Home » Rail » Infrastructure
Print | Sitemap
Pakenham
Last Updated: Sunday, 4th March 2007
UP Direction
Cardinia Road
DOWN Direction
East Pakenham

Distance:58.193 km
Mileage:35 miles 31 chains 49 links
Line: Pakenham
Type:Metro - Station
Code:PKM
ROA Code:PAM
Opened: Monday, 8th October 1877
Co-ordinates: (-38.0805°, 145.4865°) GDA94
Status: Premium Station
Car parking: 259
Platforms 2
Connections: Bus
Metcard Zone(s):2
Pakenham
2


Related Pages:



History

Mon, 8 Oct 1877 Opened
Mon, 8 Mar 1897 By this date, up and down distant signals abolished, up and down home signals moved further out.
(WN35/1897)
Mon, 10 Jan 1910 By this date, provide plunger lock.
(WN02/1910)
Wed, 21 Mar 1928 Up home signal moved 290 yards further out.
(WN13/1928)
Wed, 28 Mar 1928 Down home signal moved 110 yards further out.
(WN14/1928)
Wed, 18 Apr 1928 No.2 road extended, now holds 60 vehicles.
(WN22/1928)
Thu, 3 Oct 1929 Provide double-wire interlocking.
(WN43/1929)
Wed, 27 Nov 1929 Provide white discs in lieu of green on switchstands.
(WN47/1929)
Thu, 8 Aug 1935 Provide miniature electric staff in lieu of large electric staff to Officer and Nar Nar Goon.
(WN36/1935)
Fri, 13 Sep 1935 Provide automatic electric staff exchange apparatus.
(WN39/11935)
Thu, 13 Jan 1938 Down home signal replaced by bracket post, 185 yards further in.
(WN05/1938)
Wed, 19 Jan 1938 Up home signal replaced by bracket post, 174 yards further in.
(WN05/1938)
Thu, 17 Mar 1938 Provide up and down distant signals, additional arrival home signals and new interlocking on platform.
(WN14/1938)
Tue, 20 Dec 1938 Provide flashing lights at Main Street (35M 23C). Provide new post 3, 2 arms and 2 discs.
(WN01/1939)
Tue, 15 Jul 1952 By this date, No.2 road shortened by 120 feet; double-wire points at down end moved in by same amount.
(WN29/1952)
Tue, 17 Mar 1953 Provide works siding on down side of line at down end, secured by Annett lock. Provide new post 3B, down home signal.
(WN12/1953)
Sun, 13 Sep 1953 Works siding and mainline between Pakenham and Nar Nar Goon transposed.
(WN38/1953)
Sun, 27 Jun 1954 Down home signal post 2 moved 137 yards further out.
(WN27/1954)
Tue, 10 Aug 1954 By this date, telegraph instrument removed.
(WN32/1954)
Wed, 25 Aug 1954 Provide works siding on down side of line at up end, secured by Annett lock.
(WN35/1954)
Thu, 16 Sep 1954 Works siding at down end and post 3B abolished.
(WN38/1954)
Sun, 10 Oct 1954 Duplication to Nar Nar Goon with 3 position signals in service. Electric staff to Nar Nar Goon abolished. Posts 4 and 5 abolished, provide 3 position signals posts 28, U28, 32 and U32. Provide control panel to work junction at down end.
(WN42/1954)
Sun, 19 Dec 1954 Mainline deviated to down side between Officer and Pakenham. Posts 1, 2 and 3 abolished, provide 3 position signals 6, 12 and 4 and automatic signal D1799. Mechanical interlocking abolished.
(WN01/1955)
Sun, 27 Feb 1955 Duplication from Officer with 3 position signals in service, electric staff from Officer abolished. Provide catch points at down end of No.2 road.
(WN10/1955)
Wed, 17 Sep 1958 8 and 30 dwarf signals previously motor operated, now light signals.
(RA531 Rev.2)
Sun, 5 Apr 1959 Duplication provided through Pakenham; provide island platform. Provide switching facility and illuminated letter A on posts 6, 14, 28 and 32.
(WN15/1959)
Wed, 2 Feb 1972 Proposal assembled to provide a siding for Hutmill at the down end, by converting turnout and catch 27 to a crossover, then extending No.3 road over Racecourse Road, with a loop of approximately 400 feet clear length, then a headshunt of approximately 250 feet clear length.
(465/71)
Fri, 25 Jan 1974 Track layout and grading of proposed Hutmill siding amended to allow for weighbridge between Racecourse Road and the loop.
(465/71 Rev.A)
Thu, 11 Apr 1974 Proposal for Hutmill Siding amended with shunters path provided and rail weight altered.
(465/71 Rev.B)
Thu, 24 Oct 1974 Layout altered to allow terminating of suburban trains from Dandenong.

Stage 1 works - No.2 road made bidirectional. Signal D1918 (lever 34) medium speed aspect made approach operated. Signal 24 provided. Signals 6 and 8 provided with aspects to No.2 road. These permit suburban trains to arrive in and terminate at the south-side platform.

Stage 2 works - No.1 road made bidirectional. Crossover 11 and signal 16 provided. Dwarf 30 provided with route to No.1 Road towards signal 16. Lever control on signal D1799 (lever 4) added to provide overlap clear of crossover 11.
(465/71 Rev.C)
Wed, 11 Dec 1974 Provide flashing lights at McGregor's Road (55.839km).
(WN02/1975)
Thu, 12 Dec 1974 Panel 2 of Track diagram in signal box redrawn to show crossover 11; patches provided over panels 1 and 3 to amend signals and road numbers.
(RH402 Rev.A)
Sun, 13 Apr 1975 Panel 1 of track diagram in signal box amended with additional block and signal D1721 added; one track section removed from down line on Panel 2.
(RH402 Rev.C)

Panels 2, 3 and 4 of track diagram in signal box amended to show Signal 24 and flashing lights at McGregors Road and Racecourse Road.
(RH402 Rev.B)
Fri, 11 Jun 1976 Panels 4 of track diagram in signal box redrawn to show lead to Hutmill Siding; patch added to Panel 5.
(RH402 Rev.D)
Fri, 8 Oct 2004 Dwarf signal 30 converted to LED type.
Sun, 15 May 2005 Additional track circuits were installed (turnout fouling project) to ensure train, broken rail and broken bond detection on main line turnouts
Thu, 21 Dec 2006 A Westrace Data update was carried out to overcome Express and Stopping Route Setting issues. Data installed in Pakenham interlocking (PKM1A).
(SW.334/2006, WN01/2007)
Sun, 4 Feb 2007 Home Signals 12 and 14 converted to LED
(SW.020/2007, WN05/2007)
Sun, 11 Feb 2007 Up Home Signal PKM16 and Up Controlled Automatic Signal PKM10 converted to LED.
(SW.026/2007, WN06/2007)
Sun, 18 Feb 2007 Automatic Signals D1721, D1722, D1800 and PKM4 converted to LED.
(SW.030/2007, WN07/2007)
2021 Effective 0800 hours 6th April 2021 Start and End RFR signs will be progressively removed, in line with updates to Section 36 of the 1994 Book of Rules and Operating Procedures (as amended) which will be issued on a separate SW Circular. Amend diagram 73/18.
(WON 13/2021, SW.0041/2021)
Mon, 8 Aug 2022 No.4 and No.5 roads are abolished, along with most of No.3 road. A short portion (75m) of the latter is retained at the down end, allowing shunting to and from Siding A. Overhead wiring is removed from this portion of No.3 road, now renamed the Shunt Neck, and Siding A, along with the rest of the yard.

Train stop and TPWS units will remain raised/energised for routes to/from No.3 road, to prevent entry by unauthorised trains.

Home signal PKM711 is abolished, and PKM715 is relocated from the gantry to a new ground mast. Points PKM611U and PKM611D are abolished, with circuit alterations made to retain detection of PKM611U in the normal position until such time as the physically removed.
(WON 31/2022, SW.812/2022)
Mon, 10 Oct 2022 As at 0300 hours, the following changes are made in the lead up to grade separation:
• No.3 road, baulks and buffer light are abolished
• Siding "A" and the baulks are abolished
• Home signal PKM728 is abolished
• Dwarf signal PKM729 is abolished
• Points PKM628 is abolished, but not removed. Normal detection of the points will be retained, and track circuits PKM682T and PKM728T have blocks applied in the interim.
(WON 39/2022, SW.0742/2022)
Tue, 11 Oct 2022 SW.249/2019 is cancelled.
(WON 40/2022, SW.0479/2022)

Line History

Mon, 8 Oct 1877Line OpenedDandenong - Pakenham
Wed, 21 Jul 1954ElectrifiedDandenong - Pakenham
Fri, 25 Feb 1955DuplicatedOfficer - Pakenham
Tue, 29 Jun 20213000mm containers no longer permittedMelbourne Yard - Pakenham (WON 26/2021, TON 0305.2021)

Photos of Trains at Pakenham
(click on the photos for an enlargement)
G527 with #9142 loaded grain from North Geelong to Kensington at Pakenham

G527 with #9142 loaded grain from North Geelong to Kensington at Pakenham
Wednesday, 11th December 2013
Photo: Ian Green


XRB560 waits for the BLs to runaround before conducting another test run at Pakenham

XRB560 waits for the BLs to runaround before conducting another test run at Pakenham
Sunday, 11th December 2005
Photo: Chris Gordon


Siemens Train 826M sits in the morning sun at Pakenham

Siemens Train 826M sits in the morning sun at Pakenham
Saturday, 6th May 2006
Photo: Matt Julian


Photos of Infrastructure at Pakenham
(click on the photos for an enlargement)
80km/h points at the down end at Pakenham

80km/h points at the down end at Pakenham
Saturday, 3rd July 2004
Photo: Chris Gordon


Panel inside the signalbox at Pakenham

Panel inside the signalbox at Pakenham
Monday, 20th September 2004
Photo: Chris Gordon


End of the overhead at Ryans Road near Pakenham

End of the overhead at Ryans Road near Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


Home Signals PKM28 and PKM26 at Pakenham

Home Signals PKM28 and PKM26 at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


Home Signals PKM32 and PKM30 at Pakenham

Home Signals PKM32 and PKM30 at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


Old communications for the up direction and new touch screen VDU for down direction at Pakenham

Old communications for the up direction and new touch screen VDU for down direction at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


VDU for control of down end of Pakenham and indications to Bunyip at Pakenham

VDU for control of down end of Pakenham and indications to Bunyip at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


VDU for control of up end and Pakenham at Pakenham

VDU for control of up end and Pakenham at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


VDU screen with Alarms and Switch In/Out at Pakenham

VDU screen with Alarms and Switch In/Out at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


VDUs for control and indications at Pakenham

VDUs for control and indications at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


Workstation in the signal box at Pakenham

Workstation in the signal box at Pakenham
Friday, 14th July 2006
Photo: Chris Gordon


Racecourse Road Level Crossing at Pakenham

Racecourse Road Level Crossing at Pakenham
Saturday, 5th May 2007
Photo: James Hansen


T369 leads IEV102 and T376 on #7527 down Metro infrastructure evaluation run from Flinders Street to Pakenham, Cranbourne and later Flemington Racecourse near Pakenham

T369 leads IEV102 and T376 on #7527 down Metro infrastructure evaluation run from Flinders Street to Pakenham, Cranbourne and later Flemington Racecourse near Pakenham
Tuesday, 9th April 2013
Photo: Luke Bailey


T376 leads IEV102 and T369 on #7532 up Metro infrastructure evaluation run to Cranbourne and later Flemington Racecourse at Pakenham

T376 leads IEV102 and T369 on #7532 up Metro infrastructure evaluation run to Cranbourne and later Flemington Racecourse at Pakenham
Tuesday, 9th April 2013
Photo: Luke Bailey



Copyright 1997 - 2022 © VICSIG - http://www.vicsig.net Printed: 10th December 2022