Widen I-5 Each Direction from Salmon Creek to I-205 - Project Map

Project Location Map

Widening this section of I-5 increased capacity and allows motorists to move more safely and efficiently through the I-5 corridor.

In addition to widening 2 miles of I-5 from approximately the NE 99th Street interchange (Salmon Creek) to the I-205 junction, the project also:

  • Replaced the northbound and southbound bridges that cross over Salmon Creek (near Salmon Creek Park).
  • Built a new bridge at NE 129th Street.
  • Added an additional lane and a second left-turn lane at the northbound I-5 off ramp to NE 134th Street.
  • Revised the signal at NE 134th Street to accommodate the second left turn lane.