Wind power

Wind tag line

Wind power

Wind tag line

Wind power

Wind tag line

Wind power

Wind tag line

Ardrossan wind farm

  • Capacity 30MW
  • Operational since March 2004
  • 15 turbines (2MW Vestas V80)

Ardrossan wind farm, Ayrshire, Scotland has an installed capacity of 30MW and was acquired by Infinis from Scottish and Southern Energy plc in May 2010. It has been generating since March 2004 and was extended in 2009. Ardrossan is notable for its favourable wind resource and high capacity factor, which has historically been over 36%.