|
Hydroelectric power station |
Installed capacity: 4,5 MW |
Expected annual production of electricity:
21,5 GWh |
Installation: run-of-river |
Waterway: Montmorency River |
Drainage basin: 1 100 km2 |
Flow: 29 M 3/s |
Head: 18,8 m |
Construction: 1908 |
Renovation: 1994 -1995 |
Client: Hydro-Québec |
Term of the power purchase agreement:
20 years, renewable (beginning 1995 – expiring 2015) |
Distinctive feature: power
station located in an urban area |
|
|