Additional Program Requirements
In addition to an Accident Prevention Program, other safety & health programs may be required, depending on the hazards in your particular workplace and whether or not the scope of each rule applies.
Activities & Industries
Show Activites & Industries program requirements- Fire fighting:
- Accident Investigation Program WAC 296-305-01503
- Preventive Maintenance Program (for fire apparatus) WAC 296-305-04507
- Trench Rescue Response Program WAC 296-305-05007
- Confined Space Entry Program WAC 296-809-300
- Diving: Safe Practices Manual WAC 296-37-530
- Fall Protection Work Plan (for construction work) WAC 296-155-24611 (2),
- Flagging: Traffic Control Plan WAC 296-155-305 (7)(b)
- Grain Handling Facilities:
- Emergency Action Plan WAC 296-99-025
- Housekeeping Program WAC 296-99-050
- Preventive Maintenance Program WAC 296-99-065
- Ski Area Facilities:
- Written Safety Program WAC 296-59-027
- Pipe System Inspection Program WAC 296-59-080
- Safety Plan for Vertically-coupled Containers (for waterfront activities) WAC 296-56-60103 (10)(b)
Biological
Show Biological program requirements- Bloodborne Pathogens Exposure Control Plan WAC 296-823-11010
- Vermin Control Program (for agriculture) WAC 296-307-24036
Chemicals, general
Show Chemicals, general program requirements- Chemical Hazard Communication Program WAC 296-800-17005
- Emergency Response Plan WAC 206-824-20005
- Hazardous Waste Emergency Response Plan WAC 296-843-16005
- Hazardous Waste Health and Safety Plan WAC 296-843-120
- Lab Chemical Hygiene Plan WAC 296-828-20005
- Process Safety Management (PSM) Emergency Action Plan WAC 296-67-053
Chemical, specific
Show Chemicals, specific program requirements- Acrylonitrile Compliance Program WAC 296-62-07336 (7)(b)
- Arsenic Exposure Control Plan WAC 296-848-40005
- Benzene Exposure Control Plan WAC 296-849-13005
- Butadiene Compliance Plan and Exposure Goal Program WAC 296-07460(6)(b) and -07460(7).
- Cadmium Compliance Program WAC 296-62-07411 (2)
- Cadmium Emergency Situation Plan WAC 296-62-07415
- Cotton Dust Compliance Program and Work Practices Program WAC 296-62-14533 (5)(c) and (7)
- Coke Ovens Compliance Program WAC 296-62-20009 (6)
- DBCP (1,2-Dibromo-3-chloropropane) Compliance Program, WAC 296-07342 (7)(b)
- Ethylene Oxide Exposure Control Plan WAC 296-855-40010
- Lead Compliance Plan (for construction work) WAC 296-155-17611 (2)(a)
- Lead Compliance Program (for general industry work) WAC 296-62-07521 (6)(c)
- Methylenedianaline (MDA) Compliance Program (for construction work) WAC 296-155-17315 (5)
- MDA Compliance Program (for general industry work) WAC 296-62-07613(2)
- Pesticides: Cholinesterase Monitoring Program WAC 296-307-148
- Vinyl Chloride Compliance Plan WAC 296-62-07329 (6)(c)
Emergencies
Show Emergencies program requirements- Emergency Action and Fire Prevention Plans (for agriculture)WAC 296-307-35015
- Emergency Action and Fire Prevention Plans (for non-agriculture)WAC 296-24-61715 (1)
- Emergency Action Plan (for powered platforms) WAC 296-870-40010
- Emergency Action Plan (for waterfront activities) WAC 296-56-60010
- Emergency Medical Plan WAC 296-54-513 (9)
See all other subjects for more complex or specific emergency plan requirements.
Personal Protective Equipment
Show Personal Protective Equipment program requirements- PPE Use Program (for fire fighting) WAC 296-305-02001
- Respiratory Protection Program WAC 296-842-12005
See also Activities & Industries
Physical Hazards
Show Physical Hazards program requirements- Electrical: Safety Program (for electrical work) WAC 296-45-075
- Electrical: Assured Equipment Grounding Conductor Program (for construction work) WAC 296-155-447 (2)(a)(iii)
- Explosives Site Plan WAC 296-52-65030
- Heat Exposure (Outdoor) WAC 296-62-09530,
- Machinery: Energy Control (Lockout/Tagout) Program WAC 296-803-20005
- Machinery: Safe Distance Safeguarding Program (for press brakes) WAC 296-806-46508
- Noise: Hearing Loss Prevention Program WAC 296-817-200
- Radiation (non-ionizing): Control and Monitoring Program WAC 296-62-09005 (2)