovation works on the new glasshouse suites in Schwarzenberg Park. The main building will also be renovated and new rooms added. Works are expected to last at least one year.
|
Windemere Belsfield |
Renovation works will begin in January 2006 and should last approximately 8 weeks. They will carry out works in all of the rooms.
|
Windermere Old England |
Renovation works will take place from January for approximately 4 weeks, during this time the hotel will be closed, once they reopen smaller works will continue until November 2006.
|
Zurich Montana |
The hotel will begin renovation works on the 16th January until the end of March 2006. 45 rooms will be renovated.
|
Assisi Subasio |
From the 15th January until end of March 2006 the hotel will be closed for renovation works.
|
Copenhagen Imperial |
The hotel will carry out renovation works from January to April 2006. Work will be carried out floor by floor and 150 rooms and bathrooms will be worked on.
|
|