Pre-construction Requirements for Below-permit-sized Operations

Pre-construction requirements for confinement feeding operations with an animal unit capacity from 501 to 999 animal units and that use formed manure storage.

Non-permitted - formed manure storage - A construction permit is not required. However, a Construction Design Statement (CDS) including a manure management plan must be submitted at least 30 days prior to the start of construction, even if a manure management plan has been filed before. Some construction requirements and design standards must be met. For specific requirements, see the following: