CHARACTERISTICS
Hydroelectric power station
Installed capacity: 4,5 MW
Expected annual production of electricity: 21,5 GWh
Installation: run-of-river
Waterway: Montmorency River
Drainage basin: 1 100 km2
Flow: 29 M 3/s
Head: 18,8 m
Construction: 1908
Renovation: 1994 -1995
Client: Hydro-Québec
Term of the power purchase agreement:
20 years, renewable (beginning 1995 – expiring 2015)
Distinctive feature: power station located in an urban area
 
fermer