Raisbeck Engineering Improving aircraft performance, productivity, safety and comfort


Raisbeck Engineering, Inc.
Tel (800) 537-7277
Int'l (206) 723-2000
After Hours AOG
(206) 390-8690

© Copyright 2005-2010

Boeing 727 Stage 3 Noise Reduction Kits

Keep 'em flying with our 727 Stage 3 Noise Reduction Kits!

Available in multiple configurations to suit all mission profiles for 727-100s and 727-200s, these kits are the most economical, least invasive Stage 3 System available.

Key benefits of all Raisbeck Stage 3 Kits:
  • Short installation downtime
  • No changes in the engines
  • No structural changes or winglets that could jeopardize Boeing support
  • Negligible increase in OEW (7 to 99 lbs depending on configuration)
  • No performance loss
  • Increased list from high altitude airports
  • No changes in cockpit procedures
  • No changes in crew training

KIT
MTOW*
MLW*
Installation
Man-Hours**
727-100
172,200 lbs
142,500 lbs
30
Standard (SGW) 727-200
166,400 lbs
153,500 lbs
30
Increased (IGW) 727-200
179,700 lbs
166,000 lbs
114
Heavy (HGW) 727-200
180,000 lbs
up to 201,200 lbs
166,000 lbs
215
* Noise-limited weights
** Installation hours based on the assumption that prerequisite hardware is already installed and indicate the totals required from that baseline; they are not cumulative.

Learn more about our Stage 3 Noise Reduction Kits

BROCHURES ONLINE

SUMMARY

OEM SUPPORT

Call us today for more information!
Home   |   King Air   |   Learjet   |   Commercial Airlines   |   Twin Otter   |   Contact Us   |   Site Map