The first stone was put on November, 29- 2003, the project was started on December 23- 2003 the airport was accomplished in two main Stages:
Stage I:
Constructing Terminal Building started on December, 23-2003 and finished on November, 15-2004.
Stage II: Constructing the main components of the airport and facilities Building:
- Main Runway 3500 m. 45m width with two side shoulders. Each 7.5m.
- Parallel Taxiway 3500 m, 30 m width with two side shoulders each 3 meter.
- Two rapid Taxiways.
- Two connection Taxiways between Runway and Taxiway.
- Apron width 50000m2.
- Two connector Taxiways between parallel Taxiway and Apron.
- Technical and Administration Building.
- Control Tower.
- Main power supply
- Metrology Building
- Fire fighting and Rescue Building
- Security Building.
- Garage for heavy Vehicle.
- Shad for Apron Vehicles.
- Main Entrance Building.
- Security Towers.
- Navigation systems ILS CAT, DVOR, DME.
- Communicating systems. AFTN, ATIS, VHF-UHF.
- Portable water system.
- Sewerage system and treatment units.
- Fuel storage and Fuel station.
- Runway lighting system.
- Approach Lighting system CAT 1.
- Taxiway and Apron Lighting system.
- AWOS, Automatic weather observation system.
- Main access and inner Roads.
- Security Road -16 KM.
- Street and Fence Lighting system.
- Telephone system.
- Radio System (Motorala).
Terminal:
-
Area m2 3500
-
Departure hall m2 1000.
-
Arrival hall m2 800.
-
VIP homage. M2 250.
-
Detection system.
-
Rapiscan Security Machine
|