Documents & Resources
- MEPA Certificate on the DEIR
- Public Comments on the DEIR
- Draft Environmental Impact Report (DEIR)
- Project Fact Sheet [3.7 mb]
- Cost Presentation Summary, January 25 2010 [130 kb]
- May 3, 2010 Public Meeting Presentation [8.2 mb]
- October 26, 2009 Public Meeting Presentation [4.6 mb]
- October 26, 2009 Public Meeting Minutes [51 kb]
DRAFT Alternatives Analysis Technical Report
- DRAFT Alternatives Analysis Report [6.2 mb]
- DRAFT Alternatives Analysis Report Figures [2.9 mb]
- DRAFT Appendix A Operations Analysis [720 kb]
- DRAFT Appendix A Operations Maintenance Costs [502 kb]
- DRAFT Appendix B Supplemental Analyses of Ridership and Rapid Transit Operations [701 kb]
- DRAFT Appendix C Design Year Traffic Impacts Memo [343 kb]
- DRAFT Appendix C Traffic Technical Memo Ggraphics [4.4 mb]
- DRAFT Appendix D Construction Impacts Traffic Managemet Memo [235 kb]
- DRAFT Appendix E Air Quality [667 kb]
- DRAFT Appendix F Figures [3.2 kb]
- DRAFT Appendix F Noise and Vibration Technical Memo [1.3 mb]
- DRAFT Appendix G Draft Geotechnical Interpretative Report [12.7 mb]
- DRAFT Appendix G Geotechnical Data Report [7.9 mb]
- DRAFT Appendix G Soil & Ground Water Management Plan [2 mb]
- DRAFT Appendix H Hazardous Materials Inspection Report [3.9 mb]
- DRAFT Appendix H Limited Environmental Site Assessment Report [2 mb]
- DRAFT Appendix I Land Use Figures [3.1 mb]
- DRAFT Appendix I Land Use Memo Text [322 kb]
- DRAFT Appendix J Figures [1.1 mb]
- DRAFT Appendix J Stormwater Management Plan [369 mb]
- DRAFT Appendix K Preliminary Groundwater Management Plan [10.7 mb]
- DRAFT Appendix L Historic Resources and Archeological Resources [9.4 mb]
- DRAFT Appendix M Other Construction Impacts Memo [245 mb]
- DRAFT Appendix N Environmental Justice Technical Memo [280 mb]
- DRAFT Appendix N Figures [6.5 mb]
- DRAFT Design-Year Traffic Memo Appendices [10.2 mb]
- DRAFT Environmental Justice Memo Appendix A CTPS Data [54 kb]
- DRAFT Environmental Justice Memo Appendix B Outreach List [20 kb]
- DRAFT Limited Environmental Site Assessment Appendix [11.9 mb]
- DRAFT Air Quality Memo Appendix [4.6 mb]
Working Group Meeting Materials
- February 23, 2010 Presentation [6.3mb]
- December 14, 2009 Minutes [66kb]
- December 14, 2009 Presentation [49kb]
- October 1, 2009 Agenda [49kb]
- October 1, 2009 Minutes [60kb]
- October 1, 2009 Presentation [12.3mb]
- July 30, 2009 Agenda [55kb]
- July 30, 2009 Minutes [53kb]
- July 30, 2009 Presentation [75kb]
- May 18, 2009 Minutes [53kb]
- May 18, 2009 Presentation [53kb]
- May 18, 2009 Agenda [53kb]
- March 24, 2009 Minutes [Word - 51kb]
- March 24, 2009 Presentation [PDF - 3.7mb]
Bowdoin-Charles Connector Project Report (1987)
- Table of Contents [PDF - 422kb]
- Volume II [PDF - 5.7mb]
- Volume III [PDF - 20mb]
- Volume IV [PDF - 4.4mb]
- Volume V [PDF - 15.5mb]
- Volume VI [PDF - 4.2mb]
- Volume VII [PDF - 7.6mb]
- Volume VIII [PDF - 10mb]
- Overview of the Travel Demand Forecasting Methodology [PDF - 168kb]
- Report to MBTA on the Bowdoin Charles Feasibility Study (1986) [PDF - 3.8mb]
- Comment Letters [PDF - 2.6mb]
- Expanded Environmental Notification Form [PDF - 4.2mb]
- Map [PDF - 1.8mb]
- MEPA Certificate [PDF - 4.7mb]