Follow this link to go to the text only version of nasa.gov
NASA -National Aeronautics and Space Administration
Follow this link to skip to the main content
+ Text Only Site
+ Site Help & Preferences
Go
ABOUT NASALATEST NEWSMULTIMEDIAMISSIONSMyNASAWORK FOR NASA

+ Home
SPACE SHUTTLE
SPACE SHUTTLE MAIN
SHUTTLE MISSIONS
BEHIND THE SCENES
LAUNCH AND LANDING
MULTIMEDIA
NEWS AND MEDIA RESOURCES
VEHICLE STRUCTURE
 + Space Station Section
+ Astronauts
+ NASA Home > Mission Sections > Space Shuttle > News and Media Resources
Print ThisPrint This
Email ThisEmail This

NASA NEWS

George Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller@nasa.gov


08.31.07
STATUS REPORT: S-083107

NASA's Space Shuttle Processing Status Report

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit:
http://www.nasa.gov/centers/kennedy/news/index.html



Mission: STS-120 - 23rd International Space Station Flight - U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 23, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 3 this week, forward and aft closeout work continues. The midbody closeouts are complete. Closeout of the crew cabin airlock is under way. The orbiter's main engines have been configured for rollover. Workers are installing hard covers on the orbiter's windows.

Stacking and closeout of the STS-120 solid rocket boosters in the Vehicle Assembly Building are finished. Mating of the external fuel tank to the boosters is targeted for Sept. 5, pending completion of foam repair work that is being done on the tank's liquid oxygen feedline support brackets.


Mission: STS-122 - 24th International Space Station Flight - Columbus Module
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1
Launch Date: Targeted for Dec. 6, 2007
Launch Pad: 39A
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 1, workers continue making modifications to the orbiter's engine cutoff sensor wiring. This work involves rerouting new wires and installing new resistors. Inspections of the main propulsion system flow liners are complete, and the drag chute door has been installed. Orbiter power system validation will begin next week after the vehicle is powered up.


Mission: STS-123 - 25th International Space Station Flight - Kibo Logistics Module, Dextre Robotics System
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Feb. 14, 2008
Launch Pad: 39A
Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman and Reisman
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, two tiles damaged during the flight of STS-118 have been removed for inspection and testing. The orbiter structure beneath the tile impact area has been inspected, and engineers have found no evidence of heat-related damage. Additionally, three-dimensional measurements of the damage site found no appreciable change in volume resulting from heat affects.

Also during inspections, two micro-meteorite impacts were observed on the payload bay door radiators. They did not damage any of the radiator Freon coolant loops and did not reach the outer skin of the payload bay doors. These impact areas can be repaired.

Spacehab, part of the STS-118 payload, was removed from Endeavour's payload bay and returned to the Space Station Processing Facility. Validation of the orbiter's main engine pneumatics and power systems is complete. Workers have completed post-flight thermography inspection of the reinforced carbon-carbon, or RCC, on the nosecap.

Thermography inspection of the left- and right-hand wing leading edge RCC panels is under way. Preparations are being made for the forward reaction control system functional test. Workers are deservicing the hypergolic fuel system today. The orbiter's three main engines will be removed next week.

+ Back to Top

+ Freedom of Information Act
+ Budgets, Strategic Plans and Accountability Reports
+ The President's Management Agenda
+ Privacy Policy and Important Notices
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant to the No Fear Act
+ Information-Dissemination Priorities and Inventories
+ USA.gov
+ ExpectMore.gov
NASA
Editor: Jeanne Ryba
NASA Official: Brian Dunbar
Last Updated: August 31, 2007
+ Contact NASA
+ SiteMap