Winscales I


List


 


 

Number of turbines 3   Av. households supplied 1,156 households
Rating of turbines 0.66 MW Carbon dioxide saved:    
Wind farm size 1.98 MW        CO2 displacement 2,647 tonnes p.a.
Predicted output 4,857 MWhr p.a.            
Note: The capacity factor used in these calculations is 28.00%.

Constructed in 1999 by Wind Prospect for Cumbria Wind Farms Ltd. This development lies around 4km from Workington in West Cumbria, not far from the Lowca, Siddick and Oldside wind clusters.

Project Manager

Bruce Allan


List


 


 

Winscales wind farm

Bristol Website Design