Success Cases. Success Cases. Huawei Data Center Facility Solution HUAWEI TECHNOLOGIES CO., LTD.

Save this PDF as:

Size: px
Start display at page:

Download "Success Cases. Success Cases. Huawei Data Center Facility Solution HUAWEI TECHNOLOGIES CO., LTD."

Transcription

1 Success Cases Huawei Data Center Facility Solution Success Cases HUAWEI TECHNOLOGIES CO., LTD.

2 02 Huawei Data Center Facility Solution Success Cases 2016 Data Center Cloud Technology Innovation Award in Asia Pacific 2015 DCD Asia-Pacific Modular Deployment Award 2016 IT Awards Platinum Award in Power Supply and Distribution Domain 2016 Efficient Data Center Excellent Product Award 2015 China Smart Data Center Preferred Brand Award 2015 CDCC Excellent Internet Data Center Award 2016 Excellent Data Center Award 2015 Excellent Data Center Product and Solution Award ICTresearch report, national share of Huawei's modular data center No IHS report, global shipments of Huawei's prefabricated modular data center No.1

3 Huawei Data Center Facility Solution Success Cases 03 With the rapid development of cloud computing and mobile Internet, traditional data centers are faced with many challenges, such as high energy consumption, long construction period, difficult capacity expansion, and inefficient management. To meet the cloud computing and virtualization requirements and reduce the data center operating expense (OPEX), Huawei has launched new-generation data center facility solutions. Huawei data center facility solutions adopt modular design and integrate the cabinet, power supply and distribution, cooling, integrated cabling, and management systems to satisfy customer demands for efficient, reliable, fast, flexible, intelligently managed data centers in the cloud era. Huawei Data Center Facility Products and Solutions Prefabricated Data Center (Outdoor Scenario) Prefabricated Data Center Modular Data Center (Indoor Scenario) Smart Mini Data Center Core Components UPS FusionModule1000A Air-cooled Scenario FusionModule500 (Single cabinet, 9 kw) Smart Small Data Center 1~800kVA Precision Air Conditioner FusionModule1000B Water-cooled Scenario FusionModule800 (2 8 cabinets in a row, 15 kw) Medium/Large 11~253kW Management system FusionModule1000B FusionModule2000 & 5000 (multiple cabinets) NetEco6000

4 04 Huawei Data Center Facility Solution Success Cases CONTENTS Telecom Industry P08 Government Industry P20 Prefabricated Data Center for Mexico Altan Group Telenor Myanmar 2K Telecom Romania AKADO Russia Taman Tekno Indonesia CANTV Venezuela Vert Brazil Viva Bahrain Modular Data Center for China Mobile International Limited Modular Data Center for Hohhot Unicom Modular Data Center for Wuxi Telecom Cloud Data Center for Yangzhou Mobile Data Center for Shanghai Unicom in Zhoupu China Mobile Harbin Heilongjiang China Mobile Southern Base China Unicom Gui'an Cloud China Unicom Huangcun Beijing Ulanqab Cloud Service Data Center Yancheng Cloud Data Center Yuxi Cloud Data Center Luzhou Cloud Data Center Suzhou Cloud Data Center Fengxi Smart Data Center Shaoxing e-government Cloud Data Center Sanya e-government Cloud Data Center Modular Data Center for Changzhou Public Security Bureau Modular Data Center for Qinghai Public Security Department Modular Data Center for Guizhou Police Cloud Modular Data Center for Nanjing Public Security Bureau Modular Data Center for Huzhou Public Security Bureau Modular Data Center for Public Security Bureau of Aksu Prefecture, Xinjiang Modular Data Center for Jiuquan Public Security Bureau Smart Small Data Center for Public Security Bureau of Hongta District, Yuxi City Smart Small Data Center for Pudong District Court of Shanghai Modular Data Center for Yunnan Meteorological Bureau Modular Data Center for Bazhong Municipal Personnel Bureau of Sichuan Province Modular Data Center for Panlong District, Kunming Modular Data Center for Yunnan Drug Treatment Administration

5 Huawei Data Center Facility Solution Success Cases 05 Ghana e-government Project Prime Minister's Department Malaysia IPICYT Mexico Mozambique Government Mali Government African Union Conference Center Ethiopia Inner Mongolia Public Security Bureau Hefei Municipal Public Security Bureau Higher People's Court of Guangxi Province Shaanxi Provincial Department of Justice Zhuhai Local Taxation Bureau Wuhu Government Shandong Computer Science Center Hunan Yongxing Smart City Guangxi Quality and Technical Supervision Bureau Inner Mongolia Audit Office Financial Industry P44 CBE Ethiopia Bank Alfalah Limited Pakistan Ethiopia Commercial Bank Smart Small Data Center for Orient Finance Holdings (Hong Kong) Limited Smart Mini Data Center for Industrial and Commercial Bank of China Modular Data Center for Agricultural Bank of China Modular Data Center for Qishang Bank Modular Data Center for China Everbright Bank Smart Small Data Center for Bank of Guiyang Smart Small Data Center for Yunnan Rural Credit Cooperatives Association Smart Small Data Center for China Pacific Insurance Co., Ltd. Modular Data Center for Taikang Life Insurance Co., Ltd. Smart Mini Data Center for Qian Hai Life Insurance Co., Ltd. China Construction Bank Guangdong China Construction Bank Postal Savings Bank of China China Citic Bank China Guangfa Bank Guilin Bank Shaanxi Rural Credit Cooperatives Union Citic Trust China ISP Industry P58 Prefabricated Data Center for Myanmar Golden Eleven Sun Network (Hong Kong) Ltd. DANAWA Malaysia ONYX Group Guatemala Gateway Technology Development Co.Ltd Hong Kong DELWP Australia Cloud Data Center for Tianjin Zhenyun Technology and Development Co., Ltd. Modular Data Center for Shanghai Baosight Software Company Tencent China 21Vianet China Guofu Guangqi Shanghai Vipshop China CITIC Networks

6 06 Huawei Data Center Facility Solution Success Cases Media Industry P70 Modular Data Center for Jiangsu Broadcasting Corporation Prefabricated Data Center for Hubei TV Station Convergent Media (Yangtze River Cloud) Prefabricated Data Center for Yunnan Communication Group People's Daily Phoenix New Media China Education Press Agency Shenzhen Times Network Media Shenzhen Media Group Hunan TV Program Henan Elephant Financial Media Group Gansu Press and Radio and Television Bureau Changxin Media Group Large Enterprises P78 Dusse Germany Sinar Mas Group Indonesia Shaw Organization Singapore Anabatic Technologies Philippines SDEC Saudi Arabia HGISC Saudi Arabia Benfica Portugal Nikulin Circus Moscow, Russia Modular Data Center for Shanghai Semiconductor Manufacturing International Corporation Modular Data Center for STATS ChipPAC Modular Data Center for Haiqi Group Zoomlion Heavy Industry Shenhua Beijing Guohua Electric Power JMCG China Shanghai Automotive China Merchants Group Tongwei Group Shanghai Huayi Group Changan PSA Automobiles Luoyang Institute of Refractories Research (LIRR) Chenzhou Tobacco Monopoly Bureau Education Industry P92 Modular Data Center for Bisha University in Saudi Arabia Data Center for King Mongkut's Institute of Technology Ladkrabang (KMITL) in Thailand Mackenzie Presbyterian University Brazil Adigrat University Ethiopia Kazan Federal University Russia Modular Data Center for Sun Yat-sen University Smart Small Data Center for Nanjing University of Posts and Telecommunications Smart Small Data Center for Wuhan University Modular Data Center for Guangxi University Smart Mini Data Center for Education Bureau of Minhang District, Shanghai Smart Mini Data Center for Education Metropolitan Area Network of Pudong New Area, Shanghai Jinan University Central South University Chengdu University Inner Mongolia Radio & TV University Taiyuan University of Technology Institute of Disaster Prevention Qingdao Education Bureau Guangdong Audio-Visual Education Museum

7 Huawei Data Center Facility Solution Success Cases 07 Healthcare Industry P106 Togo e-health Yamama Hospital Saudi Arabia Modular Data Center for Chinese PLA General Hospital (301 Hospital) Modular Data Center for Children's Hospital of Fudan University Modular Data Center for Renmin Hospital of Wuhan University Modular Data Center for Shanghai Municipal Hospital of Traditional Chinese Medicine Smart Small Data Center for Chengdu Ai'er Eye Hospital Smart Small Data Center for People's Hospital of Huzhu County, Qinghai Province First Affiliated Hospital of Zhengzhou University Xinjiang Autonomous Region People's Hospital Nanjing Drum Tower Hospital Shenzhen TCM Hospital Sanmenxia Central Hospital Beijing Chaoyang District Health Bureau Health Department of Tibet Autonomous Region Transportation Industry P116 Prefabricated Data Center for Dubai International Airport Papua New Guinea Airport Mexico City Airport Colombian FCM's Smart Transportation System Modular Data Center for Guangzhou Metro Modular Data Center for Rizhao Port Group Modular Data Center for Yunnan Highway Bureau Modular Data Center for Shentong Bombardier CRSC China Huangshan High Speed Railway Passenger Depot Line 8 Beijing Subway China First Highway Engineering Co., Ltd. Inner Mongolia Department of Communications Tianjin Expressway Group CSSC Energy Industry P126 Modular Data Center for Ethiopian Electric Utility Modular Data Center for Halfaya Oil Field in Iraq Smart Small Data Center for Turkey OEPSAS EUAS Turkey Saudi Electricity Company (SEC) Pemex Mexico Russian Grids Petrobras Brazil Russian Grid (FSK) Modular Data Center for State Grid Information and Telecommunication Group Co., Ltd. Modular Data Center for Qinghai Electric Power Company in Haihu New District Modular Data Center for Yalong River Hydropower Development Company, Ltd. Modular Data Center for Global Energy Interconnection Research Institute Prefabricated Data Center for Chongqing Jiangbei Electric Power Company Modular Data Center for State Grid Pingxiang Electric Power Company Modular Data Center for China Power Engineering Consulting Group Co., Ltd. Hunan Electric Power Corporation Research Institute Headquarters of China Datang Corporation Huaneng Taiyuan Dongshan Power Plant Huabei Oilfield Jiujiang Petrochemical China National Coal Group

8 08 Huawei Data Center Facility Solution Success Cases Telecom Industry Success Cases Prefabricated Data Center for Mexico Altan Group Telenor Myanmar 2K Telecom Romania AKADO Russia Taman Tekno Indonesia Huawei Data Center Facility Solution Success Cases CANTV Venezuela Vert Brazil Viva Bahrain Modular Data Center for China Mobile International Limited Modular Data Center for Hohhot Unicom Modular Data Center for Wuxi Telecom Cloud Data Center for Yangzhou Mobile Data Center for Shanghai Unicom in Zhoupu China Mobile Harbin Heilongjiang China Mobile Southern Base China Unicom Gui'an Cloud China Unicom Huangcun Beijing

9 Huawei Data Center Facility Solution Success Cases 09 Prefabricated Data Center for Mexico Altan Group Supported by the government, Mexico Altan group obtained the 700M frequency band and signed a fixed schedule with the government. The group needs to complete the deployment of the entire wireless network in three months and it chose five local operators including Axtel to construct the transmission network. To meet the government and Altan's schedule requirements, Huawei provides Axtel with the FusionModule1000A prefabricated all-in-one data center solution, which supports deployment of three to seven CT cabinets. The solution features unified space, is easy to maintain, and adopts two layers of steel plates and rock wool, ensuring high security. Devices are prefabricated in the factory and hoisted as a whole onsite, enabling quick delivery. Telenor Myanmar Telenor Myanmar obtained a new license from the Myanmar government in It needed to build core equipment rooms and site equipment rooms to bear upper-layer services so that Telenor can quickly seize the market. The customer required a low PUE and high reliability. Considering the poor construction conditions, long rainy season, and onsite construction difficulty, Huawei provided the pre-integrated FusionModule1000B prefabricated modular data center solution. The solution uses cold aisle containments, in-row air conditioners, and efficient modular UPS. The data center achieves a PUE of 1.5 and was delivered in four months.

10 10 Huawei Data Center Facility Solution Success Cases 2K Telecom Romania The existing Data Center for 2K Telecom Romania could not keep pace with its service growth. 2K Telecom required an efficient and energy saving data center that supports phased deployment and complies with the Tier 3 standard. Huawei provided the two-phase FusionModule1000 prefabricated data center solution: one IT Container and two Power Containers in phase 1 and two IT Containers and one Cooling Container in phase 2 for capacity expansion. Both the solar energy and power grid are used for power supply to reduce energy consumption. The phase 1 project was delivered within three months and passed the Tier 3 certification. AKADO Russia AKADO is the largest multi-service telecommunication company in Moscow. It planned to expand its co-location and private cloud services in Moscow, and a new data center was therefore required. Huawei provided the FusionModule2000 smart modular data center solution, which meets the customer's requirements for high reliability (Uptime certification, Tier 3). Thanks to modular design, the data center was deployed at shorter time than expected and meets future capacity expansion requirements.

11 Huawei Data Center Facility Solution Success Cases 11 Taman Tekno Indonesia Indosat is the third largest mobile operator in Indonesia. It is dedicated to cabling, bandwidth leasing, data center leasing, and cloud services. Huawei provided the FusionModule2000 smart modular data center solution which uses the modular design and is therefore easy to expand. This design meets the customer's requirements for on-demand capacity expansion with service growth. Huawei also provided the NetEco intelligent management system to improve O&M efficiency, thereby reducing the OPEX for the customer. CANTV Venezuela CANTV is the largest comprehensive telecom operator in Venezuela. A traditional data center has a long deployment time and is difficult to plan, which restricts the rapid development of CANTV. Therefore, CANTV was seeking a data center solution that supports fast deployment. Huawei provided the FushionModule1000 container modular data center solution and completed the deployment of the data center infrastructure within four months. The solution allows the customer to expand the capacity on demand, reducing the CAPEX by about 40%.

12 12 Huawei Data Center Facility Solution Success Cases Vert Brazil Vert is one of the largest Data Center operators in the world. Vert Brazil needed to build a new data center for leasing to meet the big data operation requirements. The customer required fast time to market for the data center. Huawei provided the FusionModule1000 prefabricated data center solution which integrates power supply and distribution, cooling, UPS, and intelligent management subsystems. The solution can provide one-stop deployment and O&M services. Only the site area and power are required for the deployment, allowing the data center service to go online quickly. Viva Bahrain Viva Bahrain is a subsidiary of STC in Bahrain. It planned to reconstruct its data center to support its ICT service development. The customer required the data center to adopt the modular design, support high density, save energy, and have a low TCO. Huawei provided the FusionModule1000 prefabricated data center solution. The containers are prefabricated and therefore easy to transport and deploy. The containers also passed the Tier 3 certification. The data center adopts efficient UPS and advanced in-row cooling solution. The data center reduces deployment time by 50% and TCO by 30% for the customer when compared with a traditional data center.

13 Huawei Data Center Facility Solution Success Cases 13 Modular Data Center for China Mobile International Limited China Mobile International Limited (CMI) is a wholly owned subsidiary of China Mobile. As an integrated telecommunications operator who has the largest global network, the largest number of customers, and the highest market value, CMI provides professional high-quality one-stop services for enterprises worldwide. CMI needs to build a new data center for the leasing business, so Huawei provides five sets of FusionModule2000 smart modular data center solutions which adopt a modular design. Pre-integration reduces delivery time. In-row cooling and the efficient UPS reduce the PUE. Modular Data Center for Hohhot Unicom Hohhot Unicom is the largest basic communications operator and IDC service provider in Hohhot. It provides secure, reliable, fast, and comprehensive IDC basic businesses and value-added services for various users, and provides one-stop services nationwide for users. In recent years, Hohhot Unicom IDC business revenue has grown rapidly and the business has become a new source of growth. To ease the tense situation of IDC cabinets, Hohhot Unicom takes the lead to conduct network exit reconstruction of PSTN communications equipment rooms in China, build IDC equipment rooms, and reuse the original infrastructure of No.2 hub building. During the first phase of network exit, one equipment room is reconstructed. Huawei provides six sets of FusionModule2000 smart modular data center solutions which contain 102 cabinets and are deployed rapidly. The racks are all booked after going online.

14 14 Huawei Data Center Facility Solution Success Cases Modular Data Center for Wuxi Telecom In 2015, China Telecom Wuxi branch revitalized and reconstructed a large number of idle equipment room resources into IDC equipment rooms based on the PSTN network exit and the needs of network reconstruction, which improved benefits. Wuxi Telecom IDC business is developing rapidly, while rack resources are not sufficient. Building 214 has good space, electricity, and other basic conditions, and some of the original PSTN equipment room functions are exited from network, so the building is suitable to be reconstructed into an IDC equipment room. Huawei provides seven sets of FusionModule2000 smart modular data center solutions. Smart modules are prefabricated in the factory and assembled onsite, greatly reducing onsite deployment time. Delivery is completed in 45 days. The smart modules adopt in-row air conditioners and cold-aisle or hot-aisle containment, which realizes accurate air supply and achieves high efficiency. The average PUE is less than Cloud Data Center for Yangzhou Mobile The cloud data center for Yangzhou Mobile is jointly built by Yangzhou economic development zone, China Mobile, and Huawei. It is mainly used to deal with cloud computing and big data services. The initial investment in this project reaches RMB 300 million. The equipment rooms in the first phase house 1,658 cabinets and have been built in The equipment rooms in the second phase house about 2,700 cabinets and are expected to be completed in The project adopts 53 NetCol8000-C130D in-room chilled water air conditioners which are built based on the international Tier III standards. The air conditioners adopt 14 o C mesothermal water design, and the air outlet temperature is 23 o C. The indoor units adopt N+1 backup and have built-in automatic switchover between dual power supplies. The air conditioners are deployed with lowered EC fans and pressure difference control kits, and the fan speed can be adjusted precisely based on the real-time pressure difference. Compared with the traditional air supply and return control mode, this method can save energy by more than 10%. In addition, the air conditioners adopt modular design and are equipped with 7-inch true color touch screens which display key parameters such as the cooling capacity and air volume in real time, helping O&M personnel quickly grasp the unit working status and simplifying data center O&M.

15 Huawei Data Center Facility Solution Success Cases 15 China Mobile Harbin Heilongjiang China Mobile attached great importance to the pilot project in Harbin with the expectation that the large data center can achieve a low TCO and high efficiency. Huawei provided the FusionModule2000 smart modular data center solution. This solution adopts the cold aisle containment design, which effectively isolates cold air from hot air and therefore improves cooling efficiency and lowers power consumption. The project also uses the free cooling solution to save energy by utilizing natural cooling sources when the ambient temperature is low. The project achieves an average PUE of 1.2 annually, which is the record low PUE for data centers in China. The project also won the 2013 China Telecom Green Data Center Award. China Mobile Southern Base Southern Base is a manufacturing and research base built by China Mobile in Guangdong province, with a total investment of 6.6 billion RMB and a land area of 490,000 square meters. To meet the requirements for cloud computing and virtualization services, Southern Base required a high-density and efficient data center solution. Huawei provided the FusionModule2000 smart modular data center solution which adopts the hot aisle containment design and uses in-row air conditioners for closely coupled cooling. The data center supports a power density of 3 9 kw per rack, which meets the density requirements and is energy saving. The average PUE is as low as 1.6.

16 16 Huawei Data Center Facility Solution Success Cases China Unicom Huangcun Beijing China Unicom Beijing planned to reconstruct two existing warehouses into a smart modular data center. The customer hoped to minimize the reconstruction workload without compromising the performance, reliability, and efficiency of the data center. Huawei provided the FusionModule2000 smart modular data center solution which is simple, reliable, and efficient. Huawei deployed 43 independent smart modular data center (1100 IT cabinets) in the existing warehouses. The onsite delivery took only 40 days. In addition, cabinets with power density of 5 kw or 10 kw per rack are supported. China Unicom Gui'an Cloud Gui'an Cloud Base is one of the three bases planned by China Unicom. In the phase 1 project, the customer needed an energy-efficient data solution to be rapidly deployed in a warehouse building. Huawei provided the warehouse FusionModule2000 smart modular data center solution for the application scenario. The solution uses efficient modular UPS, in-row air conditioners that support precision cooling, and cold and hot aisle containments, attaining a PUE of nearly 1.3. The modular design as well as prefabrication and precommissioning greatly reduces the deployment time. Delivery of 1100 racks from equipment entry to service rollout took only 40 days.

17 Huawei Data Center Facility Solution Success Cases 17 Data Center for Shanghai Unicom in Zhoupu The IDC in Zhoupu, Shanghai is the largest data center of Shanghai Unicom. The gross floor area of the project is about 20,000 square meters and there are four floors. The total number of cabinets in the second phase exceeds 2,300 and the power density per cabinet is 5 kw. The project adopts the Huawei FusionModule2000 smart modular data center solution. Subsystem packaging, prefabrication in the factory, onsite one-stop assembly, and modular design of the entire structure and components realize on-demand deployment and expansion, greatly simplify the overall construction procedure, and enable services to quickly roll out. Huawei modular efficient UPS5000-E is used to supply power. Huawei NetCol5000-C in-row chilled water air conditioners and NetCol8000-C in-room chilled water precision air conditioners are used for cooling. Cold-aisle containment, local cooling design, and optimized airflow organization are used to reduce the PUE. The solution meets the Uptime Tier III + standard, is certified as a national class A data center, and meets customer requirements for high availability. Modular construction enables all cabinets to be deployed and services to roll out in 10 months, meeting subsequent service capacity expansion requirements. At the same time, high-density deployment reduces footprint and improves earnings ratio.

18 18 Huawei Data Center Facility Solution Success Cases Government Industry Success Cases Huawei Data Center Facility Solution Success Cases Ulanqab Cloud Service Data Center Yancheng Cloud Data Center Yuxi Cloud Data Center Luzhou Cloud Data Center Suzhou Cloud Data Center Fengxi Smart Data Center Shaoxing e-government Cloud Data Center Sanya e-government Cloud Data Center Modular Data Center for Changzhou Public Security Bureau Modular Data Center for Qinghai Public Security Department Modular Data Center for Guizhou Police Cloud Modular Data Center for Nanjing Public Security Bureau Modular Data Center for Huzhou Public Security Bureau Modular Data Center for Public Security Bureau of Aksu Prefecture, Xinjiang Modular Data Center for Jiuquan Public Security Bureau Smart Small Data Center for Public Security Bureau of Hongta District, Yuxi City Smart Small Data Center for Pudong District Court of Shanghai Modular Data Center for Yunnan Meteorological Bureau Modular Data Center for Bazhong Municipal Personnel Bureau of Sichuan Province Modular Data Center for Panlong District, Kunming Modular Data Center for Yunnan Drug Treatment Administration Ghana e-government Project Prime Minister's Department Malaysia IPICYT Mexico Mozambique Government Mali Government African Union Conference Center Ethiopia Inner Mongolia Public Security Bureau Hefei Municipal Public Security Bureau Higher People's Court of Guangxi Province Shaanxi Provincial Department of Justice Zhuhai Local Taxation Bureau Wuhu Government Shandong Computer Science Center Hunan Yongxing Smart City Guangxi Quality and Technical Supervision Bureau Inner Mongolia Audit Office

19 Huawei Data Center Facility Solution Success Cases 19 Ulanqab Cloud Service Data Center Seizing the historical opportunity of joint development of Beijing, Tianjin, and Hebei, and fast-developing cloud computing industry, Ulanqab introduces and supports cloud computing and relevant industries as strategic industries. The data center covers a floor area of 22,000 square meters and is designed to house 1,500 cabinets. Huawei provides the smart module, modular UPS, air conditioner, and intelligent data center infrastructure management (DCIM) system. This project will promote Ulanqab to form an industrial base with scientific research input, operation service, and matched infrastructure, and help Ulanqab lay a solid foundation for realizing the long-term goal of "Ulanqab data center serving Beijing, Tianjin, and Hebei." Yancheng Cloud Data Center Yancheng cloud data center project is located in the big data industrial park of Yancheng. Its construction should meet the future technology development trend, that is, high efficiency and high density. The project adopts more than 30 sets of Huawei FusionModule2000 smart modular data center solutions as well as modular UPSs and in-row cooling devices. Cold and hot aisles are separated to reduce the cooling power consumption, meeting the energy-saving and emission reduction requirements of the group. Devices can be deployed in high-density mode and components can be prefabricated. High integration and unified design make the data center neat and beautiful.

20 20 Huawei Data Center Facility Solution Success Cases Yuxi Cloud Data Center Yuxi cloud data center is the local industry support center, information service and backup center in the southwest region, and big data processing center in the central region of Yunnan province and Southeast Asia. The data center covers a gross floor area of 12,000 square meters and adopts the Tier III+ standard. Huawei provides the full L1 solution, including the cabinet system, power distribution system, management system, and more than twenty 600 kva modular UPSs. After construction, 964 cabinets will be operating and the total electricity capacity will reach 10,750 kw. Luzhou Cloud Data Center Luzhou cloud data center is the most advanced and highest-level cloud computing data center in Luzhou. The floor area in the first phase is about 13,000 square meters, and 12 IT equipment rooms that can house 1,032 cabinets are planned, providing cloud computing service capacity of 20,000 cloud desktops. The data center adopts the international Tier III+ standard to access the networks of several operators, including China Mobile, China Unicom, and China Telecom, providing seven security service guarantees. The project adopts Huawei modular data center solution, which is prefabricated in the factory. Compared with a traditional solution, Huawei solution reduces the project duration by 50%. On-demand deployment supports the elastic growth of cloud computing. The solution adopts the Huawei modular UPS, cooling system, and DCIM system, ensuring optimal energy efficiency on the basis of reliable operation of the data center.

21 Huawei Data Center Facility Solution Success Cases 21 Suzhou Cloud Data Center In recent years, Suzhou city implements the dual-driving force strategy, that is, industrialization and urbanization, grasps the trend of Internet Plus to develop the cloud computing industry, and drives economic development with technology. The cloud computing industrial park covers an area of 100,000 square meters. 2,700 cabinets are planned in the first phase, which is for animation rendering, biomedicine, e-commerce, online mobile gaming, terminal manufacturing, and other fields to build a national cloud computing industry cluster. Huawei provides over sixty 400 kva modular UPSs, over 150 precision power distribution cabinets, over 120 in-row air conditioners, and over 140 in-room air conditioners. In high-density areas, air is supplied horizontally to eliminate local hotspots. In low-density areas, air is supplied from under the floor. Modular deployment reduces installation time by 20% and automatic diagnosis in case of faults is supported. The modular UPS is efficient even at a low load rate. Compared with a traditional tower-mounted UPS, the modular UPS saves energy by more than 10% at some load rates. The modular fully-redundant architecture reduces the risk of single point of failure. Smart and high-availability products help Suzhou cloud data center achieve efficient O&M and reliable operation. Modular Data Center for Beijing Municipal Government Service Center The Beijing Municipal Government Service Center requires that the new data center must use the edge-cutting equipment room technologies, can support the future government cloud service system, and can be deployed within two months. Huawei provides the modular equipment room solution. The equipment room is prefabricated in factories to support fast deployment. The in-row near-end cooling technology is used to improve the cabinet power density. In addition, the Huawei highly efficient UPS is used to reduce the PUE below 1.5.

22 22 Huawei Data Center Facility Solution Success Cases Fengxi Smart Data Center Fengxi smart data center is a pilot project of big data services in Xixian New Area, Shaanxi province. Some space is leased to local enterprises for hosting business. The total planned area of the three-floor equipment room is about 2,000 square meters. 378 IT cabinets are planned in the first phase, and the average power density is more than 5 kw. The cabinets are used to carry high-performance computing, cloud service, OA, and other businesses. Huawei provides the entire modular data center solution in the project center. In-row and in-room air conditioners are deployed together to meet the requirements of devices with different power densities on the cooling system. The 2N power supply system that consists of large-capacity modular UPSs ensures the highest reliability level. Shaoxing e-government Cloud Data Center Shaoxing e-government cloud data center is a key project of Shaoxing municipal government in The construction area of the data center is about 1,500 square meters. To integrate e-government resources and reduce administrative costs, the new data center is required to be innovative and energy-saving, and meet subsequent elastic expansion requirements. The project uses over 10 sets of Huawei FusionModule2000 smart modular data center solutions which adopt in-row cooling and aisle containment to save energy. The modular architecture enables fast deployment and easy capacity expansion.

23 Huawei Data Center Facility Solution Success Cases 23 Sanya e-government Cloud Data Center Sanya e-government cloud data center is built in accordance with the national class A data center standard. The data center ensures information security and meets the informatization requirements of Sanya government affairs and Hainan province tourism for more than five years in the future. The equipment room area of the data center is about 263 square meters. Huawei provides six sets of FusionModule2000 smart modular data center solutions. The average power consumption of each cabinet is 5 kw. The equipment room adopts cold-aisle containment. The PUE is less than 1.5. The 2N power supply system consists of modular UPSs, ensuring the overall stability of the data center higher than 99.98%. Wuhu Government Wuhu Government needs to build a government cloud data center. If the data center is deployed in a traditional equipment room in a building, the construction period of the equipment room will be long, which cannot meet the fast service launching requirements. Therefore, Wuhu Government chooses the FusionModule1000 prefabricated data center solution. Huawei provides the FusionModule1000 prefabricated data center solution. All components are prefabricated, and multiple containers can be combined. Therefore, it is unnecessary to build a dedicated equipment room. The solution supports fast deployment, reduces the construction period, and allows fast launching of services. In addition, the solution is energy efficient, which reduces the PUE and saves the operation costs.

24 24 Huawei Data Center Facility Solution Success Cases Modular Data Center for Anhui Provincial Government To promote information-based management and improve office efficiency, Anhui Provincial Government needs to build a data equipment room to provide reliable and efficient services for the government information network and intranet of the Anhui Provincial Party Committee. The safe, reliable, eco-friendly, efficient, and nice looking features of the Huawei FusionModule2000 smart modular data center meet the development trend of the data center in the future, and greatly improve the informatization level of the government. Modular Data Center for Changzhou Public Security Bureau To quicken the construction of the smart economic development and video networking project, Changzhou Public Security Bureau planned to upgrade and expand the capacity of the existing data center. The capacity expansion and maintenance must be performed online without affecting the operation of the existing businesses. The solution should ensure flexible capacity expansion when businesses grow in the future. Huawei provides the FusionModule2000 smart modular data center solution. During capacity expansion, the solution can be decoupled from the existing equipment room environment, which facilitates deployment. The modular design supports on-demand deployment when businesses grow in the future. The NetEco smart monitoring platform is deployed to monitor the environment and equipment as well as realize security linkage and other functions, improving O&M efficiency.

25 Huawei Data Center Facility Solution Success Cases 25 Inner Mongolia Public Security Bureau To accelerate construction of the information system, the Inner Mongolia Public Security Bureau builds an information center equipment room with a gross floor area of nearly 2000 m 2. Huawei FusionModule2000 smart modular data center solution adopts the standard components and modular structure and can be deployed as required. Energy efficient technologies, such as energy efficient core devices (including highly efficient UPS and dual-data Center variable frequency in-row air conditioner) and aisle containment, are employed to help the customer protect the environment, save energy, and reduce emission. Modular Data Center for Qinghai Public Security Department A new data center is planned in the new Public Security Department building to meet the informatization requirements of the public security system in the future. Apart from excellent reliability for the information system that carries public security, the Public Security Department also hopes that the new data center can achieve quick delivery and save energy and that advanced management tools are used to reduce O&M pressure. Huawei provides the FusionModule2000 smart modular data center solution. The number of planned cabinets is 179, and the solution is delivered in six months. The power supply and distribution system adopts 2N architecture and the PUE is as low as 1.5, which ensures reliability and saves electricity costs.

26 26 Huawei Data Center Facility Solution Success Cases Modular Data Center for Guizhou Police Cloud The public security of Guizhou province starts the construction of the police cloud from the provincial department to prefecture-level cities. It is required that the data center construction standard be unified for the provincial department and prefecturelevel cities to facilitate O&M management. Besides, quick deployment is also required to match service rollout. Huawei provides 16 sets of FusionModule2000 smart modular data center solutions for the provincial department, Zunyi city, Kaili city, and other prefecture-level cities. Modular standard interfaces are adopted. Prefabrication in the factory ensures unified and standardized construction from the provincial department to prefecture-level cities, simplifying deployment and facilitating O&M. Modular Data Center for Yunnan Province Public Security Fire Brigade Yunnan Province Public Security Fire Brigade needs to build an advanced data center to ensure smooth, stable, and fast launching of important services of the fire-fighting units throughout the province, such as team management, solder management, fire fighting, and in-service training. Huawei FusionModule2000 smart modular data center solution adopts aisle containment, dual-data Center variable frequency in-row air conditioner, and horizontal flow supply, and does not need the raised floor. This solution not only improves the general cooling efficiency, but also can be deployed inside the equipment room, which is only 2.7 meters high per floor. The NetEco management system can efficiently manage each module, and support local and remote monitoring.

27 Huawei Data Center Facility Solution Success Cases 27 Modular Data Center for Nanjing Public Security Bureau The data center must be delivered in three weeks for the reconstruction project of the main control equipment room of the technical investigation team of Nanjing Public Security Bureau. In addition, the data center must meet the capacity expansion requirements in the next three to five years and the management system should be easy to operate. Huawei provides the FusionModule2000 smart modular data center solution. Each functional component is prefabricated in the factory and assembled onsite like building blocks. Deployment is fast and simple, and capacity expansion is easy, which meets the existing service requirements and also realizes elastic capacity expansion of the infrastructure layer to meet business developing requirements. The configured NetEco smart management system is equipped with a visual and easy-to-use operation interface, improves O&M efficiency, raises monitoring warnings in real time, and enables unattended operation. Hefei Municipal Public Security Bureau Hefei Municipal Public Security Bureau needs to build a comprehensive, smart, and highly efficient video surveillance management platform that can share video information among multiple departments in the city to build a safe city. This project is called Tianwang project. To address these requirements, Huawei provides the FushionModule1000 All-in-One solution. This solution does not need a newly-built dedicated equipment room, which saves the project costs and reduces the delivery time. The solution can meet the customer's requirements for fast solution deployment and fast service launching.

28 28 Huawei Data Center Facility Solution Success Cases Modular Data Center for Huzhou Public Security Bureau The construction site of the business technology room of Huzhou Public Security Bureau is located at the northwest side of the Huzhou Public Security Bureau building. The gross floor area is about 22,793 square meters. The existing equipment room cannot meet the future business developing requirements. Therefore, a new equipment room is to be constructed in the new building. Huawei provides four sets of FusionModule2000 smart modular data center solutions, including twenty-four 25 kw in-row air conditioners, 140 IT cabinets, and eight precision power distribution cabinets. Modular solutions feature easy construction, high efficiency and energy saving, and easy O&M. Modular Data Center for Public Security Bureau of Aksu Prefecture, Xinjiang Public Security Bureau of Aksu Prefecture, Xinjiang is the functional department in charge of public security work in the prefectural administrative office. The bureau requires the data center to solve difficult maintenance and other issues caused by the large traffic volume. Huawei provides seven sets of FusionModule2000 smart modular data center solutions, which contain 279 cabinets in total. All devices in the smart modules are installed in the factory and highly integrated, enabling fast project delivery. The unified O&M management system greatly simplifies O&M, makes O&M efficient, and integrates monitoring and management.

29 Huawei Data Center Facility Solution Success Cases 29 Modular Data Center for Jiuquan Public Security Bureau In the new building of Jiuquan Public Security Bureau, a new data center is built. The top of the building was completed by the end of At that time, the data center construction started. Huawei provides four sets of FusionModule2000 smart modular data center solutions. Relevant key components, neat and beautiful, are prefabricated in the factory. Onsite deployment and fast commissioning ensure fast service rollout. Smart Small Data Center for Public Security Bureau of Hongta District, Yuxi City Public Security Bureau of Hongta District, Yuxi City intends to deploy a data center in one room of the office building, but the space of the room is limited. Since the need of "Safe Hongta" service rollout is urgent, the data center needs to be deployed in a short time. Huawei provides the FusionModule800 smart small data center solution, which integrates the power supply, cooling, cabinet, and management systems. The solution is delivered as a whole. Multiple data centers can be managed remotely, minimizing the difficulty in O&M. The high integration design reduces the footprint by 50%. It takes only four hours to build the data center onsite and two days to deliver it, enabling fast service rollout.

30 30 Huawei Data Center Facility Solution Success Cases Higher People's Court of Guangxi Province In the Guangxi Zhuang Autonomous Region, a Higher People's Court is set up to manage 15 intermediate courts and 111 grassroots courts. The Higher People's Court needs to build an equipment room to implement information-based political and legal work. Huawei provides a modular equipment room solution, which adopts the single-row and double-row hybrid module deployment mode to support fast onsite deployment and maximize the space utilization. Smart Small Data Center for Pudong District Court of Shanghai To promote e-government in public security organs, procuratorial organs, and people's courts, Pudong District Court of Shanghai reconstructs nine branch equipment rooms in the area under its jurisdiction to meet the e-government service requirements. For this project, Huawei provides FusionModule800 smart small data center to meet customer requirements. The cabinet with the aisle is 1,350 mm deep, meeting the deployment environment of the customer's equipment room.

31 Huawei Data Center Facility Solution Success Cases 31 Shaanxi Provincial Department of Justice Due to service constraints, the data center equipment room of Shaanxi Provincial Department of Justice must be quickly deployed to meet subsequent service development requirements, but the existing equipment room has limited space and cannot meet the requirement for capacity expansion. To address these requirements, Huawei provides the FusionModule1000 prefabricated data center solution. Each container integrates the cabinet, power distribution box, cooling system, and monitoring system. No building needs to be built. The FusionModule1000 prefabricated data center is prefabricated in factories and can be deployed within a week. Shandong Computer Science Center Shandong Computer Science Center is the earliest nonprofit scientific research institution in Shandong that is dedicated to research of computer technologies. To promote application and development of the government cloud service in Shandong province, Shandong Computer Science Center initiates the cloud data center project. Huawei provides the FusionModule2000 smart modular data center solution, which has low requirements for the deployment scenario. The original 100 m 2 conference room is reconstructed into the equipment room. The solution meets the low floor height requirement. After the data center is built, the power density is as high as 10 kw per cabinet.

32 32 Huawei Data Center Facility Solution Success Cases Modular Data Center for Guangdong Information Center Since 1988, the People's Government of Guangdong Province has had jurisdiction over 21 prefecture-level cities. The existing equipment room of Guangdong Information Center now cannot meet the increasing informatization requirements. Guangdong Information Center urgently needs to build a new data center to ensure normal operation of services. Huawei FusionModule2000 smart modular data center features fast deployment and can meet the customer's fast service launching requirements. The highly reliable N+1 design can effectively prevent single-point failures and ensure safe and stable operation of services. Hunan Yongxing Smart City The Yongxing town of Hunan Chengzhou city was successfully enrolled in the 2013 national smart city pilot list. The town requires that the data center infrastructure can be delivered within three months, and the average power per cabinet is not lower than 10 kw. On the later stage, the cabinet capacity can be expanded to 20 kw per cabinet. Huawei cluster FusionModule1000 prefabricated data center solution well addresses the customer's requirements. All components are prefabricated, and can be quickly assembled and delivered onsite. The in-row air conditioner is used to ensure that the power density of the data center can reach 10 kw per cabinet, and at most 21 kw per cabinet.

33 Huawei Data Center Facility Solution Success Cases 33 Guangxi Quality and Technical Supervision Bureau The Quality and Technical Supervision Bureau of Guangxi Zhuang Autonomous Region is a department directly under the People's Government of Guangxi Zhuang Autonomous Region, and implements the vertical management system under the Guangxi Zhuang Autonomous Region. The equipment room of the Quality and Technical Supervision Bureau has been running for many years, and encounters problems, such as outdated equipment, low efficiency of power supply and cooling system, high failure rate, large noise generated by the air conditioners, and many potential security risks. Huawei proprietary FushionModule2000 smart modular data center can properly resolve these problems. All components of the data center can be prefabricated in factories, and therefore, the equipment room can be quickly reconstructed. In addition, the data center adopts the unified platform to implement smart management of devices, improving the energy efficiency and management efficiency of the equipment room. Inner Mongolia Audit Office The space of the existing equipment room of Inner Mongolia Audit Office is insufficient due to service development. Inner Mongolia Audit Office needs to build an equipment room in their office building. The equipment room can be deployed in several phases, and must support flexible capacity expansion and is nice looking. To address these requirements, Huawei provides the modular equipment room solution. The equipment room can be built in the office building in several phases. The solution supports smooth capacity expansion of the cooling system and UPS while ensuring the nice arrangement of the equipment room.

34 34 Huawei Data Center Facility Solution Success Cases Modular Data Center for Inner Mongolia Autonomous Region Seismological Bureau The Seismological Bureau of Inner Mongolia Autonomous Region is led by both the China Earthquake Administration (CEA) and the People's Government of the Inner Mongolia Autonomous Region. It is a government-affiliated institution that has administrative functions. The customer needs to deploy a space-limited equipment room in a new building of the Seismological Bureau, and the data center needs to provide end-to-end services. To address these requirements, Huawei provides the end-to-end solution of the singlerow modular equipment room. The equipment room is highly efficient, energy saving, and green, and meets the customer's reliability requirements for the equipment room. The smart management system can significantly improve the management efficiency of the equipment room, and reduce the operation costs. Modular Data Center for Yunnan Meteorological Bureau To build a future-proof information system, Yunnan Meteorological Bureau intends to build a new data center. Since the new service rollout schedule is tight, the infrastructure construction needs to be completed in three months. At the same time, the data center needs to adopt the latest energy-saving technology to ensure that the PUE is not higher than 1.5. Huawei provides the FusionModule2000 smart modular data center solution, whose functional components are highly standardized and prefabricated, meeting the customer's delivery time. The efficient modular UPS, inrow air conditioner, and cold-aisle containment maximize energy efficiency, ensuring that the average annual PUE is lower than 1.5.

35 Huawei Data Center Facility Solution Success Cases 35 Modular Data Center for Bazhong Municipal Personnel Bureau of Sichuan Province The data center of Bazhong Municipal Personnel Bureau is reconstructed from the existing office. The data center is 2.6 m high. The cabinet layout and cabling should not affect the overall function. The cooling devices in the data center need to be optimized. This project adopts Huawei FusionModule800 smart small data center solution, which is 2 m high. The devices are directly deployed on the floor. The air conditioner pipes as well as strong-current and weak-current cables are routed from the top, meeting the overall function need. The rack-type air conditioner and coldaisle containment separate hot air from cold air, meeting device cooling requirements. Key devices including the air conditioner and UPS are redundant, ensuring system reliability. Modular Data Center for Panlong District, Kunming To meet the e-government service requirements, the government of Panlong District, Kunming needs to reconstruct the existing equipment room, which is long and narrow. The deployment mode of dual-row smart modules cannot meet customer requirements. Huawei provides FusionModule800 smart small data center solutions. Two sets of FusionModule800 solutions are lined up so the cabinet with the aisle is only 1,350 mm deep, meeting the deployment environment of the customer's long and narrow equipment room.

36 36 Huawei Data Center Facility Solution Success Cases Modular Data Center for Yunnan Drug Treatment Administration To facilitate integrated management of department business, the data center project of Yunnan Drug Treatment Administration needs a unified network management system to implement remote O&M. Huawei provides the FusionModule2000 smart modular data center which adopts the NetEco management system. Intelligent O&M can be performed locally, local and remote monitoring is supported, and multi-level integrated control is also supported. Zhuhai Local Taxation Bureau To ensure safe and reliable operation of the electronic information system, Zhuhai Local Taxation Bureau needs to build a safe, practical, cost-effective, and energy efficient equipment room. Huawei modular equipment room solution adopts the cold aisle isolation technology to effectively reduce the PUE. In addition, the power distribution box integrates the UPS and array power distribution cabinet, which saves space in the equipment room and improves the overall arrangement of the equipment room.

37 Huawei Data Center Facility Solution Success Cases 37 Ghana e-government Project In Ghana, there is a lack of local maintenance personnel, especially skilled maintenance personnel. In addition, the local mains power supply is severely insufficient. The customer could not provide a building for data center deployment and hoped the new data center to be energy saving and fast to market. Huawei provided the FusionModule1000 prefabricated data center solution. The solution uses mains, backup generator, and UPS to ensure power supply reliability. The project was deployed within less than 12 weeks, achieves a PUE of lower than 1.5, and saves 40% energy. Prime Minister's Department Malaysia Prime Minister's Department is a Malaysian federal government department. The department required redundancy for the power cables, key devices, and critical service modules in the data center to ensure high reliability. Huawei provided the FushionModule2000 smart modular data center solution. The solution uses dual power supplies and adopts the redundancy design for key devices such as the UPS and in-row air conditioners, thereby ensuring high reliability for the data center. Thanks to the modular design and application of efficient devices and solution, the data center achieves a PUE lower than 1.6, reducing the OPEX by 30%.

38 38 Huawei Data Center Facility Solution Success Cases IPICYT Mexico IPICYT Mexico is a public research center with highly professional multidisciplinary academic groups and advanced infrastructure. No building was available for IPICYT to deploy a data center. Huawei provided the FushionModule1000A All-in-One prefabricated modular data center solution. A standard container integrates power supply, cooling, UPS, management system, and IT cabinets. The container was installed outdoors and put into use before the academic conference started and achieves a PUE lower than 1.5. Prefabricated Data Center for Lao's Science and Technology Department Science and Technology Department of Lao People's Democratic Republic planned to build a redundancy and backup center for Lao's national data center. The redundancy and backup center needed to be able to work in a high temperature environment and support flexible expansion and easy transportation. Huawei provided a standard 40-foot FusionModule1000 prefabricated data center with the 120 kva diesel generator as the backup power source. The data center uses prefabricated components and the modular design, facilitating expansion and transportation.

39 Huawei Data Center Facility Solution Success Cases 39 Prefabricated Data Center for NCC England The original Data Center for Northumberland County Council (NCC) had infrastructure in three rooms. The customer wanted to reconstruct the data center into a green data center whose power and cooling systems comply with the Tier 3 standard. Huawei provided the FusionModule1000 prefabricated data center solution that comprises one Power Container, one Cooling Container, and two IT Containers. The Power Container and Cooling Container are designed in compliance with the Tier 3 standard to ensure reliability. The in-row air conditioner and air flow containment were adopted, achieving optimal cooling performance. Mozambique Government The Mozambique government wanted to build a national data center for leasing. The government required an efficient data center that can maximize the return on investment. Huawei provided the FusionModule2000 smart modular data center solution. The solution adopts the cold aisle containment and in-row cooling technology, achieving optimal cooling performance. The NetEco intelligent management system delivered with the solution allows the customer to remotely monitor the data center status in real time, simplifying O&M and reducing labor cost.

40 40 Huawei Data Center Facility Solution Success Cases Prefabricated Data Center for Samoa Samoa is an island country to the south of the Pacific ocean. The Samoan government needed to deploy LTE networks and transmission devices to increase the network coverage in rural areas and accelerate informatization. To achieve these goals, a data center was required to support broadband and network deployment. However, the government did not have a suitable building for deploying the data center. In addition, the Samoan government required a power density of 6 kw per rack and delivery within one month. Huawei provided the FusionModule1000 prefabricated data center solution. The solution requires no building, supports fast delivery, and meets the customer's power density requirements of up to 6 kw per rack. In addition, the solution is efficient and energy saving, achieving a PUE of 1.5. Huawei's solution plays a key role for the customer to achieve their goals of increasing network coverage in rural areas and informatization. Mali Government Government sectors of Mali have separate data centers that were scattered, which poses high cost and makes it difficult to manage and maintain these data centers in a centralized manner. Huawei provided the FusionModule2000 smart modular data center solution that integrates the cooling, power supply and distribution, and management systems. The NetEco intelligent management system enables display of maintenance information, unified management, and simplified operation, greatly improving the O&M efficiency for the data center.

41 Huawei Data Center Facility Solution Success Cases 41 African Union Conference Center Ethiopia The new building of the African Union Conference Center is one of the landmarks in Ethiopia. The data center inside the building is a platform for holding the African Union conferences and therefore has high requirements on reliability. The customer expected the project to be delivered within six months. Huawei provided the FusionModule2000 smart modular data center solution. The UPS and power distribution system adopt the 2N architecture and are deployed in compliance with the Tier 4 standard, achieving ultra high reliability of 99.98%. Core components of the data center were prefabricated. The onsite deployment took only two weeks, allowing the project to be delivered ahead of schedule.

42 42 Huawei Data Center Facility Solution Success Cases CBE Ethiopia Success Cases Huawei Data Center Facility Solution Financial Industry Success Cases Bank Alfalah Limited Pakistan Ethiopia Commercial Bank Smart Small Data Center for Orient Finance Holdings (Hong Kong) Limited Smart Mini Data Center for Industrial and Commercial Bank of China Modular Data Center for Agricultural Bank of China Modular Data Center for Qishang Bank Modular Data Center for China Everbright Bank Smart Small Data Center for Bank of Guiyang Smart Small Data Center for Yunnan Rural Credit Cooperatives Association Smart Small Data Center for China Pacific Insurance Co., Ltd. Modular Data Center for Taikang Life Insurance Co., Ltd. Smart Mini Data Center for Qian Hai Life Insurance Co., Ltd. China Construction Bank Guangdong China Construction Bank Postal Savings Bank of China China Citic Bank China Guangfa Bank Guilin Bank Shaanxi Rural Credit Cooperatives Union Citic Trust China

43 Huawei Data Center Facility Solution Success Cases 43 CBE Ethiopia Commercial Bank of Ethiopia (CBE) is the biggest commercial bank in Ethiopia, CBE required safer and more reliable new data center with phased deployment. Huawei provided the FusionModule2000 smart modular data center solution for them. All 3 modular data centers had been deployed in different phases and can be flexibly extended with business development, which can reduce 30% of initial investment. Power supply and distribution system adopts 2N architecture, the switch status can be detected automatically, UPS parameters like capacity can be monitored in realtime, all these measures have been used to ensure the stable and continuous power supply for data center. Bank Alfalah Limited Pakistan Bank Alfalah is the sixth largest bank in Pakistan, totally over 500 branches in more than 170 cities in Pakistan. Its existing data center is running out of rack space. And with a high-rising power bills due to inefficient power distribution and cooling solution. Huawei provided innovative modular data center solution FushionModule2000 that features excellent precision in-row cooling NetCol5000 and modular UPS5000E, which significantly improves the system efficiency and reduce data center's power consumption.

44 44 Huawei Data Center Facility Solution Success Cases Prefabricated Data Center for Ethiopia Commercial Bank Because of limited cash flow, Ethiopia Commercial Bank (ECB) wanted a data center that supports phased deployment, has high reliability, and is Tier 3-compliant. Huawei provided the FusionModule1000 prefabricated data center solution to address the customer's requirements. Three modules were planned, among which two modules were deployed in the first phase. Compared with a traditional data center, this data center reduces the CAPEX by 35% and the OPEX by 30%. Smart Small Data Center for Orient Finance Holdings (Hong Kong) Limited Orient Finance Holdings (Hong Kong) Limited is a wholly owned subsidiary of Orient Securities Co., Ltd, and the only overseas business platform of Orient Securities. It provides domestic and overseas customers with cross-border integrated financial services. It requires the equipment room system to run safely and reliably. Besides, the project is located in the coastal area where the humidity is high, so the company hopes that the equipment room adopts a non-condensing design. Huawei provides FusionModule800 smart small data center solutions. The UPS and air conditioner are all redundant to ensure the reliability of the power supply and distribution and cooling systems.

45 Huawei Data Center Facility Solution Success Cases 45 Smart Mini Data Center for Industrial and Commercial Bank of China The Industrial and Commercial Bank of China (ICBC) is one of the Fortune 500 enterprises and has the largest customer base in China. It provides 5.32 million corporate customers and 496 million individual customers with a wide range of financial products and services. ICBC has a large number of branches worldwide, so it needs standardized data center solutions that are easy to copy and can be delivered quickly. Huawei provides FusionModule500 smart mini data center solutions. All components are integrated in a single cabinet and prefabricated in the factory. The solution can be delivered quickly onsite. Standardized solutions and unified purchase enable the solution to be copied to other branches. The construction standard of the entire network is unified in terms of purchase, delivery, and operation, so that they can be easily and efficiently completed. Modular Data Center for Agricultural Bank of China The Agricultural Bank of China, Lishui Branch was founded in 1998 and has outlets across every county and district of Lishui. Its savings deposits and increment, electronic banking, and other indicators rank top of the banks in Lishui. Lishui Branch aims to improve its customer service level, promote network transformation, and implement partition of outlet functions. The branch requires the power supply and distribution systems of the outlets to be efficient and reliable and be deployed in a short time. Huawei provides FusionModule2000 smart modular data center solutions, whose key components adopt redundant design and feature high reliability. The efficient UPS and in-row air conditioner lower the PUE and save the OPEX. Components are pre-installed and pre-commissioned in the factory, shortening the onsite installation time and enabling fast delivery.

46 46 Huawei Data Center Facility Solution Success Cases Modular Data Center for Qishang Bank Qishang Bank is a large city commercial bank in China, and has built a settlement network that covers major trade areas worldwide. The existing data center of the bank is almost fully loaded, and cannot meet the requirements of existing businesses and the growth of future businesses. Therefore, a new main production data center needs to be built. Huawei deploys 18 sets of FusionModule2000 smart modular data centers which contain 200 IT cabinets and a full set of data center management system. The data center management software centrally monitors devices in the branches and subbranches, improving asset utilization and O&M efficiency. The newly deployed data center has an average annual PUE lower than 1.6, saving as much as 27% electricity costs compared with the original data center. Modular Data Center for China Everbright Bank China Everbright Bank is a national joint-stock commercial bank. With the accelerated process of interest rate marketization, the arrival of the Internet+ era, and the rapid development of integrated operation, financial services, and electronic banking, the bank needs to realize standardized construction and centralized management of data centers in branches of different places so that resources can be shared. The branches of China Everbright Bank in Beijing, Anhui, Jinan, Shijiazhuang, Huanggang, Leshan, and Zigong use FusionModule2000 smart modular data center solutions. Standardized components and modular architecture of the solutions match businesses and enable fast on-demand deployment. The solutions support remote and local intelligent management and mobile O&M, which is simple and easy.

47 Huawei Data Center Facility Solution Success Cases 47 Smart Small Data Center for Bank of Guiyang Bank of Guiyang was established in Currently, it has nine branches in Guizhou province, one branch outside Guizhou, and outlets covering 88 counties in Guizhou. The service capability of the bank takes a leading position in the industry. In recent years, to support the rapidly growing new businesses and expanding service areas, the bank needs to build new outlets. The bank requires fast deployment, security, and reliability. The bank adopts FusionModule800 smart small data center solutions. Key components use redundant design, improving system reliability and ensuring stable business operation. Multiple devices are pre-integrated in one cabinet. Cabinets only need to be combined onsite, so the solution can be deployed in 4 hours, enabling fast service rollout. Smart Small Data Center for Yunnan Rural Credit Cooperatives Association Yunnan Rural Credit Cooperatives Association was established in 2005, which opened up a new era for the reform and development of Yunnan rural credit cooperatives. The equipment room of Funing County Rural Credit Cooperative has been used for many years. The equipment is old and needs to be modernized immediately. Huawei FusionModule800 smart small data center solution is used. The UPS, power distribution, monitoring, and air conditioner are highly integrated in one cabinet. Compared to the traditional construction mode, this solution saves footprints of one to two cabinets, reducing equipment room rent. At the same time, the solution supports remote monitoring of the equipment room and multiple smart O&M modes including SMS alarms, ensuring digital transformation of financial branches and outlets.

48 48 Huawei Data Center Facility Solution Success Cases Smart Small Data Center for China Pacific Insurance Co., Ltd. China Pacific Insurance Co., Ltd. was established in It is a leading listed comprehensive insurance company with A+H shares in China and has been one of Fortune 500 companies for seven consecutive years. With the implementation of the company's flattened network and the pilot projects and promotion of branch clouds, the equipment rooms of branches and outlets need to be quickly reconstructed to meet the needs of fast growing businesses in the Internet era. Huawei provides FusionModule800 smart small data center solutions which are highly integrated and deployed in a short time. The smart management system centrally monitors multiple outlets, improving O&M efficiency. Modular Data Center for Taikang Life Insurance Co., Ltd. Taikang Life Insurance is a large-scale insurance financial service group covering three core businesses: insurance, capital management, and medical care. Its outlets are all over the country. There are more than 4200 offline physical networks and online Internet platforms. To enhance customer satisfaction and mine big data to provide personalized services, Taikang Life Insurance built a new information data center in Canton East Tower. Huawei provides FusionModule2000 smart modular data center solutions, whose NetEco smart management system enables ipower to monitor the full link of the power supply system. Key devices and components can be controlled and managed. Serious accidents such as fire and power outage are prevented proactively to ensure uninterruptible power supply for the data center. The key technologies, including the efficient UPS, in-row air conditioner, and aisle containment make the data center green.

49 Huawei Data Center Facility Solution Success Cases 49 Smart Mini Data Center for Qian Hai Life Insurance Co., Ltd. Qian Hai Life Insurance Co., Ltd. is the first state-level innovative financial and insurance institution headquartered in Qianhai Shekou free trade zone. Currently, multiple outlets are facing information and intelligent transformation. The construction standard and O&M norms need to be unified for centralized management. Huawei provides FusionModule500 smart mini data center solutions. Multiple devices are integrated in one cabinet, reducing the footprint by at least 50%. The devices are pre-installed and pre-commissioned in the factory, which enables fast installation and rapid service rollout. In addition, the unified solutions facilitate centralized management and improve O&M efficiency. China Construction Bank China Construction Bank has numerous outlets throughout China, but the O&M capability is eagerly to be upgraded and with bias of standard in different branches, equipment rooms of all outlets must be standardized. To address these requirements, Huawei provides the FusionModule500 equipment room integration solution, which features efficient configuration and fast deployment. The smart monitoring system supports remote monitoring and management of multiple outlets in different areas so that these equipment rooms are controllable, visible, and manageable.

50 50 Huawei Data Center Facility Solution Success Cases Modular Data Center for China Construction Bank China Construction Bank is one of the five largest commercial banks in China. Since 2010, China Construction Bank has required that branches at all levels must reconstruct and upgrade their data centers to improve the banking service efficiency. By following idea of modular construction, Huawei provides the FusionModule2000 smart modular data center solution for reconstruction of level-2 branches to unify the construction standards, hardware standards, monitoring standards, O&M process, and centralized monitoring. Postal Savings Bank of China Postal Savings Bank of China (Xinjiang Branch) owns the financial service network that has the largest coverage in the entire Xinjiang Autonomous Region. It urgently needs to reconstruct and upgrade its equipment room into a safe, reliable, high-quality, and flexibly scalable data equipment room. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The solution can be flexibly deployed in complex environment, implement green operation and smart management of the data center, and reduce the O&M difficulties.

51 Huawei Data Center Facility Solution Success Cases 51 China Citic Bank China Citic Bank is one of the earliest joint-stock banks established in China. To catch up with the rapid business development, new branches of China Citic Bank must be quickly deployed and standardized. Huawei and China Citic Bank join hands to build the standard equipment room by adopting the FusionModule2000 smart modular data center solution. This equipment room can be duplicated in batches and quickly deployed. China Guangfa Bank China Guangfa Bank is one of the earliest joint-stock banks established in China. As the core supporting platform for each bank, the data center equipment room must ensure high availability and continuity of services. To address these requirements, Huawei provides the FusionModule2000 smart modular data center equipment room. The 2N architecture of the power distribution system and the efficient modular UPS effectively prevent single-point failures and improve the power supply reliability of the equipment room.

52 52 Huawei Data Center Facility Solution Success Cases Guilin Bank Guilin Bank is a well-known "agriculture, rural areas and farmers" financial service platform in China. To meet related specifications stipulated by the China Banking Regulatory Commission, Guilin Bank urgently needs to build a reliable data center within a short time. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution, and completed all equipment manufacturing, installation, and commissioning within eight weeks. The dual-bus power supply system that consists of modular UPS is used to ensure uninterrupted banking services. Shaanxi Rural Credit Cooperatives Union Shaanxi Rural Credit Cooperatives Union is the largest financial institution in Shaanxi province, and has over 3000 outlets in the entire Shaanxi province. The customer requires that these outlets must be standardized to facilitate management. Huawei provides the FusionModule500 integration solution to standardize devices and interfaces in equipment rooms of all outlets in the entire province. The cluster management system is used to implement rights, level, and domain based management of all outlets in the province, and unattended management of equipment rooms in all outlets.

53 Huawei Data Center Facility Solution Success Cases 53 Citic Trust China Citic Trust is a national financial institution that was established under the approval of the national financial supervision department. Its business develops quickly in recent years, and therefore Citic Trust requires that a new equipment room can be quickly delivered and ensure high availability. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. All core components are pre-installed, integrated, and tested in factories, and can be quickly deployed. The efficient modular UPS improves reliability of power distribution.

54 54 Huawei Data Center Facility Solution Success Cases ISP Industry Success Cases Prefabricated Data Center for Myanmar Golden Eleven Sun Network (Hong Kong) Ltd. Huawei Data Center Facility Solution Success Cases DANAWA Malaysia ONYX Group Guatemala Gateway Technology Development Co.Ltd Hong Kong DELWP Australia Cloud Data Center for Tianjin Zhenyun Technology and Development Co., Ltd. Modular Data Center for Shanghai Baosight Software Company Tencent China 21Vianet China Guofu Guangqi Shanghai Vipshop China CITIC Networks

55 Huawei Data Center Facility Solution Success Cases 55 Prefabricated Data Center for Myanmar Golden Eleven Golden Eleven is a registered investment company in Singapore, which attaches great importance to the Myanmar market and decides to focus on the field of data centers. The project is divided into four phases: The first phase contains 100 IT cabinets, and the following three phases contain 400 IT cabinets. The architecture is required to be flexible for subsequent elastic capacity expansion. Huawei provides the FusionModule1000B solution, which contains nine prefabricated modules. The construction level is Tier III, ensuring high reliability and availability. The one-stop cluster solution integrates Huawei's intelligent management system, simplifying remote O&M. Sun Network (Hong Kong) Ltd. Sun Network is a famous Internet infrastructure service provider in Hong Kong's ISP industry. Sun Network highlights fast deployment, high efficiency, small footprint, and reliability of the data center. Huawei provided the FushionModule2000 smart modular data center that is equipped with an efficient modular UPS that saves up to 50% space. The in-row air conditioner and aisle containment technology are adopted, improving cooling efficiency up to 30% and lowering the PUE and TCO.

56 56 Huawei Data Center Facility Solution Success Cases DANAWA Malaysia Danawa Resources Sdn Bhd (DANAWA) is a nationwide telecom service provider in Malaysia. As the net height at the site is 2.9 m, DANAWA required a data center that supports high power density and complies with the Tier 2 standard. Huawei provided an FusionModule2000 smart modular data center solution that is equipped with a cold aisle containment design and the NetEco intelligent management system. This one-stop solution not only meets the requirements of Tier- 2 standard design, but also features fast deployment, low investment in the initial infrastructure construction, and low TCO. ONYX Group Guatemala ONYX Group considers it s time-consuming to construct a traditional data center and expects that a new data center can be launched this year. Additionally, the public security situation in Guatemala is unstable. Huawei provided a FusionModule1000 prefabricated data center that integrates all functions and onsite installation service, ensuring rapid deployment and quick response to IT service requirements. The data center can be expanded on demand in the future to accommodate business growth.

57 Huawei Data Center Facility Solution Success Cases 57 Gateway Technology Development Co.Ltd Hong Kong Gateway Technology Development Co. Ltd is one of the largest data center service providers in Hong Kong. However, the existing data centers of the company were facing problems, such as the high PUE and increasing UPS monitoring and operating costs. Huawei provided a FushionModule2000 smart modular data center that supports low energy consumption and reliable power supply. The data center is equipped with the UPS5000-E that achieves efficiency up to 96% and multi-functional PDU. The solution also adopts the in-row air conditioner and aisle containment technology, improving the cooling efficiency and saving space. DELWP Australia Department of Environment, Land, Water and Planning (DELWP) in Australia required a new FushionModule2000 smart modular data center because most physical components in the existing data center were old and cannot be used soon. Huawei provided an end-to-end modular data center solution that integrates two traditional data centers into one virtualized cloud infrastructure with the high power density of 10 kw per rack.

58 58 Huawei Data Center Facility Solution Success Cases Cloud Data Center for Tianjin Zhenyun Technology and Development Co., Ltd. Tianjin Zhenyun Technology and Development Co., Ltd. is committed to providing customers with five-star exclusive cloud experience. The first phase of Tianjin Zhenyun data center contains 2,918 cabinets. The power density requires to be 4 kw/r and 10 kw/r. The data center must be delivered in four months. Huawei provides 94 sets of FusionModule5000 smart modular data center solutions which contain sixteen 500 kva, nine 1,500 kva, and five 120 kva modular UPS5000-E systems, 262 NetCol precision air conditioners, 192 precision power distribution cabinets, and the NetEco management system. The power supply and cooling are designed based on the Tier III+ standard. Huawei delivers the solutions with overall integration and helps the customer hold the onsite meeting, improving the customer's popularity and brand and contributing to the future business development. Modular Data Center for Shanghai Baosight Software Company Shanghai Baosight Software Company is a listed company under the Baosteel Group. This project is a data center that the Baosight Company and Shanghai Mobile build for Tencent based on the design specifications of Tencent's data center smart modules. 96 sets of smart modules are planned to be built in the data center. After construction, the data center will assume the operation of some core WeChat businesses of Tencent. Huawei provides FusionModule5000 smart modular data center solutions, and delivers 48 sets of solutions, which integrate the power distribution, cooling, cabinet, and management systems. The solutions are delivered in 45 days, ensuring fast service rollout.

59 Huawei Data Center Facility Solution Success Cases 59 Tencent China Tencent is one of the largest Internet service providers in China. In 2011, Tencent launched the WeChat, and the number of WeChat subscribers hit 0.6 billions within three years. This brings a huge pressure on the Tencent data center. Tencent is badly in need of a new data center that can be expanded easily and flexibly. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. All components are prefabricated in factories, configured as required, and assembled onsite to deploy the data center. The solution also meets flexible requirements arising from high-speed expansion of Internet. 21Vianet China 21Vianet is one of the world's most influential providers that provide the network space and infrastructure innovative services. To adapt to rapid changes of services, 21Vianet needs to deploy large-sized data centers in multiple areas, with a total floor area of 150,000 m 2. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The modular construction method helps make a clear breakthrough in reliability, flexibility, and environment protection. Compared with the traditional data center, the modular data center reduces the deployment time by 50%. In addition, innovative power supply system and cooling system are used to achieve a PUE equaling to or lower than 1.5 and improve the cooling efficiency by 40%.

60 60 Huawei Data Center Facility Solution Success Cases Vipshop China Vipshop has been dedicated to providing one-stop quality shopping experience for consumers. It needs to build a new data center to rapidly respond to customers' requirements. To address these requirements, Huawei provides the industry-leading FushionModule2000 smart modular data center solution. The modular equipment room is prefabricated in factories, and only needs to be assembled onsite before it is powered on. It takes only four weeks from site selection to deployment, reducing the construction period by 50% compared with the traditional equipment room. Guofu Guangqi Shanghai Shanghai Guofu Guangqi is mainly engaged in online education training solutions. It needs to establish a large-sized data center to provide powerful background data processing capability and a good scientific research environment for development of the online education platform. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. All components are standard components, adopt the modular design, and are prefabricated in factories. Huawei completed installation of 42 smart modular data center and 600 cabinets within two months. The solution implements fast deployment of the data center and meets the customer's requirement for fast service launching.

61 Huawei Data Center Facility Solution Success Cases 61 Modular Data Center for CITIC Networks CITIC Networks is authorized by the country to operate the basic telecom services, and is the only basic telecom service operator that owns and is qualified to run the private line services of the fixed network in addition to the three basic operators. In addition, CITIC Networks can lease or sold satellite repeats using the resources of the Asia Satellite Telecommunications Co. Ltd. Huawei works with CITIC Networks to build Grade A standard equipment room in Wuhan city using the FusionModule2000 smart modular data center solution. In this solution, the 2N redundancy configuration is used for core equipment of the power distribution system, and N+X redundancy configuration is used for core equipment of the cooling system.

62 62 Huawei Data Center Facility Solution Success Cases Media Industry Success Cases Modular Data Center for Jiangsu Broadcasting Corporation Prefabricated Data Center for Hubei TV Station Convergent Media (Yangtze River Cloud) Huawei Data Center Facility Solution Success Cases Prefabricated Data Center for Yunnan Communication Group People's Daily Phoenix New Media China Education Press Agency Shenzhen Times Network Media Shenzhen Media Group Hunan TV Program Henan Elephant Financial Media Group Gansu Press and Radio and Television Bureau Changxin Media Group

63 Huawei Data Center Facility Solution Success Cases 63 Modular Data Center for Jiangsu Broadcasting Corporation To meet the development requirements of the new media era, Jiangsu Broadcasting Corporation requires new data centers to adopt the latest IDC construction concept, save energy, support intelligent visual monitoring, and match a variety of businesses, such as servers, storage devices, and various types of media devices. Huawei provides the FusionModule2000 smart modular data center solution. The components of the smart module, neat and beautiful, are prefabricated in the factory. The deployment of the smart module and decoration of the data center are conducted at the same time, shortening service rollout time. The cold-aisle containment greatly reduces energy consumption of precision air conditioners, saving energy and reducing emission. The configured NetEco smart management system simplifies O&M and reduces O&M costs. Prefabricated Data Center for Hubei TV Station Convergent Media (Yangtze River Cloud) The Yangtze River cloud platform is a regional eco-level media convergence platform that is developed by using cloud computing and big data technologies. The core data center platform adopts the Huawei FusionModule1000B air-cooled prefabricated modular data center solution, which integrates the power supply and distribution system, cooling system, management system, fire extinguishing system, integrated cabling, and server cabinets. It features high security, reliability, density, and efficiency, rapid deployment, flexible capacity expansion, and intelligent management.

64 64 Huawei Data Center Facility Solution Success Cases Prefabricated Data Center for Yunnan Communication Group Cambodia Digital TV Co., Ltd. is a DTMB terrestrial digital TV integrated operating company that is jointly invested by Yunnan Wireless Digital TV Culture Media Co., Ltd. under Yunnan Communication Group, China and National Television of Kampuchea. Cambodia Digital TV Co., Ltd. is incorporated in Phnom Penh, the capital of Cambodia. Its new data center must support plug and play to ensure fast service rollout. Besides, the data center must support on-demand relocation to adapt to the harsh environment with high temperature and high humidity. Yunnan Wireless Digital TV Culture Media Co., Ltd. chooses Huawei FusionModule1000A prefabricated all-in-one data center solution. All systems of the data center are integrated in one prefabricated module, which is prefabricated and pre-commissioned in the factory. Onsite delivery is simple, shortening the deployment period by 80%. The prefabricated module features strong environment adaptability and ensures stable service operation. It is protected to IP55 and supports anti-seismic intensity 9. The solution is efficient and saves energy, with the PUE less than or equal to 1.5. O&M is efficient and easy, saving 30% OPEX. The prefabricated module design ensures that the data center can be relocated on demand. People's Daily People's Daily is the largest newspaper in China, and a most authoritative and influential media in China. People's Daily requires maximum utilization of the data center resource so that limited physical bearing space can be used to meet the huge demand of IT services. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The solution adopts the high-density integration design to minimize the footprint required for the data center. In addition, the data center can be deployed in several phases to meet the customer's service requirements.

65 Huawei Data Center Facility Solution Success Cases 65 Phoenix New Media Phoenix New Media is a globally leading cross-platform network. To ensure high-quality service deployment of the Phoenix network, Phoenix New Media needs to build a safe, stable, reliable, and efficient data center to supports business development. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The solution adopts the aisle containment design and underfloor flow mode to prevent mixing of the cold and hot air flows and improve the cooling efficiency. Compared with a traditional data center, the new Data Center for Phoenix New Media reduces power consumption by 20%. China Education Press Agency China Education Press Agency is a comprehensive education news agency that is directly under the Ministry of Education. The new data center is deployed in the office building. The customer requires that construction can minimize the impact of normal operation of its employees, and more IT equipment can be deployed in the limited space. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The single-row module deployment mode is used to maximize the space utilization. The in-row water-cooled air conditioner is adopted to implement near-end cooling, save energy, and support a high power density of 5 7 kw per cabinet. The solution implements fast deployment of the data center and meets the customer's requirement for fast service launching.

66 66 Huawei Data Center Facility Solution Success Cases Shenzhen Times Network Media Shenzhen Times Network Media is a new media company of the Shenzhen Media Group. The high power consumption of the existing equipment room increases the operation costs. Therefore, Shenzhen Times Network Media is highly concerned about energy conservation and power consumption reduction of the new data center. Huawei provides the FushionModule2000 smart modular data center solution that is highlighted by the efficient UPS and aisle containment technology. The solution can reduce the PUE to a value lower than 1.5, which greatly reduces the operation costs and power consumption costs. In addition, the solution reduces the footprint by 30% and significantly improves the space utilization of the equipment room. Shenzhen Media Group Shenzhen Media Group Convergence News Center is a full media center of the Shenzhen Media Group that converges three networks, and is the largest information system project of the Group in 14 years. Therefore, Shenzhen Media Group is planning to build a green and smart data center. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The efficient and modular UPS is used to provide reliable power supply to the data center; the aisle containment technology isolates the cold air flow from the hot air flow, optimizes the flow organization, reduces the power consumption of air conditioners, and saves energy.

67 Huawei Data Center Facility Solution Success Cases 67 Hunan TV Program Hunan TV is the most famous provincial TV station in China, with an audience of over one billion. The Data Center for the new program production center must meet the requirements of high density and short construction period. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. All components are prefabricated in factories, and only need to be installed onsite. Huawei delivers the data center within two weeks. The near-end cooling system and efficient UPS meet the customer's high-density deployment requirement, and the power density of the equipment room reaches 7 kw per cabinet. Henan Elephant Financial Media Group Gansu Press and Radio and Television Bureau is an organization directly under the Gansu Provincial Government, and assumes important functions of local press and publication. It requires that a data center can be deployed in the limited space of its office building. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The solution minimizes the footprint of auxiliary systems, improves the space utilization of the equipment room, and provides a power density of 7 kw per cabinet, ensuring efficient operation of the customer's office network.

68 68 Huawei Data Center Facility Solution Success Cases Modular Data Center for Gansu Press and Radio and Television Bureau Gansu Press and Radio and Television Bureau is an organization directly under the Gansu Provincial Government, and assumes important functions of local press and publication. It requires that a data center can be deployed in the limited space of its office building. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The solution minimizes the footprint of auxiliary systems, improves the space utilization of the equipment room, and provides a power density of 7 kw per cabinet, ensuring efficient operation of the customer's office network. Changxin Media Group Changxin Media Group is a local media organization established by the Changxin Town. To catch up with business development, Changxin Media Group requires that the data center must be green, energy efficient, and easy to operate and maintain, and can adapt to diversified services. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The data center adopts the cold aisle containment design, near-end cooling, and efficient UPS to significantly improve the energy efficiency. Compared with the traditional data center, the new data center reduces the power consumption by about 30%.

69 Huawei Data Center Facility Solution Success Cases 69

70 70 Huawei Data Center Facility Solution Success Cases Dusse Germany Sinar Mas Group Indonesia Large Enterprises Success Cases Huawei Data Center Facility Solution Success Cases Shaw Organization Singapore Anabatic Technologies Philippines SDEC Saudi Arabia HGISC Saudi Arabia Benfica Portugal Nikulin Circus Moscow, Russia Modular Data Center for Shanghai Semiconductor Manufacturing International Corporation Modular Data Center for STATS ChipPAC Modular Data Center for Haiqi Group Zoomlion Heavy Industry Shenhua Beijing Guohua Electric Power JMCG China Shanghai Automotive China Merchants Group Tongwei Group Shanghai Huayi Group Changan PSA Automobiles Luoyang Institute of Refractories Research (LIRR) Chenzhou Tobacco Monopoly Bureau

71 Huawei Data Center Facility Solution Success Cases 71 Modular Data Center for Dusse Germany Dusse planned to build a data center with 16 IT racks, a power density of 5 kw per rack, and the covering area of around 100 square meters. Fast deployment and ondemand expansion were also required. Huawei provided Dusse with a FushionModule2000 smart modular data center solution that is equipped with the modular UPS, in-row air conditioner, and intelligent management system. The data center features modular design and supports fast and flexible deployment, which maximizes the space utilization. The real-time monitoring provides excellent maintenance experience. Modular Data Center for Sinar Mas Group in Indonesia Sinar Mas Group in Indonesia was in urgent need of a data center both for internal use and leasing to high-end users such as banks and large enterprises. The data center was required to support quick delivery, flexible expansion, and high security. Huawei provided the FusionModule2000 smart FushionModule2000 smart modular data center solution. The prefabrication dramatically reduces the onsite installation time, ensuring quick launch of services. The power system uses the modular UPS that can be expanded smoothly. Every module has independent access control and the data center status can be monitored remotely by using the intelligent management system, which allows maintenance personnel to learn the data center status at any time and ensures the operation security.

72 72 Huawei Data Center Facility Solution Success Cases Modular Data Center for Shaw Organization in Singapore Shaw Organization in Singapore is a subsidiary of Shaw Brothers (HK) Ltd. The area for the new data center was only 24 square meters. Fast deployment and power density up to 6.2 kw per rack were required. Huawei provided a single-row FushionModule2000 smart modular data center solution that is equipped with the integrated and customized PDU as well as the precision air conditioner. The solution boasts fast deployment, energy saving, and easy maintenance. Modular Data Center for Anabatic Technologies in Philippines Anabatic Technologies required phased and fast deployment so that the data center can go online this year. The data center was required to support smooth expansion, and be easy to manage and monitor, reducing the OPEX. Huawei provided a FushionModule2000 smart modular data center solution, which allows for phased and fast deployment on demand. The data center adopts the modular design and is configured with an easy-to-use intelligent management system. The PUE is equal to or less than 1.6, reducing the OPEX by 30% in comparison with a traditional data center.

73 Huawei Data Center Facility Solution Success Cases 73 All-in-One Prefabricated Data Center for SDEC in Saudi Arabia Saudi Diesel Equipment Company (SDEC) is the largest diesel generator manufacturer in Saudi Arabia. As the business is progressing, there is insufficient room to install the new IT equipment in the data center equipment room. SDEC therefore was in urgent need of a data center that supports fast deployment, high availability, flexible expansion, high temperature resistance, and mobility. Huawei provided the 20-foot FushionModule1000A All-in-One prefabricated modular data center solution that is equipped with an efficient UPS and in-row cooling system, which are applicable to the harsh environment with temperature ranging from 33 C to +55 C. The mobile data center can be fast deployed on demand and flexibly expanded. Modular Data Center for HGISC in Saudi Arabia Hassan Ghazi Ibrahim Shaker Company (HGISC) is a powerful air conditioner distributor in Saudi Arabia. The boost in business stimulates the need for more IT infrastructure. HGISC required a solution that supports high power density, unified management and monitoring, as well as fast deployment. Huawei provided a FushionModule2000 smart modular data center solution that supports high power density, modular design, and standard interface. The prefabrication simplified the installation and shortened installing time by 40% in comparison with the traditional data center. The NetEco intelligent management platform delivered with the data center fulfills the requirements of unified management and monitoring.

74 74 Huawei Data Center Facility Solution Success Cases Modular Data Center for Benfica in Portugal The Portuguese sports club Benfica planned to deploy a new data center for its stadium. Benfica required that the data center support fast deployment and easy expansion, and the existing warehouse space be utilized to the maximum, achieving low TCO. Huawei provided a FushionModule2000 smart modular data center solution with cold aisle containment that attains a low PUE and high efficiency and saves TCO. The modular design enables fast deployment and easy expansion. Modular Data Center for Nikulin Circus in Moscow, Russia Nikulin Circus is one of the oldest circuses worldwide. It planned to build a data center for its business expansion, and required the data center to be deployed rapidly and maintained easily, and to attain a low PUE. Huawei provided a FushionModule2000 smart modular data center solution that is equipped with the modular UPS, in-row air conditioner, and intelligent management system. The data center uses the modular design and therefore supports fast deployment, flexible expansion, and easy maintenance.

75 Huawei Data Center Facility Solution Success Cases 75 Modular Data Center for Shanghai Semiconductor Manufacturing International Corporation Semiconductor Manufacturing International Corporation (SMIC) is one of the leading semiconductor foundries in the world and the largest and most advanced foundry in mainland China. The high-performance computing (HPC) equipment room of SMIC mainly supports core businesses such as chip simulation algorithm. The equipment room is required to be highly reliable, have high power density per cabinet, and ensure fast service rollout. Huawei provides the FusionModule2000 smart modular data center solution, which provides local cooling and aisle containment to meet the high density requirements of the HPC equipment room. The solution integrates all subsystems, including the cabinet, power supply and distribution, cooling, cabling, and management subsystems. It can be deployed on demand in five days to match services. Modular Data Center for STATS ChipPAC STATS ChipPAC is a leading provider of advanced semiconductor packaging and test services to global customers. The equipment room of this project supports core businesses such as R&D and simulation as well as intelligent factory information businesses. Huawei provides the FusionModule2000 smart modular data center solution, which integrates all subsystems, including the UPS, cabinet, power supply and distribution, cooling, cabling, and management subsystems. The integrated design makes the data center neat and beautiful. The solution can be delivered in seven days. The NetEco management system is compatible with the upper-layer network management system, enabling L1 and L2 to be managed on the same platform.

76 76 Huawei Data Center Facility Solution Success Cases Modular Data Center for Haiqi Group Haiqi Group is one of China's top 100 transport enterprises and an enterprise with level-one national road passenger transport business qualification. The Group's operating business scale is enlarged, so it needs to build a new data center to support businesses. Huawei provides the FusionModule2000 smart modular data center solution, in which the integrated UPS cabinet integrates the UPS and power distribution, saving 50% footprint. The power distribution adopts N+1 redundancy architecture. The efficiency can reach as high as 96% at a low load rate. The configured NetEco management system centrally monitors the power and environment parameters and raises warnings before a failure occurs. O&M is quick and simple. Modular Data Center for Zoomlion Heavy Industry Zoomlion Heavy Industry is the leading large construction machinery equipment supplier in China. It needs to build two redundancy data centers in its headquarters in Changsha to meet the service expansion requirements. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The in-row air conditioner, UPS, NetEco dynamic environment monitoring system, and PDU8000 integrated power distribution cabinet are deployed in the equipment room. The efficient UPS, in-row air conditioner, and aisle containment effectively reduce the PUE.

77 Huawei Data Center Facility Solution Success Cases 77 Modular Data Center for Shenhua Beijing Guohua Electric Power Since 2014, Guohua Electric Power has started to promote the "smart Guohua" information system reconstruction project in the entire Group. The first pilot project is located in Beijing Gauantun, and is an active data center newly built by Guohua Electric Power. Huawei adopts the FusionModule2000 smart modular data center solution. The air cooled in-row air conditioner, UPS5000, and NetEco smart monitoring software are used to improve the efficiency, and reduce the power consumption and operation costs of the equipment room. All-in-One JMCG Prefabricated Data Center Jiangling Motors Co., Group (JMCG) is a key backbone enterprise in the Chinese automobile industry and a vehicle export base of China. Its existing office building does not reserve any space for an equipment room. Therefore, JMCG needs to quickly build an outdoor data enter. To address these requirements, Huawei provides the FusionModule1000A Prefabricated All-in-One Data Center solution, which is the only solution in the industry that has obtained the Tier3 certification. It takes only one and a half months from order placing to completion of deployment

78 78 Huawei Data Center Facility Solution Success Cases Modular Data Center for Shanghai Automotive Shanghai Automotive Industry Corporation is undergoing strategic transformation, and wants to build the China's largest one-stop automobile online service platform, chengxiang.com. It needs to build a data center to support construction of the network. To enable the customer to launch major services in half a year, Huawei provides the FusionModule2000 smart modular data center solution. The existing idle plant is upgraded and reconstructed into the data center. The data center is quickly deployed according to the customer's requirements, ensuring that the customer's services can be quickly launched on the network. Modular Data Center for China Merchants Group The FushionModule2000 smart modular data center jointly built by Huawei and China Merchants Group has become the model data center for state-owned enterprises in South China. According to the third-party test result, the data center meets the design requirements in regard to project quality, product quality, system performance, and indicators. In particular, the Heating, Ventilating and Air Conditioning (HVAC) system takes the lead in the industry.

79 Huawei Data Center Facility Solution Success Cases 79 Modular Data Center for Tongwei Group To provide services to the headquarters and subsidiaries, Tongwei Group needs to ensure continued services and reduce the IT operation costs. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The cooling system supplies the air flow under the floor to effectively manage the air flow and improve the cooling capacity. Compared with the traditional data center, the PUE of the new data center decreases by about 25%. Modular Data Center for Shanghai Huayi Group Shanghai Huayi Group is a large-size chemistry enterprise funded under the authorization of the Shanghai State-owned Assets Supervision & Administration Commission. The Group needs to build a new data center to meet the IT service requirements of the group and its subsidiaries. The Data Center for the Group adopts the Huawei FushionModule2000 smart modular data center solution. Services are divided based on the modular design to ensure sustainable development of the data center and meet the IT service requirements of the group and its subsidiaries.

80 80 Huawei Data Center Facility Solution Success Cases Modular Data Center for Changan PSA Automobiles Changan PSA Automobiles Co., Ltd. (CAPSA) was founded in November 2011, with the registered capital of RMB4 billions and a total investment of RMB8.5 billions. A production base and R&D base were newly built in Guanlan, Shenzhen. This data center is an important part of the CAPSA's information system. It takes only eight weeks from site selection to project delivery to ensure that services can be quickly launched. The modular UPS is adopted so that the power system can adapt to actual requirements, and the capacity can dynamically increase with business development. Data Center for Luoyang Institute of Refractories Research (LIRR) LIRR is the only large-sized comprehensive research institute of China in the refractories field. It plans to build an advanced modular equipment room to adapt to the business development. In this project, the old library needs to be converted into an equipment room. Considering the adaptability of the data center, Huawei provides the FusionModule2000 smart modular data center solution. Deployment of the data center was completed within one week.

81 Huawei Data Center Facility Solution Success Cases 81 Modular Data Center for Chenzhou Tobacco Monopoly Bureau The Marketing Center, Logistics Center, and Information Center are set up in Chenzhou Tobacco Monopoly Bureau, and require a new data center to perform modern information management on tobacco data. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The NetEco management system is configured to provide efficient and high-quality services, which greatly improves the customer satisfaction.

82 82 Huawei Data Center Facility Solution Success Cases Modular Data Center for Bisha University in Saudi Arabia Education Industry Success Cases Huawei Data Center Facility Solution Success Cases Data Center for King Mongkut's Institute of Technology Ladkrabang (KMITL) in Thailand Mackenzie Presbyterian University Brazil Adigrat University Ethiopia Kazan Federal University Russia Modular Data Center for Sun Yat-sen University Smart Small Data Center for Nanjing University of Posts and Telecommunications Smart Small Data Center for Wuhan University Modular Data Center for Guangxi University Smart Mini Data Center for Education Bureau of Minhang District, Shanghai Smart Mini Data Center for Education Metropolitan Area Network of Pudong New Area, Shanghai Jinan University Central South University Chengdu University Inner Mongolia Radio & TV University Taiyuan University of Technology Institute of Disaster Prevention Qingdao Education Bureau Guangdong Audio-Visual Education Museum

83 Huawei Data Center Facility Solution Success Cases 83 Modular Data Center for Bisha University in Saudi Arabia Established in 1998, Bisha University is one of the best universities in Saudi Arabia. To accelerate office informatization, a new data center needs to be built, while fast goingonline as well as visual monitoring and management is required. Huawei provides the FusionModule2000 smart modular data center solution. The solution is prefabricated in the factory and adopts fully modular design, so it can be fast deployed onsite, shortening deployment time and enabling fast service rollout. The configured NetEco smart management system realizes remote visual monitoring and management. Besides, a tablet is configured locally to realize easy and visual local management, facilitating maintenance. Data Center for King Mongkut's Institute of Technology Ladkrabang (KMITL) in Thailand KMITL, ranking No. 1 in terms of engineering technology in Thailand, has provided multiple government ministries with ICT consulting services over the years. KMITL hopes to develop its network and build a smart campus, which requires to reconstruct the original core equipment room and more than 400 network rooms. Two sets of FusionModule1000 prefabricated modular data center solutions and 400 sets of FusionModule500 smart mini data center solutions are used. The solution is simplified. Both the prefabricated data center and integrated cabinet are pre-integrated, meeting the customer requirements of fast service rollout with no existing equipment rooms available. The service rollout time is reduced by 80%. Besides, Huawei's smart network management system is configured to realize centralized management and unattended operation of the equipment rooms in the campus and improve O&M efficiency.

84 84 Huawei Data Center Facility Solution Success Cases Prefabricated Data Center for Mackenzie Presbyterian University in Brazil Mackenzie Presbyterian University has a history of over 100 years. The university needed an outdoor data center to meet its development requirements. The new data center must be well-protected against dust, water, and earthquake. Huawei provided the FusionModule1000 prefabricated data center solution. The containers are quakeproof to above Mercalli intensity 9, have a protection level of IP55 against dust and water, and require no extra building, reducing the CAPEX by 40%. The PUE is 1.55, which significantly lowers the OPEX. Modular Data Center for Adigrat University The teaching buildings of Adigrat University in Ethiopia are located in remote areas, which poses great difficulty in procurement and construction. Therefore, the customer required maximum use of existing devices to reduce construction costs. Huawei provided the FusionModule2000 smart modular data center solution. Modular installation greatly increases the deployment speed and shortens the service rollout period. The onsite installation took only two weeks. Huawei also provided complete plan design and worked with the local engineering team to complete the end-to-end solution. The primary power source uses the mains and existing diesel generator which back up each other, reducing investment and increasing power supply reliability.

85 Huawei Data Center Facility Solution Success Cases 85 Modular Data Center for Kazan Federal University in Russia Kazan Federal University is the second oldest university in Russia. The university needed to deploy a new data center to meet its research requirements. Huawei provided the FushionModule2000 smart modular data center solution. The solution adopts the modular UPS which has efficiency up to 96% efficiency and saves the space by 50%. The intelligent management system increases availability and reduces O&M costs. The in-row air conditioner and aisle containment technology improve the cooling efficiency. Modular Data Center for Sun Yat-sen University Sun Yat-sen University is a national key university co-founded by the Ministry of Education and Guangdong Province. The original equipment rooms of the university are not flexible enough and cannot realize online capacity expansion, so they cannot meet the requirements of information construction in the future. Besides, the equipment rooms in different university campuses need to be monitored and managed centrally. Huawei provides the FusionModule2000 smart modular data center solution, which adopts in-row cooling and the integrated UPS, allows for online capacity expansion, and meets business growth requirements. The relevant management system supports centralized management of multiple university districts, reducing the OPEX. This project provides an effective reference for the construction of modular data centers in colleges and universities in the future.

86 86 Huawei Data Center Facility Solution Success Cases Smart Small Data Center for Nanjing University of Posts and Telecommunications Nanjing University of Posts and Telecommunications is a key university directly under the Ministry of Industry and Information Technology (former Ministry of Posts and Telecommunications). To construct a smart campus, the university needs to reconstruct the existing equipment room. Since service rollout is urgent, the equipment room needs to be built quickly. The university adopts the Huawei FusionModule800 smart small data center solution. The UPS, air conditioner, and monitoring module are integrated in one cabinet. The solution is pre-installed and per-commissioned in the factory, so it takes only four days to install the solution onsite and roll out services. Smart Small Data Center for Wuhan University Wuhan University is a key comprehensive university directly under China's Ministry of Education. With the trend of smart campus construction, the School of Journalism and Communication, Wuhan University reconstructs its equipment room. Since a semester is about to begin, the equipment room must be quickly deployed. The school adopts the Huawei FusionModule800 smart small data center solution. The UPS, air conditioner, and monitoring module are integrated in one cabinet. The solution is pre-installed and per-commissioned in the factory, so it takes only three days to install the solution onsite and roll out services.

87 Huawei Data Center Facility Solution Success Cases 87 Modular Data Center for Guangxi University The holographic modular data center of China-ASEAN Research Institute of Guangxi University mainly supports the China-ASEAN holographic comprehensive data platform. This platform is based on holographic information construction and uses the information service system as a link to support China-ASEAN researches. During the first phase, Huawei deploys the FusionModule2000 smart modular data center for the customer. The integrated UPS of the data center adopts N+1 redundancy mode, effectively avoiding single point of failure and improving system reliability. The built-in ECC800 network management system monitors the comprehensive running status of the data center in real time. Smart Mini Data Center for Education Bureau of Minhang District, Shanghai To realize education informatization of more than 100 primary and secondary schools in Minhang District, Shanghai, the district invests in educational resources for these schools and rebuilds network equipment and school network rooms. In the FusionModule500 smart mini data center solution, the power distribution, UPS, monitoring, and batteries for power backup are all integrated in one cabinet, saving space for the equipment room of a school. The network management software monitors all sites remotely and centrally, reducing O&M costs and building efficient equipment rooms for the campus.

88 88 Huawei Data Center Facility Solution Success Cases Smart Mini Data Center for Education Metropolitan Area Network of Pudong New Area, Shanghai To promote the education information construction, Pudong New Area, Shanghai invests more than RMB 200 million in building campus networks that integrate urban and rural compulsory education for primary and secondary schools. The project involves reconstruction of infrastructure of network equipment rooms in more than 300 primary and secondary schools in Pudong New Area. More than 300 sets of Huawei FusionModule500 smart mini data center solutions are used. One cabinet is one mini data center. The UPS, power distribution, monitoring, battery pack, temperature and humidity sensor, water sensor, and other components are integrated in one cabinet. The high integration design reduces the footprint, solving the problem of insufficient space in the existing equipment rooms. Besides, open northbound interfaces are reserved so that the equipment rooms of the schools can connect to the smart network management system and then be centrally managed. Modular Data Center for Jinan University Jinan University was the first university in China to recruit foreign students, and is currently the Chinese university with the largest number of international students. As an important part of information system construction, the equipment room of the Jinan University data center was built under the cooperation of related parties. Huawei provides the FusionModule2000. The modular data center adopts the standard design. All components of the data center are prefabricated in factories, can be quickly deployed and easily duplicated, and are green and energy efficient. The NetEco smart management system implements visible O&M of the data center.

89 Huawei Data Center Facility Solution Success Cases 89 Modular Data Center for Central South University Central South University is a key national university directly under the administration of the Ministry of Education. The new equipment room is located in the Information and Network Center of the new campus, and the total area is 340 m 2. The Information and Network Center of Central South University undertakes the tasks of building, operating, maintaining, and managing the education network. Huawei provides the FusionModule2000 smart modular data center solution. Two smart modular data center are deployed, and two modular UPs are configured. The Huawei smart management system is used to implement unattended data center. This not only improves reliability, but also reduces the O&M costs. Modular Data Center for Chengdu University Chengdu University is a university run by the Chengdu Municipal Government. Its digital campus network carries multiple services, and requires the HA data center infrastructure. In addition, the layout of the equipment room must good. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. The double-row and aisle containment design and standard cabinets are adopted to facilitate proper layout of the equipment room. The efficient dual-bus power supply, which consists of modular UPS, ensures safety and reliability of the equipment room, and uninterrupted services.

90 90 Huawei Data Center Facility Solution Success Cases Modular Data Center for Inner Mongolia Radio & TV University Inner Mongolia Radio & TV University is a university that was approved and founded by the Inner Mongolia Autonomous Region in 1979 according to Deng Xiaoping's instruction for founding national radio & TV universities. The university undertakes multiple digital campus services, and urgently needs to build a data center to meet its rapidly increasing service requirements. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The data center can be deployed in a common office building without the raised floor. All components of the data center are prefabricated in factories. Huawei has completed onsite deployment of the data center within one week, which minimizes the impact on normal teaching process of the university. Modular Data Center for Taiyuan University of Technology Polytechnic Institute Taiyuan University of Technology is an independent institute jointly founded by Taiyuan University of Technology and China Coal Museum (China's only national coal museum). The existing data center has problems of high power consumption and is difficult to maintain. Therefore, Polytechnic Institute Taiyuan University of Technology needs to build a green and energy efficient data center. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The aisle containment design and near-end cooling of in-row air conditions are used to accurately match the cooling capacity requirement and improve the energy efficiency. This reduces the electricity costs for Taiyuan University of Technology by about 20%.

91 Huawei Data Center Facility Solution Success Cases 91 Modular Data Center for Institute of Disaster Prevention Institute of Disaster Prevention is affiliated to China Earthquake Administration (CEA). Its supercomputing center asks for a high density design, and must be deployed in the teaching building where the floor height is limited. The Institute requires the supplier to shorten the onsite construction time to reduce the impact on teaching. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The in-row air condition is adopted to meet the requirement for deployment in a building with limited floor height. All components use the standard interfaces. Huawei has completed onsite deployment of the data center within one week, which minimizes the impact on normal teaching process of the university. Modular Data Center for Qingdao Education Bureau Qingdao Education Bureau is the benchmark of general education in Shandong province or even in the entire China. It runs the Qingdao education backbone network. The new data center imposes high requirements on the technology advancement, layout, and reliability. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The appearance of the modular data center is uniform, simple, and elegant. The data center can serve as the show room for customers in the education industry, shaping a good image for Qingdao Education Bureau.

92 92 Huawei Data Center Facility Solution Success Cases Guangdong Audio-Visual Education Museum Guangdong Audio-Visual Education Museum is responsible for planning, R&D, and promotion of audio-visual education in the entire Guangdong province. To adapt to the education development, the Museum is badly in need of a data center that features high availability, high reliability, and high scalability. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The N+1 redundancy design is adopted for both the power supply and cooling systems. The NetEco smart management system generates alarms in real time, and can be interconnected with the IT system of the Museum. The equipment room of the data center has been highly recognized and appraised by education departments of the Guangdong province.

93 Huawei Data Center Facility Solution Success Cases 93

94 94 Huawei Data Center Facility Solution Success Cases Healthcare Industry Success Cases Togo e-health Yamama Hospital Saudi Arabia Modular Data Center for Chinese PLA General Hospital (301 Hospital) Modular Data Center for Children's Hospital of Fudan University Huawei Data Center Facility Solution Success Cases Modular Data Center for Renmin Hospital of Wuhan University Modular Data Center for Shanghai Municipal Hospital of Traditional Chinese Medicine Smart Small Data Center for Chengdu Ai'er Eye Hospital Smart Small Data Center for People's Hospital of Huzhu County, Qinghai Province First Affiliated Hospital of Zhengzhou University Xinjiang Autonomous Region People's Hospital Nanjing Drum Tower Hospital Shenzhen TCM Hospital Sanmenxia Central Hospital Beijing Chaoyang District Health Bureau Health Department of Tibet Autonomous Region

95 Huawei Data Center Facility Solution Success Cases 95 Togo e-health The Togo government wanted a green and energy saving data center to go online quickly during the e-health service development. However, an equipment room was unavailable for the deploying the new data center. Huawei provided the FusionModule1000 prefabricated data center solution that integrates all subsystems. The data center was prefabricated in the factory and requires no equipment room for civil work. The deployment took only 12 weeks. The solution adopts the cold aisle containment and in-row technology for closely coupled cooling. The data center achieves a PUE lower than 1.5, effectively reducing power loss. Yamama Hospital Saudi Arabi The data center project of Yamama Hospital in Saudi Arabia is a pilot project for informatization in the healthcare sector. The data center needed to store and process the running and historical data. The original equipment room had limited space and a low data capacity, and the outdated design cannot meet the requirements for future capacity expansion. Huawei provided the FusionModule2000 smart modular data center solution. A single module integrates systems including the cabinet, cooling, UPS, and monitoring. The solution was deployed within two weeks. The solution adopts the modular design, facilitating capacity expansion, and driving the informatization of the healthcare sector in Saudi Arabia.

96 96 Huawei Data Center Facility Solution Success Cases Modular Data Center for Chinese PLA General Hospital (301 Hospital) Established in 1953, Chinese PLA General Hospital (301 Hospital) is a large modern comprehensive hospital which covers medical treatment, health care, teaching, and scientific research. The hospital ranks among the best in terms of overall strength in the medical industry in China. With the development of the information society, the informatization level of the hospital is getting higher and higher. The hospital is a leader of informatization in the industry, so the data center carrying its business system becomes more and more important. One of the key challenges facing the hospital during its informatization construction process is to build a highly reliable data center that saves footprints and is easy to operate and maintain. Huawei provides the FusionModule2000 smart modular data center solution that adopts modular architecture, integrated power supply and distribution, centralized management, and smart cooling with linkage between cooling and power supply. The solution saves footprints, eliminates local hotspots, features fast delivery, and overshadows the traditional equipment room construction mode. Modular Data Center for Children's Hospital of Fudan University Children's Hospital of Fudan University is an excellent pediatric specialist hospital based in Shanghai and serving the whole country. The hospital has HIS, LIS, PACS, electronic medical record, HSB, and other systems. It requires the equipment room to quickly upgrade and go online. During construction, the informatization application system cannot be interrupted. The FusionModule2000 smart modular data center solution provided by Huawei is an integrated solution that requires short deployment time and does not interrupt the operation of businesses. The configured NetEco smart management system is easy to use, reducing labor input and costs in managing equipment rooms.

97 Huawei Data Center Facility Solution Success Cases 97 Modular Data Center for Renmin Hospital of Wuhan University Renmin Hospital of Wuhan University is one of the first batch of grade III, class A hospitals rated by the Ministry of Health. With the informatization development of the hospital, the original equipment room cannot meet the business requirements. Besides, the space in the hospital is limited. Therefore, a new-generation data center with high density, high availability, and low energy consumption is required. Huawei provides the FusionModule2000 smart modular data center solution which uses cold-aisle containment and in-row air conditioners, improving the efficiency of the equipment room and reducing the OPEX. The solution is highly spoken of by the hospital's leadership. Modular Data Center for Shanghai Municipal Hospital of Traditional Chinese Medicine Established in 1954, Shanghai Municipal Hospital of Traditional Chinese Medicine is one of the best grade III, class A hospitals of traditional Chinese medicine in Shanghai. With the development of informatization construction of the hospital, the original equipment room cannot meet business and development requirements. The FusionModule2000 smart modular data center solution is used. The design of cold-aisle containment is beautiful and energy-saving. The NetEco6000 smart management operation interface is visual and easy to use, improving O&M efficiency. The smart monitoring platform simplifies O&M and reduces O&M costs.

98 98 Huawei Data Center Facility Solution Success Cases Smart Small Data Center for Chengdu Ai'er Eye Hospital Chengdu Ai'er Eye Hospital is committed to building a provincial capital-level benchmark eye hospital in the southwest. The equipment room of the hospital adopts the Huawei FusionModule800 smart small data center solution. The UPS, air conditioner, and monitoring module are integrated in one cabinet. The solution is pre-installed and percommissioned in the factory, so it takes only three days to install the solution onsite and roll out services. The UPS and air conditioner adopt 1+1 redundant architecture, supply reliable, stable, and uninterruptible power to network devices and servers, and ensure uninterruptible online businesses of the hospital. Smart Small Data Center for People's Hospital of Huzhu County, Qinghai Province People's Hospital of Huzhu County, Qinghai Province is the first pilot project during the reform of national public hospitals. The existing equipment room cannot bear the equipment required for the reform of public hospitals. It is a big challenge facing the hospital to build, operate, and maintain the equipment room and ensure business operation. Huawei provides the FusionModule800 smart small data center solution, which adopts the all-in-one design. The cooling, power, and control are pre-integrated in one cabinet, enabling fast deployment. It takes only four hours to build the data center. Besides, a mobile phone app, SMS alarms, and remote monitoring over the WebUI are supported, realizing unattended operation of the data center.

99 Huawei Data Center Facility Solution Success Cases 99 First Affiliated Hospital of Zhengzhou University The First Affiliated Hospital of Zhengzhou University is the largest Class 3 Grade A hospital in China. The Hospital needs to build a telemedical center for teleconsultation and training within the province. The new equipment room must have a power density of 10 kw per cabinet, be energy efficient, and can be quickly delivered. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution that adopts the integrated UPS for power distribution, in-row air conditioner, and aisle containment technology. Huawei has delivered this project within one week, meeting the customer's requirements for high-density deployment, green and energy efficient data center, and fast delivery. Xinjiang Autonomous Region People's Hospital Xinjiang Autonomous Region People's Hospital is a large scale general hospital of Grade Three Class A. With rapid business development, the existing equipment room of the Hospital urgently needs to be expanded. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The air cooled in-row air conditioner and aisle containment are used to reduce the power consumption. In addition, the raised floor is not needed, and the original floor in the office can be utilized to maintain the clean and neat environment of the equipment room.

100 100 Huawei Data Center Facility Solution Success Cases Modular Data Center for Nanjing Drum Tower Hospital Nanjing Drum Tower Hospital is a large scale general hospital of Class 3 Grade A. To cope with rapid business development, the Hospital urgently needs to build a disaster recovery data center. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The solution adopts the industry-leading in-row air conditioner to meet the cooling requirements of high-density deployment, adapt to the future development trend of the data center, and significantly reduce the power consumption of air conditioners. The modular UPS is configured to support flexible capacity expansion as the business further develops. Shenzhen TCM Hospital Shenzhen TCM Hospital is a large scale general hospital of Class 3 Grade A, and its information system has become the benchmark of the industry. The Hospital plans to convert a room with an area of 50 m 2 and a floor height of 2.6 meters into a data center. To address these requirements, Huawei provides the FusionModule2000 single-row modular data center solution that perfectly matches the room type and floor height. The configured NetEco smart system supports visual management of the capacity and energy efficiency, reduces the O&M skill requirements, and resolves the customer's problem of weak O&M professional strength.

101 Huawei Data Center Facility Solution Success Cases 101 Sanmenxia Central Hospital Sanmenxia Central Hospital is a general hospital of Class 3 Grade A in Sanmenxia city. The Hospital needs to build a telemedical center for teleconsultation and training within the province. In addition, the telemedical center must meet the provincial telemedical node requirements. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. All components are standard components and adopt the modular design. These components are prefabricated and tested in factories, and assembled onsite to implement fast deployment of the data center. Beijing Chaoyang District Health Bureau Beijing Chaoyang District Health Bureau requires that its own data center can be quickly deployed, and edge-cutting equipment room technologies can be adopted to reliably support stable and reliable operation of its services, such as medical treatment and disease control. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The industry-leading water-cooled in-row air conditioner and aisle containment technology are used to adapt to the high-density development trend of the data center in the future and achieve a low PUE. Module components are prefabricated in factories while the equipment room is being decorated, which greatly shortens the service launching time.

102 102 Huawei Data Center Facility Solution Success Cases Health Department of Tibet Autonomous Region To improve the hardware conditions of the grassroots medical and health institutions in Tibet Autonomous Region according to the provincial health platform requirements, Health Department of Tibet Autonomous Region needs to build a data center. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The project was planned at a time and deployed in several phases. The capacity of the data center can be expanded as required to meet the future service requirements. The NetEco smart management system is configured to facilitate operations and save the manpower input and costs of the equipment room.

103 Huawei Data Center Facility Solution Success Cases 103

104 104 Huawei Data Center Facility Solution Success Cases Transportation Industry Success Cases Prefabricated Data Center for Dubai International Airport Papua New Guinea Airport Mexico City Airport Huawei Data Center Facility Solution Success Cases Colombian FCM's Smart Transportation System Modular Data Center for Guangzhou Metro Modular Data Center for Rizhao Port Group Modular Data Center for Yunnan Highway Bureau Modular Data Center for Shentong Bombardier CRSC China Huangshan High Speed Railway Passenger Depot Line 8 Beijing Subway China First Highway Engineering Co., Ltd. Inner Mongolia Department of Communications Tianjin Expressway Group CSSC

105 Huawei Data Center Facility Solution Success Cases 105 Prefabricated Data Center for Dubai International Airport The original equipment room resources in the T1 and T3 terminals of Dubai International Airport are insufficient, and there are no suitable buildings for constructing a new data center. The new data center must go online quickly, adopt the design of high power density and advanced technologies, support smooth business upgrade in the future, and meet the Tier III design and construction certification requirements. Huawei provides the FusionModule1000B prefabricated modular data center solution which does not need traditional buildings. The solution contains 27 prefabricated modular data centers and covers an area of 3,600 square meters. The data centers are delivered in nine months, saving at least a year and a half compared with traditional data centers in buildings. The data centers meet the Uptime Tier III design and construction certification requirements, adopt prefabricated modules, support stacking of three layers within limited space, and support smooth capacity expansion of businesses. The aisle containment, variablefrequency in-row air conditioner technology, and modular UPS realize high power density. The NetEco management system is deployed to perform centralized management, facilitating O&M. Papua New Guinea Airport New Guinea Airlines Co., Ltd is a national airlines company in Papua New Guinea. To meet its service development requirements, the company needed to build a new data center. The customer hoped the new data center would be scalable, easy to deploy and low TCO. Huawei provided the FusionModule1000 prefabricated data center solution. The data center is prefabricated and therefore easy to deploy and transport. Efficient UPS and the advanced in-row cooling solution are used, which help achieve a PUE lower than 1.6. The data center reduces TCO by 30% compared with a traditional data center.

106 106 Huawei Data Center Facility Solution Success Cases Mexico City Airport To meet its service development requirements, Mexico City Airport (AICM) needed to build a new data center within a short time. Huawei provided the FusionModule2000 smart modular data center solution. Modular installation greatly increases the deployment speed and shortens the time to market. The onsite installation took only two weeks. Huawei also provided complete plan design and worked with the local engineering team to complete the end-toend solution. The primary power source uses the mains and existing diesel generator which back up each other, reducing investment and increasing power supply reliability. Prefabricated Data Center for Colombian FCM's Smart Transportation System Colombian Federation of Municipalities (FCM) is responsible for the national smart transportation project. The project aims to implement traffic control based on the video surveillance and data platform analysis to optimize resource usage and alleviate traffic congestion and frequent accidents. A new data center needed to be deployed within a short time. The data center must be secure, reliable, fast to market, and scalable. Huawei provided the FusionModule1000 prefabricated data center solution. The data center is prefabricated and therefore easy to deploy and transport. The modular design allows the data center to be expanded on demand. In addition, the data center features high efficiency and reliability. The data center meets the customer's requirements for going online quickly and smooth capacity expansion.

107 Huawei Data Center Facility Solution Success Cases 107 Modular Data Center for Guangzhou Metro Guangzhou Metro has a total of 10 operating lines with a total length of kilometers and a total of 167 stations. Its operating mileage ranks third in China and top ten in the world. Its operating service reliability ranks first in the world. To improve the operation efficiency and passenger satisfaction, Guangzhou Metro has built a cloud data center and big data platform, optimized internal resources, and customized personalized services, striving to become the benchmark in the industry. The cloud data center of Guangzhou Metro uses the Huawei FusionModule2000 smart modular data center solution which realizes phased service deployment and reduces initial investment. The technologies such as the efficient modular UPS, in-row cooling, and aisle containment make the average annual PUE of the modular data center as low as The smart network management system greatly increases the internal O&M efficiency of the enterprise. Modular Data Center for Rizhao Port Group Rizhao Port Group is a large modern enterprise group with four business segments: port business, logistics and trade, building and manufacturing, and integrated services. Its total asset reaches more than RMB 32 billion. The newly established financial company limited mainly focuses on financial businesses. The informatization construction needs to be implemented by referring to the construction standards of commercial banks, while the equipment room should be constructed based on the quasi-a level. To meet customer requirements, Huawei provides the FusionModule2000 smart modular data center solution whose components all adopt modular redundant design, improving data center reliability and reducing fault correction time. The smart network management system monitors the running status of the data center in real time, and provides suggestions and tips about device capacity expansion, technology upgrade, and device update. The inrow air conditioner still dehumidifies and ensures a constant temperature at a load rate of 10%, preventing IT equipment from condensing.

108 108 Huawei Data Center Facility Solution Success Cases Modular Data Center for Yunnan Highway Bureau Yunnan Highway Bureau is responsible for industry management, including planning, construction, maintenance, and road administration of the province's national highway, provincial highway, and some important roads. To efficiently manage internal resources, the bureau has built a comprehensive asset management information system to manage internal assets centrally. The Huawei FusionModule2000 smart modular data center helps the comprehensive asset management information system go online quickly, and enables on-demand capacity expansion as well as flexible expansion with businesses. The smart network management system realizes convenient O&M locally and remotely, and accesses the upper-layer monitoring system easily. Modular Data Center for Shentong Bombardier Shentong Bombardier is a joint venture co-founded by Shanghai Shentong Metro Group Co., Ltd. and Bombardier Transportation Sweden Co., Ltd. The company will focus on the market of maintaining and repairing China's urban rail transit vehicles, and its data center consists of the main equipment room and disaster recovery equipment room. The main equipment room uses the Huawei FusionModule2000 smart modular data center solution, and the disaster recovery equipment room uses the Huawei integrated FusionModule800 smart small data center solution. Both solutions highly integrate the UPS, power distribution, monitoring, and air conditioning in one module, saving footprints of one to two cabinets compared with the traditional construction mode, and greatly reducing the floor area of the equipment room. In addition, standard components, modular architecture, and prefabrication in the factory enable fast ondemand service deployment.

109 Huawei Data Center Facility Solution Success Cases 109 China Railway Signal & Communication Corp China Railway Signal & Communication Corp (CRSC) is a leading enterprise in the railway transportation industry, and the largest integrator and equipment supplier in the railway signal & communication fields. With rapid development of business, CRSC needs to build an advanced data center to implement centralized management of different departments. To meet these requirements, Huawei provided the FushionModule2000 smart modular data center solution. The data center can be easily assembled onsite and quickly deployed. The cold aisle containment technology isolates the hot air flow from the cold air flow, improving the cooling efficiency. Data modules are divided based on independent management of IT equipment and data of each department. Huangshan High Speed Railway Passenger Station The Huangshan High Speed Railway Passenger Station project is one of the 2014 Top 10 projects approved by the Huangshan Municipal Committee and Municipal Government. The customer required that the equipment must be built according to the Tier III requirements and must be neat, nice aprearance, green, and energy efficient. To meet these requirements, Huawei provided the FushionModule2000 smart modular data center solution. All components are prefabricated in factories, assembled onsite, and quickly deployed. The efficient UPS, cold aisle containment, and in-row air conditioners are adopted to implement near-end cooling and isolation of the hot air flow from the cold air flow. This improved the cooling efficiency and realizes energy conservation and environment protection.

110 110 Huawei Data Center Facility Solution Success Cases Line 8 Beijing Subway The OCC of Line 8 Beijing Subway is the central hub of railway operation, and plays an important role in line operation and driving safety. The customer requires that the data center can be quickly deployed and support smart management. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. All components are prefabricated and tested in factories, and can be quickly deployed onsite. The capacity of the data center can be conveniently expanded. The NetEco smart management system is configured to support real-time monitoring and early warning and implement attendance-free management. China First Highway Engineering Co., Ltd. China First Highway Engineering Co., Ltd. has 39 departments. With rapid business expansion, the customer requires an advanced data center to support its business development and allow the headquarters to manage each independent department in a centralized manner. Huawei provides the FushionModule2000 smart modular data center solution. Data modules are divided based on requirements of each department, which facilitates independent management of IT equipment and data of each department. The advanced smart management system not only reduces the O&M manpower input, but also support more accurate detection and location of faults, effectively ensuring stable O&M of the equipment room.

111 Huawei Data Center Facility Solution Success Cases 111 Inner Mongolia Department of Communications Inner Mongolia Department of Communications controls the traffic and transportation of the entire region. As the traffic constantly increases, the amount of service data in the local area is soaring. Therefore, Inner Mongolia Department of Communications urgently needs to build a highly efficient and reliable data center. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. All components are prefabricated in factories, assembled onsite, and quickly deployed. The efficient UPS and cold aisle containment technology are adopted to isolate the hot air flow from the cold air flow, which improves the cooling efficiency. The NetEco smart management system can accurately locate faults, effectively improving the O&M efficiency. Tianjin Expressway Group As a large state-own enterprise, Tianjin Expressway Group is authorized to invest, build, and operate the expressways in Tianjin. It requires that the new data center must be built within a short period of time, support convenient capacity expansion, and be energy efficient. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. Huawei has completed installation and commissioning of the equipment room within one week. The low PUE of the new equipment room significantly reduces the electricity costs, and standard interfaces are reserved to implement smooth capacity expansion.

112 112 Huawei Data Center Facility Solution Success Cases CSSC Haifeng Navigation Technology Haifeng Navigation Technology Co., Ltd. is a technology company engaged in R&D of the aviation security system integration. Since 2010, the company has attempted to apply the aviation security technologies in the navigation field. To ensure business development in the navigation field, the company plans to build a navigation cloud service center. To address these requirements, Huawei provides the FushionModule2000 smart modular data center solution. All components are prefabricated in factories, and can be quickly installed onsite. The cold aisle containment technology prevents mixing of the cold air flow and the hot air flow, and eliminates regional hot spots. This increases the energy efficiency by 30% and saves a lot of operation costs for Haifeng Navigation.

113 Huawei Data Center Facility Solution Success Cases 113

114 114 Huawei Data Center Facility Solution Success Cases Modular Data Center for Ethiopian Electric Utility Energy Industry Success Cases Huawei Data Center Facility Solution Success Cases Modular Data Center for Halfaya Oil Field in Iraq Smart Small Data Center for Turkey OEPSAS EUAS Turkey Saudi Electricity Company (SEC) Pemex Mexico Russian Grids Petrobras Brazil Russian Grid (FSK) Modular Data Center for State Grid Information and Telecommunication Group Co., Ltd. Modular Data Center for Qinghai Electric Power Company in Haihu New District Modular Data Center for Yalong River Hydropower Development Company, Ltd. Modular Data Center for Global Energy Interconnection Research Institute Prefabricated Data Center for Chongqing Jiangbei Electric Power Company Modular Data Center for State Grid Pingxiang Electric Power Company Modular Data Center for China Power Engineering Consulting Group Co., Ltd. Hunan Electric Power Corporation Research Institute Headquarters of China Datang Corporation Huaneng Taiyuan Dongshan Power Plant Huabei Oilfield Jiujiang Petrochemical China National Coal Group

115 Huawei Data Center Facility Solution Success Cases 115 Modular Data Center for Ethiopian Electric Utility As its business continues to grow in recent years, Ethiopian Electric Utility needs to build a new data center to support the core business of the enterprise resource planning system. The data center needs to go online quickly and be reliable and energysaving. Huawei provides the FusionModule2000 smart modular data center solution whose power supply and distribution system uses 2N architecture, improving system reliability. The components as well as the entire system adopt modular design, and are prefabricated in the factory. The solution can be rapidly deployed onsite, shortening the construction time and meeting the customer's requirements of going online quickly. Besides, the aisle containment and in-row air conditioner cooling technologies reduce the operating PUE and save energy. Modular Data Center for Halfaya Oil Field in Iraq To meet the business needs of the Halfaya oil field, China National Petroleum Corporation planned to build a new data center that can go online quickly and is energy-saving to save operating expenses. Huawei provides the FusionModule2000 smart modular data center solution. Both the modular UPSs and air conditioners are configured in N+1 mode, and a smart management system is deployed. All components are prefabricated in the factory and adopt modular design, realizing fast onsite deployment and reducing the deployment time by at least 50% compared with the original plan. The aisle containment and in-row cooling technologies reduce the operating PUE greatly and save energy.

116 116 Huawei Data Center Facility Solution Success Cases Smart Small Data Center for Turkey OEPSAS There are more than 81 power stations in Turkey. OEPSAS needs to build an information exchange center quickly to manage these power stations. Since the online business grows rapidly, it is required that the data centers of the power stations be delivered quickly and all power stations be monitored and managed centrally. Huawei provides the FusionModule800 smart small data center solution which is prefabricated in the factory, saving onsite engineering and enabling one-stop fast delivery within 4 hours. The data center of each power station can be remotely monitored and managed over the WebUI. The dispatching center centrally monitors and manages the power stations, simplifying O&M and reducing O&M management costs. EUAS Turkey EUAS Turkey needed to build a data center that supports 48 kw load. However, it did not have a building for deploying the data center. Therefore, EUAS considered an outdoor solution. Huawei provided the integrated FusionModule1000 prefabricated data center solution. All components including power supply, cooling, cabling, cabinet, and fire extinguishing devices are integrated into a standard container. The data center supports IT load up to 60 kw.

117 Huawei Data Center Facility Solution Success Cases 117 Saudi Electricity Company (SEC) As the largest public utility company in the Gulf region, Saudi Electricity Company (SEC) planned to deploy a new data center to meet the continuously increasing electricity requirements in the Gulf region. SEC required that cutting-edge deployment concepts to be implemented to build a green and energy-saving data center. Huawei provided SEC with the FusionModule2000 smart modular data center solution. The solution adopts the aisle containment design to isolate hot air from cold air. The in-row air conditioner achieves closely coupled cooling for IT equipment, improving the overall cooling efficiency. The NetEco delivered with the data center manages all infrastructure in the data center in a centralized manner, monitors the data center status in real time, and promptly sends fault alarms to O&M personnel. The NetEco simplifies O&M and reduces labor cost. PEMEX Mexico PEMEX is a Mexico's state-owned oil company. Its original data center cannot meet the development requirements of its core services. The new data center needed to be compatible with the original one and support rapid expansion, easy management, and high reliability. Huawei provided the FusionModule1000 prefabricated data center solution which adopts the Tier 3 design and is compatible with the original data center. The data center was deployed within one week. The modular design makes capacity expansion easy. The NetEco management system delivered with the data center simplifies management and O&M.

118 118 Huawei Data Center Facility Solution Success Cases Russian Grids Russian Grids is the largest power company in Russia. It planned to deploy a data center to meet the increasing data processing requirements in the middle area of Russia. Huawei provided the FusionModule1000 prefabricated data center solution which uses prefabricated cabinets, high quality precision air conditioners, and modular UPS. The NetEco management system is used for monitoring device status and environment. The solution achieved a PUE lower than 1.5, which reduces the OPEX. Petrobras Brazil Petrobras is a super large corporation owned by the Brazilian government. As the informatization of field exploration is increasing continuously, Petrobras was in urgent need to deploy a highly reliable data center to meet its field exploration requirements. Petrobras required the new data center to be deployed within four months. Huawei provided the FushionModule1000A All-in-One prefabricated modular data center solution. This solution integrates all components including the power distribution cabinet, IT cabinet, UPS, and in-row air conditioner. All these components are pre-integrated and preinstalled in the factory. After delivered to the site, the components were quickly deployed and put into use, meeting the customer's requirements for fast time to market.

119 Huawei Data Center Facility Solution Success Cases 119 Russian Grid (FSK) Russian Grid is the largest energy power company in Russia, and the fourth-largest power systems company in the world. To accommodate the booming expansion of FSK services, FSK start to reform the central office data center of FSK Moscow, hope can deploy it fast, integrate it flexibly to existing power distribution system and fire system. Huawei provided FusionModule1000C prefabricated modular data center solution to realize fast deployment, including pre-installed cabinets, excellent precision cooling, modular UPS5000E, they together made the superior power usage efficiency and supported integration to local system flexibly. The whole system can work normally in -40 environment. Modular Data Center for State Grid Information and Telecommunication Group Co., Ltd. State Grid Information and Telecommunication Group Co., Ltd. is a wholly-owned subsidiary of State Grid Corporation of China, and the largest provider of information and communications technology, products, and services in China's energy industry. The customer hopes to develop IDC business by using its advantages of electricity and electricity communications resources. Huawei provides the FusionModule2000 smart modular data center solution, which adopts the advanced modular UPS and in-row air conditioner in the industry. One-time planning, phased deployment, and on-demand capacity expansion build a solid reliable support platform of infrastructure for State Grid Information and Telecommunication Group Co., Ltd.

120 120 Huawei Data Center Facility Solution Success Cases Modular Data Center for Qinghai Electric Power Company in Haihu New District Qinghai Electric Power Company has built a new provincial data center to provide highquality, safe, and reliable power supply services and meet the business needs. Huawei provides the FusionModule2000 smart modular data center solution which adopts the cold-aisle containment and local in-row cooling technologies, reducing the power consumption of the equipment room. The configured NetEco smart management system is easy to operate, saving O&M manpower and meeting the urgent needs of efficient and reliable operation of the equipment room of Qinghai Electric Power Company. Modular Data Center for Yalong River Hydropower Development Company, Ltd. Founded in 1989, Yalong River Hydropower Development Company, Ltd. is an independent state-owned large-scale power generation enterprise. Its main business is hydropower. It is planned to develop a 22-level power station in the Yalong River mainstream. Among the 13 major hydropower bases planned in China, the installed capacity of Yalong River's power station ranks third. To adapt to the development of future businesses, the new data center needs to be deployed in phases and equipped with a smart management system to reduce the O&M costs. Huawei provides the FusionModule2000 smart modular data center solution which is deployed in two phases, saving upfront investment. The NetEco management system remotely monitors the data center in real time, simplifying O&M, reducing the number of O&M personnel, and reducing expenses.

121 Huawei Data Center Facility Solution Success Cases 121 Modular Data Center for Global Energy Interconnection Research Institute The State Grid Global Energy Interconnection Research Institute hopes to quickly build a data center infrastructure platform that can provide solid and reliable support for scientific researches. The data center should be green and energy-saving, and the power supply system should be reliable. Huawei provides the FusionModule2000 smart modular data center solution, which integrates the cabinet, power supply and distribution, cooling, and other subsystems. The solution can be deployed flexibly and quickly. The cold-aisle containment and local cooling solution make the annual PUE lower than 1.6. The deployed NetEco smart management system performs smart monitoring and enables mobile O&M, simplifying O&M. Prefabricated Data Center for Chongqing Jiangbei Electric Power Company The construction project of main and backup dispatching centers of the smart grid dispatching control system of State Grid Chongqing Jiangbei Electric Power Company was the most important project of Jiangbei Electric Power Company in The company required that advanced technologies and products be used in the project to set up a benchmark and template in the entire state grid system. After in-depth communication, Huawei provided the FusionModule1000 prefabricated modular data center solution to match customer requirements. The solution adopts the all-inone design, realizes engineering productization and simple design, breaks the delivery condition limit of the building, and adapts to various outdoor harsh environments. The product was tested at multiple levels and pre-commissioned in the factory, quickening the construction and simplifying project management.

122 122 Huawei Data Center Facility Solution Success Cases Modular Data Center for State Grid Pingxiang Electric Power Company State Grid Pingxiang Electric Power Company needs to supply power to 1.88 million population for industrial and agricultural production and living use in the five counties (districts) under the jurisdiction of Pingxiang, so the company needs a new modular data center to ensure the continuous safe stable operation of the power grid. The FusionModule2000 smart modular data center solution provided by Huawei adopts an integrated solution, safe reliable 2N power supply architecture, and complete stable intelligent monitoring system. It can be deployed quickly and flexibly, saves the floor area of the equipment room, and matches the construction needs of Pingxiang Electric Power Company. Modular Data Center for China Power Engineering Consulting Group Co., Ltd. Established in 2002, China Power Engineering Consulting Group Co., Ltd. is the "vanguard" and "national team" in China's electric power engineering services industry and takes a leading position in the field of electric power survey and design in China. To support business development, the company builds a new data center at its headquarters. It requires fast deployment and intelligent O&M. The Huawei FusionModule2000 smart modular data center solution is used. Standard modular components shorten the delivery time and enable fast service rollout. The Huawei NetEco smart management system is used to perform real-time monitoring, raise warnings for faults, and simplify O&M.

123 Huawei Data Center Facility Solution Success Cases 123 Hunan Electric Power Corporation Research Institute Hunan Electric Power Corporation Research Institute is a technical and R&D center of Hunan Electric Power Corporation. With rapid business development, Hunan Electric Power Corporation Research Institute urgently needs to build a green and smart data center. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. It takes only two weeks from construction to deployment of the data center. The NetEco management system is configured to reduce manual intervention; the cold aisle containment technology and in-row air conditioner are used to achieve an annual PUE lower than 1.6. Headquarters of China Datang Corporation China Datang Corporation is a state-owned enterprise directly managed by the central government. In recent years, with rapid business development, China Datang Corporation plans to build an energy efficient data center. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The cold aisle containment technology and in-row air conditioner are adopted to significantly improve the efficiency, and reduce the power consumption and operation costs of the equipment room.

124 124 Huawei Data Center Facility Solution Success Cases Modular Data Center for Ethiopian Electric Utility As its business continues to grow in recent years, Ethiopian Electric Utility needs to build a new data center to support the core business of the enterprise resource planning system. The data center needs to go online quickly and be reliable and energysaving. Huawei provides the FusionModule2000 smart modular data center solution whose power supply and distribution system uses 2N architecture, improving system reliability. The components as well as the entire system adopt modular design, and are prefabricated in the factory. The solution can be rapidly deployed onsite, shortening the construction time and meeting the customer's requirements of going online quickly. Besides, the aisle containment and in-row air conditioner cooling technologies reduce the operating PUE and save energy. Huabei Oilfield Huabei Oilfield is one of the PetroChina oilfields that have the most advanced information system. The customer requires that a more advanced equipment room be built to greatly reduces the subsequent O&M costs. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The 25 kw and 35 kw NetCol5000-A air cooled in-row precision air conditioners are configured. Compared with the traditional equipment room, the modular equipment room reduces the PUE from 2.2 to 1.6.

125 Huawei Data Center Facility Solution Success Cases 125 Jiujiang Petrochemical As the model of the first smart factory in China, Jiujiang Petrochemical wishes to build the first-class information system to realize automatic, digital, model-based, visualized, and integrated production operation. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The solution integrates the efficient UPS, cold aisle containment, and in-row air conditioner to meet the customer's informatization requirements in the next ten years. China National Coal Group In the Yulin energy chemical plant project of the China National Coal Group, the existing equipment room is reconstructed and optimized. The problems of high power consumption, high equipment temperature, and cleanness of the equipment room must be resolved. To address these requirements, Huawei provides the FusionModule2000 smart modular data center solution. The cold aisle containment and in-row air conditioner are adopted to greatly reduce the power consumption of the equipment room. Isolation of cable troughs from scalable cable racks makes cabling more reasonable and tidy.

126 126 Huawei Data Center Facility Solution Success Cases Huawei Data Center Facility Solution Success Cases

127 Huawei Data Center Facility Solution Success Cases 127

128 Copyright Huawei Technologies Co., Ltd All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademark Notice, HUAWEI, and are trademarks or registered trademarks of Huawei Technologies Co., Ltd. Other trademarks, product, service and company names mentioned are the property of their respective owners. General Disclaimer The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice. HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen , P.R. China Tel:

Huangcun IDC of China Unicom Beijing: China's First Warehouse Micro-modular IDC

Huangcun IDC of China Unicom Beijing: China's First Warehouse Micro-modular IDC Huangcun IDC of China Unicom Beijing: China's First Warehouse Micro-modular IDC China Unicom Beijing (hereinafter referred to as Beijing Unicom below) has reconstructed its two unused warehouses in Huangcun,

More information

Huawei Smart Cooling Solution

Huawei Smart Cooling Solution Huawei Energy Powering the Future Huawei Smart Cooling Solution HUAWEI TECHNOLOGIES CO., LTD. To meet increasing demands of data centers such as IT business integration, virtualization and cloud computing,

More information

China Railway Signal & Communication Corporation Limited Results Presentation

China Railway Signal & Communication Corporation Limited Results Presentation China Railway Signal & Communication Corporation Limited 2015 Results Presentation April 2016 1. Overview of 2015 Fruitful Achievements and Continued Strengthening of Industry Leadership Fruitful Achievements

More information

BUSINESS OVERVIEW. Customer Services and Market Expansion

BUSINESS OVERVIEW. Customer Services and Market Expansion 24 China Communications Services Corporation Limited / Annual Report 2012 The Group is a leading service provider in the PRC that provides integrated support services in the informatization sector including

More information

Modular Data Center Solution. Reliable Power Solutions

Modular Data Center Solution. Reliable Power Solutions Modular Data Center Solution Reliable Power Solutions Contents Company Introduction---------------------1 Modular Data Center Solution------------2 Wise-S Modular Data Center----------------8 Wise-M Modular

More information

The Main Issues and the Game Changing Concepts of Chinese Economy

The Main Issues and the Game Changing Concepts of Chinese Economy The Main Issues and the Game Changing Concepts of Chinese Economy Syed Hasanat Associate Professor Jilin University 1 Connectivity and integration Belt and Road Initiatives Unimpeded trade Facilitate connectivity

More information

Better Governance, Better Livelihood & Better Industry. New ICT, Creating a Smart City Nervous System

Better Governance, Better Livelihood & Better Industry. New ICT, Creating a Smart City Nervous System Better Governance, Better Livelihood & Better Industry New ICT, Creating a Smart City Nervous System Huawei at a glance 13.8 Silicon Valley Toronto Ottawa 92.5 Netherlands Germany Hungary Romania 9.2 11.0

More information

To enrich life through communication

To enrich life through communication To enrich life through communication Huawei CDMA Global Footprint Based on 10-year experiences in CDMA industry, Huawei now is regarded as the "Big Three" in the CDMA2000 1X/1xEV-DO market. As a leader

More information

SUCCESS STORY. HUAWEI UPS Solution Success Story HUAWEI TECHNOLOGIES CO.,LTD

SUCCESS STORY. HUAWEI UPS Solution Success Story HUAWEI TECHNOLOGIES CO.,LTD SUCCESS STORY HUAWEI UPS Solution Success Story HUAWEI TECHNOLOGIES CO.,LTD UL conducted an independent evaluation on behalf of: Administration Building, Headquarters of Huawei Technologies Co., Ltd.,

More information

Smarter Nations on the way. Joe so Huawei CTO of Industry Solutions

Smarter Nations on the way. Joe so Huawei CTO of Industry Solutions Smarter Nations on the way Joe so Huawei CTO of Industry Solutions 1 Huawei Overview 2 Huawei Smart City Infrastructure 3 References 4 Ecosystem Lead to Win-Win Cooperation Huawei: A Global Leader of ICT

More information

Smart City Is Accelerating. Huawei Smart City Global Successful Case

Smart City Is Accelerating. Huawei Smart City Global Successful Case Smart City Is Accelerating Huawei Smart City Global Successful Case Severe Challenges Facing Fast-Growing Cities C158 C139 C138 City governance 2 People's livelihood Industry development Disaster response

More information

LG CNS Global Cloud Data Center

LG CNS Global Cloud Data Center LG CNS Global Cloud Data Center Are your digital assets vital to your business growth? Then, let LG CNS manage it for you Solution For further information, please contact: datacenter@lgcns.com www.lgcns.com/en

More information

Enterprise Network Successful Cases Connect Your Business in A Better Way

Enterprise Network Successful Cases Connect Your Business in A Better Way Enterprise Network Successful Cases Connect Your Business in A Better Way Contents 1 Government & Public Sector Large Enterprise Financial Services Industry Energy & Power Transportation WAN Project for

More information

2011 Results Announcement China Railway Construction Corporation Limited

2011 Results Announcement China Railway Construction Corporation Limited Results Announcement China Railway Construction Corporation Limited I. Overview Global Influence Further Strengthened Twice in a Row Cited as World s Largest Contractor In, CRCC s Position Continued to

More information

The following table sets out major indicators of our business development in 2001, 2002 and 2003.

The following table sets out major indicators of our business development in 2001, 2002 and 2003. The following table sets out major indicators of our business development in 2001, 2002 and 2003. Change 2003 over 2001 2002 2003 2002 Local wireline access lines in service (in thousands) 80,834 96,788

More information

WAN Power Supply Solutions HUAWEI TECHNOLOGIES CO., LTD. Issue 1.0. Date

WAN Power Supply Solutions HUAWEI TECHNOLOGIES CO., LTD. Issue 1.0. Date WAN Power Supply Solutions Issue 1.0 Date 2013-08-01 HUAWEI TECHNOLOGIES CO., LTD. 2013. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without

More information

China Unicom Global MPLS-VPN. China Coverage. Core

China Unicom Global MPLS-VPN. China Coverage. Core China Coverage China Unicom Global service is deployed on CUnet - a carrier Level IP over DWDM backbone IP network of capacity at 40Gbps+ CUnet is build with self-healing capability to ensure the greatest

More information

Trademark Notice. General Disclaimer.

Trademark Notice. General Disclaimer. Copyright Huawei Technologies Co., Ltd. 2017. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies

More information

SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER

SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER Enabling Tomorrow s CRITICAL EDGE INFRASTRUCTURE We helped some of the largest names in the industry bring new capacity online

More information

HUAWEI TECHNOLOGIES CO., LTD. Huawei IDS2000-S Small Modular Data Center Solution

HUAWEI TECHNOLOGIES CO., LTD. Huawei IDS2000-S Small Modular Data Center Solution HUAWEI TECHNOLOGIES CO., LTD. Huawei IDS2000-S Small Modular Data Center Solution Group Data Center Concept: big center, small branch With the development and maturity of the IT automation age, rapid development

More information

PROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES

PROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES PROCESS & DATA CENTER COOLING How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES CONGRATULATIONS 2 BOLD PREDICTION 3 Where We Are TODAY Computer Technology NOW advances more

More information

How Liquid Cooling Helped Two University Data Centers Achieve Cooling Efficiency Goals. Michael Gagnon Coolcentric October

How Liquid Cooling Helped Two University Data Centers Achieve Cooling Efficiency Goals. Michael Gagnon Coolcentric October How Liquid Cooling Helped Two University Data Centers Achieve Cooling Efficiency Goals Michael Gagnon Coolcentric October 13 2011 Data Center Trends Energy consumption in the Data Center (DC) 2006-61 billion

More information

Infrastructure management service

Infrastructure management service Infrastructure management service Paolo Gemma www.huawei.com HUAWEI TECHNOLOGIES CO., LTD. SUMMARY MANAGED SERVICE PROPOSAL ENERGY PROPOSAL MONITORING PROPOSAL HISILICON HUAWEI TECHNOLOGIES SEMICONDUCTOR

More information

Agenda Business Overview Operating Results Financial Results

Agenda Business Overview Operating Results Financial Results 1 Agenda 2001 Business Overview 2001 Operating Results 2001 Financial Results 2 2001 Business Overview Satisfactory Operating Performance New Businesses Taking-off Increasingly Efficient Operations Promising

More information

Mobile Video Insight Report 2013 H2

Mobile Video Insight Report 2013 H2 Mobile Video Insight Report 2013 H2 Mobile Video Insight Report 2013 H2 1 Introduction...1 1.1 Key Findings...1 1.2 Summary and prospect...1 2 User Attribute...2 2.1 Usage of Network Types...2 2.1.1 75%

More information

China Nine Provinces and Cities Telephone Network Expansion Project (1) (2) (3)

China Nine Provinces and Cities Telephone Network Expansion Project (1) (2) (3) China Nine Provinces and Cities Telephone Network Expansion Project (1) (2) (3) 1. Project Profile and Japan's ODA Loan Report Date: October 2002 Field Survey: July 2001 Kazakhstan Kyrgyzstan Russian Federation

More information

Huawei AntiDDoS Cases

Huawei AntiDDoS Cases Huawei AntiDDoS Cases Our Customers Telecom Beijing Telecom Beijing Unicom Shanghai Unicom Shandong Mobile Hubei Mobile Guangdong Telecom Guangdong Unicom Du TerkTelecom 1 ISP Tencent Alibaba People.com

More information

Huawei Railway Communication Service Solution Guide

Huawei Railway Communication Service Solution Guide Huawei Railway Communication Service Solution Guide Huawei Technologies Co., Ltd. Keywords Railway transport, service solution, subsystem, design,, solution implementation Abstract Huawei Railway Communication

More information

Verizon Conferencing Global Access Information

Verizon Conferencing Global Access Information Verizon Conferencing Global Access Information Global Access allows audio conferencing participants the ability to join calls from around the globe using local and freephone dial-in numbers. Dialing Information

More information

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. TelecityGroup Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 se.info@telecity.com www.telecitygroup.se

More information

Address: West Wenming Road, Changyuan County, Henan Province, China. Postcode: Lizzy Wu. Short Introduction to Weihua Group

Address: West Wenming Road, Changyuan County, Henan Province, China. Postcode: Lizzy Wu. Short Introduction to Weihua Group Address: West Wenming Road, Changyuan County, Henan Province, China Postcode: 453400 Lizzy Wu Short Introduction to Weihua Group Weihua Group started from a humble operation in 1988 and grew to a sizable

More information

Eaton power management solutions Eaton. All Rights Reserved..

Eaton power management solutions Eaton. All Rights Reserved.. Eaton power management solutions 1 Eaton is a leading power management company We help the world use electrical, fluid and mechanical power more reliably, efficiently, safely and sustainably 2 The world

More information

Caribbean-Style Smart City. Huawei Smart City Solution

Caribbean-Style Smart City. Huawei Smart City Solution Caribbean-Style Smart City Huawei Smart City Solution 1 Cities are Transforming 2 Smart City Initiative for Caribbean 3 Huawei, Best Partner for Smart City 2 New Challenges to Cities C158 C139 C138 City

More information

Charting the Progress of Smart City Development in Shanghai

Charting the Progress of Smart City Development in Shanghai Charting the Progress of Smart City Development in Shanghai Xueguo Wen Executive Vice President of Shanghai Academy 2017 TM Forum 1 C ONTENTS Current situation Experience and outlook Strategic cooperation

More information

Investor day. November 17, IT business Laurent Vernerey Executive Vice President

Investor day. November 17, IT business Laurent Vernerey Executive Vice President Investor day November 17, 2010 IT business Laurent Vernerey Executive Vice President IT business strategic domain Centralized generation Residential Residential Industries Non Residential Transmission

More information

Development & Application Trend of China s Cloud Computing Industry. Sun Huifeng, vice president of CCID Consulting Co., Ltd.

Development & Application Trend of China s Cloud Computing Industry. Sun Huifeng, vice president of CCID Consulting Co., Ltd. Development & Application Trend of China s Cloud Computing Industry Sun Huifeng, vice president of CCID Consulting Co., Ltd. Contents Industry Development Application Trend Market Opportunities Understanding

More information

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS Cooling > Highly efficient cooling products for any IT application. DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com End-to-End Cooling Solutions from the Closet to the Data

More information

We are Ready to Enable

We are Ready to Enable Face to Face We are Ready to Enable Akram Tuffaha Huawei Middle East Region Account Service Department Director In recent industry transformations of measuring the network quality, you have mentioned the

More information

SCDMA/McWiLL Background

SCDMA/McWiLL Background SCDMA Broadband Wireless Access System And its Application in Chinese Rural Markets Bo Lin Vice-President Beijing Xinwei Telecom Technology Inc. SCDMA/McWiLL Background SCDMA is a wireless access technology

More information

SmartRow Intelligent, Integrated Infrastructure in a Self-Contained Line-Up. Solutions For Business-Critical Continuity

SmartRow Intelligent, Integrated Infrastructure in a Self-Contained Line-Up. Solutions For Business-Critical Continuity SmartRow Intelligent, Integrated Infrastructure in a Self-Contained Line-Up Solutions For Business-Critical Continuity Deploy a Fully Configured Data Center in Just Weeks Efficiency. Capacity. Availability.

More information

Vacuum Technique. Geert Follens, Business Area President Capital Markets Day 2018

Vacuum Technique. Geert Follens, Business Area President Capital Markets Day 2018 Vacuum Technique Geert Follens, Business Area President Capital Markets Day 2018 Agenda 11. Facts in brief 21. Trends and driving forces 31. Focus and priorities 41. Innovation in reality 51. Summary 2

More information

Smarter Nation. Luis Guillot, CTO of Huawei Latin America EBG

Smarter Nation. Luis Guillot, CTO of Huawei Latin America EBG Smarter Nation Luis Guillot, CTO of Huawei Latin America EBG Touches all aspects of life E-Government Safe City Hospital Education Factory Community E-Tax Transport Enterprise Smart Applications connected

More information

HUAWEI TECHNOLOGIES CO., LTD. Huawei UPS5000-A Series kVA Uninterruptible Power Systems

HUAWEI TECHNOLOGIES CO., LTD. Huawei UPS5000-A Series kVA Uninterruptible Power Systems HUAWEI TECHNOLOGIES CO., LTD. Huawei UPS5000-A Series 200-800kVA Uninterruptible Power Systems About Huawei Network Energy Corporate Information Huawei is a leading global ICT solutions provider. Through

More information

Huawei Technologies

Huawei Technologies Huawei Technologies 2005.10 8 Expert s Forum China Telecom leading CDMA development with innovative technology 3 Huawei Communicate Shen Shaoai is Deputy Director of China Telecom s Mobile Communication

More information

An Introduction to EC Harris. 27 February 2012

An Introduction to EC Harris. 27 February 2012 An Introduction to EC Harris 27 February 2012 Built Asset Consultancy brings together knowledge and technical skills focused on an organisations goals. It combines insights with the management of specific

More information

Cloud Load Balancer CDNetworks Inc. All rights reserved.

Cloud Load Balancer CDNetworks Inc. All rights reserved. Cloud Load Balancer Phone: (877) 937-4236 Email: info@cdnetworks.com 2019 CDNetworks Inc. All rights reserved. Table of Content DNS-based Global Load Balancing... 3 Key Features and Benefits... 4 POP Map...

More information

Universiti Teknologi PETRONAS and Hitachi launch a research hub to promote global collaboration in Applied Brain Science for Optical Topography

Universiti Teknologi PETRONAS and Hitachi launch a research hub to promote global collaboration in Applied Brain Science for Optical Topography FOR IMMEDIATE RELEASE Universiti Teknologi PETRONAS and Hitachi launch a research hub to promote global collaboration in Applied Brain Science for Optical Topography Agreement at PETRONAS Twin Towers in

More information

2018 Interim Results Announcement

2018 Interim Results Announcement (Stock Code: 01883) 2018 Interim Results Announcement 16 August 2018 1 1 Results Summary 2 Financial Performance 3 Operational Performance 2 2018 Interim Results Summary Operating profit continue to increase

More information

M+W Group s Visionary Delta Datacenter

M+W Group s Visionary Delta Datacenter Region Central Europe M+W Germany GmbH A Company of the M+W Group 23 rd April 2014 M+W Group s Visionary Delta Datacenter IKS Data Center Design & Engineering Conference 2014 Moscow, Russia M+W Group at

More information

Smart Solutions Intelligent, Integrated Infrastructure for the Data Center

Smart Solutions Intelligent, Integrated Infrastructure for the Data Center Solutions For Business-Critical Continuity Smart Solutions Intelligent, Integrated Infrastructure for the Data Center DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com Deploy

More information

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling While CRAH cooling has been

More information

Product Brochure Eaton 93PR UPS kw

Product Brochure Eaton 93PR UPS kw Product Brochure Eaton 93PR UPS 25-200 kw For more than 50 years, Eaton has been safeguarding the critical systems of businesses across the globe. Whether protecting a single desktop or the largest data

More information

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres Product Brochure DENCO Close Control Units Row-DENCO High Density Cooling for Data Centres Data Centre Cooling Through a history in close control, we have developed a broad and deep understanding of how

More information

TCL International Holdings Limited FY2000 Review & Outlook

TCL International Holdings Limited FY2000 Review & Outlook TCL International Holdings Limited FY2000 Review & Outlook Mr. Vincent Yan, Executive Director March 2001 Agenda Company Background FY2000 Overview PRC Economic Outlook Home Appliances IT Business Corporate

More information

11th Annual WCO PICARD Conference Manila, Philippines September 2016 Transforming China ecustoms and E-Port into National Single Window

11th Annual WCO PICARD Conference Manila, Philippines September 2016 Transforming China ecustoms and E-Port into National Single Window 11th Annual WCO PICARD Conference Manila, Philippines 27-29 September 2016 Transforming China ecustoms and E-Port into National Single Window Wellington LIU Tao Huawei Tech Phils.Inc Outline Progress of

More information

E-HOUSE AND PREFABRICATED SUBSTATION SPECIALISTS COMPANY PROFILE. tgood.com. Energy. Fast.

E-HOUSE AND PREFABRICATED SUBSTATION SPECIALISTS COMPANY PROFILE. tgood.com. Energy. Fast. E-HOUSE AND PREFABRICATED SUBSTATION SPECIALISTS COMPANY PROFILE tgood.com Energy. Fast. Global leader in E-House and prefabricated substation solutions with the fastest assembly, delivery and installation

More information

Implementation Plan for Pilot Projects of Green Data Centers Issued by MIIT. Jiaying Song Chinese Institute of Electronics

Implementation Plan for Pilot Projects of Green Data Centers Issued by MIIT. Jiaying Song Chinese Institute of Electronics Implementation Plan for Pilot Projects of Green Data Centers Issued by MIIT Jiaying Song Chinese Institute of Electronics Outline Background Brief Introduction Goals Work of the Scope Pilot Projects Introduction

More information

Why would you want to use outdoor air for data center cooling?

Why would you want to use outdoor air for data center cooling? Dell Fresh Air 2.0: Frequently Asked Questions Achieve improved data center efficiency and powerful enterprise performance you have come to expect from Dell, by deploying Dell Fresh Air hardware. Competitively

More information

Solution Railway. tgood.com

Solution Railway. tgood.com Solution Railway tgood.com TGOOD Introduction TGOOD is the global leader in prefabricated electric power distribution solutions. It is the company that first comes to mind when cost-effective electric

More information

Cooling on Demand - scalable and smart cooling solutions. Marcus Edwards B.Sc.

Cooling on Demand - scalable and smart cooling solutions. Marcus Edwards B.Sc. Cooling on Demand - scalable and smart cooling solutions Marcus Edwards B.Sc. Schroff UK Limited Data Centre cooling what a waste of money! A 1MW data center needs 177,000,000 kwh in its lifetime of 10

More information

Application of Green Technology For Data Centre

Application of Green Technology For Data Centre Application of Green Technology For Data Centre Steven So Vice President Data Centre Business Cloud Business Division NTT Com Asia Limited 25 Sep 2013 Today s Agenda Why? How? What? Business Drivers

More information

Sept 29, Schneider Electric s Micro Data Center Solutions

Sept 29, Schneider Electric s Micro Data Center Solutions Sept 29, 2015 Schneider Electric s Micro Data Center Solutions Micro Data Center Solutions ..by 2018 Digital traffic is expanding annually by 23%+, creating the need to scale digital infrastructure Source:

More information

Agenda. Major Achievements in the FY2000. Operating Results for the FY2000. Financial Results for the FY2000

Agenda. Major Achievements in the FY2000. Operating Results for the FY2000. Financial Results for the FY2000 Agenda Major Achievements in the FY2000 Operating Results for the FY2000 Financial Results for the FY2000 1 Major Achievements in the FY2000 Continued Rapid Business Growth 2000 Acquisition and Financing

More information

Modular & Mobile Data Centre Solutions. Data Centre Solutions Expertly Engineered

Modular & Mobile Data Centre Solutions.     Data Centre Solutions Expertly Engineered Modular & Mobile Data Centre Solutions www.workspace-technology.com www.mobiledatacentre.com Data Centre Solutions Expertly Engineered ...providing clients with complete agility, delivering a scalable

More information

Construct CPIP, Implement Five Key Projects, and Promote. Urban Informationization in Beijing

Construct CPIP, Implement Five Key Projects, and Promote. Urban Informationization in Beijing Construct CPIP, Implement Five Key Projects, and Promote Urban Informationization in Beijing ----Idea and Practice of Urban Informationization in Beijng I. The Promotion Of Modernization Through Informationization

More information

To better deliver peopleto-things

To better deliver peopleto-things SOLUTIONS Industry Perspectives SOLUTIONS MBB: Where agility and growth go hand in hand With the total number of base stations set to double over the next five years, Huawei's MBB 2020-focused GigaRadio

More information

IPv6 Development in China

IPv6 Development in China 2010/TEL41/DSG/WKSP2/011 Agenda Item: Panel Discussion 2 IPv6 Development in China Submitted by: China Workshop for IPv6: Transforming the Internet Chinese Taipei 8 May 2010 IPv6 development in China Zhicheng

More information

Innovative ICT improves e-government efficiency

Innovative ICT improves e-government efficiency Copyright Huawei Technologies Co., Ltd. 2015. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies

More information

UBS Warburg Global Technology Conference Mr. Ding Donghua,, Chief Financial Officer of CMHK February 19, 2001

UBS Warburg Global Technology Conference Mr. Ding Donghua,, Chief Financial Officer of CMHK February 19, 2001 UBS Warburg Global Technology Conference Mr. Ding Donghua,, Chief Financial Officer of CMHK February 19, 2001 0 China (Hong Kong) Ltd History of Development Business Strategy Latest Development 1 History

More information

Nominee: Prefabricated, Pre Assembled Data Centre Modules by Schneider Electric

Nominee: Prefabricated, Pre Assembled Data Centre Modules by Schneider Electric Nominee: Prefabricated, Pre Assembled Data Centre Modules by Schneider Electric Nomination title: Schneider Electric Prefabricated, Pre Assembled Data Centre Modules Schneider Electric has introduced a

More information

SmartAisle Intelligent, Integrated Infrastructure Using Row-based Building Blocks. Solutions For Business-Critical Continuity

SmartAisle Intelligent, Integrated Infrastructure Using Row-based Building Blocks. Solutions For Business-Critical Continuity SmartAisle Intelligent, Integrated Infrastructure Using Row-based Building Blocks Solutions For Business-Critical Continuity Deploy An Efficient and Flexible Row-Based Infrastructure Efficiency. Capacity.

More information

Thermal management. Thermal management

Thermal management. Thermal management Thermal management Thermal management Managing thermal loads is a major challenge for all Data Centre operators. Effecting proper control of the thermal environment drives energy consumption and ultimately

More information

Technology for Constructing Environmentally Friendly Data Centers and Fujitsu s Approach

Technology for Constructing Environmentally Friendly Data Centers and Fujitsu s Approach Technology for Constructing Environmentally Friendly Data Centers and Fujitsu s Approach Hiroshi Nagazono In recent years, IT devices such as servers have come to have high performance and be highly integrated

More information

Corporate Presentation

Corporate Presentation Stock Code: 2342.HK Corporate Presentation Interim Results 2008 Agenda Overview Financial Highlights Financial Review Customer Review Business Review Market Outlook Open Forum 2 Overview Revenue from international

More information

Conquer New Digital Frontiers with leading Public Cloud Platforms.

Conquer New Digital Frontiers with leading Public Cloud Platforms. Singtel Business Product Factsheet Brochure Managed Defense Public Cloud Services Conquer New Digital Frontiers with leading Public Cloud Platforms. Singtel Managed Public Cloud supports enterprises in

More information

Microsoft s Cloud. Delivering operational excellence in the cloud Infrastructure. Erik Jan van Vuuren Azure Lead Microsoft Netherlands

Microsoft s Cloud. Delivering operational excellence in the cloud Infrastructure. Erik Jan van Vuuren Azure Lead Microsoft Netherlands Microsoft s Cloud Delivering operational excellence in the cloud Infrastructure Erik Jan van Vuuren Azure Lead Microsoft Netherlands 4 Megatrends are driving a revolution 44% of users (350M people) access

More information

HPC Solutions in High Density Data Centers

HPC Solutions in High Density Data Centers Executive Report HPC Solutions in High Density Data Centers How CyrusOne s Houston West data center campus delivers the highest density solutions to customers With the ever-increasing demand on IT resources,

More information

18 th National Award for Excellence in Energy Management. July 27, 2017

18 th National Award for Excellence in Energy Management. July 27, 2017 18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months

More information

Neusoft Overview. Neusoft Corporation

Neusoft Overview. Neusoft Corporation Neusoft Overview Copyright@2016 Neusoft Corporation 25 years ago, Neusoft was founded on a university campus Founded at Northeastern University of China in 1991 Initial asset was just 3 computers, 3 people

More information

Innovative Fastening Technologies

Innovative Fastening Technologies Innovative Fastening Technologies Corporate Overview 2011 Update Infastech is one of the world s largest producers of engineered mechanical fasteners with revenues exceeding USD500 million and an industry

More information

About 1st 2nd and 3rd tier in China

About 1st 2nd and 3rd tier in China About 1st 2nd and 3rd tier in China China has a population of more than 1.3 billion people. However the lifestyles, living standards, education level and consumer needs of the population varies greatly

More information

Third Annual Green IT & Sustainability Survey: U.S. Results and Services Implications

Third Annual Green IT & Sustainability Survey: U.S. Results and Services Implications Third Annual Green IT & Sustainability Survey: U.S. Results and Services Implications Gard Little Research Manager Worldwide Services, Global Services Markets & Trends 2009 IDC 1 Agenda Overview of the

More information

Accelerate Your Enterprise Private Cloud Initiative

Accelerate Your Enterprise Private Cloud Initiative Cisco Cloud Comprehensive, enterprise cloud enablement services help you realize a secure, agile, and highly automated infrastructure-as-a-service (IaaS) environment for cost-effective, rapid IT service

More information

POWER AND THERMAL MANAGEMENT SOLUTIONS

POWER AND THERMAL MANAGEMENT SOLUTIONS POWER AND THERMAL MANAGEMENT SOLUTIONS Power has long been a critical public utility we depend on in our homes and daily lives. Companies are under pressure to provide the necessary hardware and software

More information

Custom Designed Prefabricated Data Centre Buildings

Custom Designed Prefabricated Data Centre Buildings Custom Designed Prefabricated Data Centre Buildings ecentre TM is a complete, pre-equipped, custom designed modular technical facility to house and power data and communication equipment. A modern prefabricated

More information

Huawei Railway Multi-Service Bearer Network solution.indd

Huawei Railway Multi-Service Bearer Network solution.indd Huawei Railway MultiService Bearer Network solution Huawei Railway Multi-Service Bearer Network solution.indd 2 2012-8-24 18:39:56 3 Huawei Railway Multi-Service Bearer Network solution.indd 3 2012-8-24

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

telensa.com @Telensa Telensa is the only firm monetizing multiple IoT applications including smart lighting and smart parking. We deliver ultra-scalable, private network solutions through Ultra Narrow

More information

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation Ee The Efficient Enterprise All content in this presentation is protected 2008 American Power Conversion Corporation Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic!

More information

THE WORLD S BEST- CONNECTED DATA CENTERS EQUINIX MIDDLE EAST & NORTH AFRICA (MENA) Equinix.com

THE WORLD S BEST- CONNECTED DATA CENTERS EQUINIX MIDDLE EAST & NORTH AFRICA (MENA) Equinix.com THE WORLD S BEST- CONNECTED DATA CENTERS EQUINIX MIDDLE EAST & NORTH AFRICA (MENA) Equinix.com PLATFORM EQUINIX A PLATFORM FOR GROWTH As the world s largest data center company, Equinix brings global leaders

More information

Colocation in the City of Angels

Colocation in the City of Angels Colocation in the City of Angels Why Los Angeles, a Global Business Hub and the Digital Gateway to Asia-Pacific, is an Essential Data Center Location Contents Introduction The Interdependence of Colocation

More information

Compatible, Reliable, and Performance-Leading Huawei FusionSphere Cloud OS

Compatible, Reliable, and Performance-Leading Huawei FusionSphere Cloud OS Compatible, Reliable, and Performance-Leading Huawei FusionSphere Cloud OS HUAWEI TECHNOLOGIES CO., LTD. Challenges for Enterprise Cloud Computing IT Infrastructure Information technology is changing the

More information

Harnessing ICT technology to build a Better Connected World. Lim Chee Siong Chief Marketing Officer Huawei South Pacific Region

Harnessing ICT technology to build a Better Connected World. Lim Chee Siong Chief Marketing Officer Huawei South Pacific Region Harnessing ICT technology to build a Better Connected World Lim Chee Siong Chief Marketing Officer Huawei South Pacific Region Where there is vitality, there is the center of the world Steel Pittsburgh

More information

Huawei CloudFabric Solution Optimized for High-Availability/Hyperscale/HPC Environments

Huawei CloudFabric Solution Optimized for High-Availability/Hyperscale/HPC Environments Huawei CloudFabric Solution Optimized for High-Availability/Hyperscale/HPC Environments CloudFabric Solution Optimized for High-Availability/Hyperscale/HPC Environments Internet Finance HPC VPC Industry

More information

The Power behind Data Centres. HK Electric - Your Reliable Energy Partner

The Power behind Data Centres. HK Electric - Your Reliable Energy Partner The Power behind Data Centres HK Electric - Your Reliable Energy Partner HK Electric - Your Reliable Energy Partner Serving the city for more than a century, HK Electric is one of the world's longest established

More information

Data Center. Tai Po Data Center

Data Center. Tai Po Data Center Data Center Tai Po Data Center TAI PO DATA CENTER Nexcenter The Global Data Center Vision NTT Communications offers data center services at hundreds of locations worldwide under the brand name Nexcenter.

More information

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform Case Study - Global Switch Sydney East About Global Switch Global Switch is a leading owner, operator and developer

More information

DATA CENTER COLOCATION BUILD VS. BUY

DATA CENTER COLOCATION BUILD VS. BUY DATA CENTER COLOCATION BUILD VS. BUY Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for

More information

84 kw, Tier 3, Direct Expansion, 937 ft 2

84 kw, Tier 3, Direct Expansion, 937 ft 2 [Reference Design 42] 84 kw, Tier 3, Direct Expansion, 937 ft 2 DESIGN OVERVIEW Data Center IT Capacity 84 kw Target Availability Tier 3 Annualized PUE at 100% Load 1.712 Total Racks and Average Density

More information

BUSINESS CONTINUITY AND DISASTER RECOVERY ACROSS GOVERNMENT BOUNDARIES

BUSINESS CONTINUITY AND DISASTER RECOVERY ACROSS GOVERNMENT BOUNDARIES BUSINESS CONTINUITY AND DISASTER RECOVERY ACROSS GOVERNMENT BOUNDARIES Business Continuity and Disaster Recovery State of Utah NASCIO Awards 2009 1 BUSINESS CONTINUITY AND DISASTER RECOVERY ACROSS GOVERNMENT

More information