In the context of the “Paris Subway Line 1 Automation” project, the SIL3 DOF1 safety system, which is independent from the automatic train system, will command the opening and closing of the landing doors installed on all the line’s platforms.

CONTRÔLE D'OUVERTURE ET DE FERMETURE DES FAÇADES DE QUAI DE LA LIGNE 1 DU MÉTRO PARISIEN


In the context of the “Paris Subway Line 1 Automation” project, the SIL3 DOF1 safety system, which is independent from the automatic train system, will command the opening and closing of the landing doors installed on all the line’s platforms.
This system will be used with existing MP89 trains and will be compatible with the new automatic MP05 trains that will progressively replace the current ones

> Client : RATP
> Equipment : Line 1 of the Parisian, 26 equipped stations, 52 equipped
> Standards : 61508, EN50126, EN50128, EN50129, EMC, vibration, temperature et humidity.
> Safety level : SIL3 on the inopportune opening failure of the doors

Documents and ISA* Certification


PRESENTATION OF DOF1 SYSTEM


DOF1 also prevents the train doors on the opposite side of the platform from opening.DOF1 will then be disassembled when all the automatic trains will be operation on Line 1. Then the MP89 trains will be operated on the line 4 and DOF1 will be installed on this line to enabled the correct side door, and in the future control platform screen doors. The DOF1 system includes an embedded portion on the train that processes the train door opening and closing commands made by the conductor and sends the command to the portion located in the platform’s technical office. The command to open the door is processed and sent to the landing doors.

The train/ground link is allowed via a mat installed on the rails, which creates a magnetic loop with a sensor installed on the train’s bogie. This system is Sil 4 Level safe to enable the correct side door of the train. The platform screen doors can only be opened when the train has reached the platform with a SIL3 safety level. The solution is based on Siemens SIL3 automatons.

CLEARSY is in charge of the project and responsible for the study and manufacturing of equipment series installed throughout the line.

CLEARSY adopted an original method to answer to the call to tender: a B model of the specifications was performed with the Composys tool, then graphically animated with the Brama tool. We were therefore able to define the needs of the RATP by transcribing our understanding of the system into a model and then validating this understanding by animating the system in various scenarios viewed on the screen. Questions could therefore be asked and a detailed response provided, as the system must be designed in only six months.

Like the Coppilot system, CLEARSY uses a development process that integrates the B method, from the system specifications up to the code stage. The B models developed participate in demonstrating the system’s safety and the level of availability of the system that must be very high in order to ensure fluid traffic.

The animation system is available on Brama’s site: www.brama.fr

Details of the Various Constituents of the Dof1 system


ARTICLES


> UITP 2010 – Full automation of line 1 of the Paris Metro, a service project : La ligne 1 du métro de Paris sera entièrement automatisée à compter de Juin 2011
 L’USINE NOUVELLE : La ligne 1 se transforme en métro automatique