Spotlight
What's New On Our Site
NRC adds links to new material for a given date on government work days. Links on this page cover material added to the site this month and the prior month. For earlier material, see Previous Site Additions.
November 15, 2016
NUREG-1542, Volume 22
Performance and Accountability Report – Fiscal Year 2016
NUREG/BR-0117, N16-04
NMSS News Link Fall 2016
November 8, 2016
NUREG/IA-0475
TRACE/RELAP5 Comparative Calculations For Double-Ended LBLOCA and SBO
NUREG/IA-0473
Feedwater Line Break Analysis Using RELAP5/MOD3.3 for Steam Generator Blowdown Load Assessment
November 4, 2016
NUREG-1824, Supplement 1
Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications – Final Report
November 1, 2016
NUREG-2209, Draft Report for Comment
Environmental Impact Statement for Construction Permit for the Northwest Medical Isotopes Radioisotope Production Facility
October 28, 2016
NUREG-2176, Final Report
Environmental Impact Statement for Combined Licenses (COLs) for Turkey Point Nuclear Plant
Units 6 and 7
October 21, 2016
NUREG-1650, Revision 6
The United States of America National Report for the Convention on Nuclear Safety: Seventh National Report, October 2016
October 19, 2016
NUREG/CR-7207, PNNL-23708
Spent Fuel Transportation Package Response to the Newhall Pass Tunnel Fire Scenario, Final Report
NUREG/CR-7206, PNNL-23701
Spent Fuel Transportation Package Response to the MacArthur Maze Fire Scenario, Final Report
October 7, 2016
NUREG-2202
Safety Evaluation Report – Related to the Early Site Permit Application in the Matter of PSEG Power, LLC and PSEG Nuclear, LLC for the PSEG Early Site Permit Site – Docket No. 52-043 – PSEG Power, LLC and PSEG Nuclear, LLC
October 6, 2016
NUREG/CR-7218, Volume 1 and 2
Rod Bundle Heat Transfer Facility Two-Phase Mixture Level Swell and Uncovery Test Experiments Data Report
For earlier material, see Previous Site Additions.