Relevant Statutes: Minn. Stat. 216G.03 to 216G.05
Permitting Timeline: 45 Days
The PUC Role: The Commission makes the final decision about what appropriate action to take.
Who’s Involved:
Permitting Process:
If a permit applicant’s proposed pipeline is a hazardous liquid pipeline with a nominal diameter of less than 6” and 275 psi or it does not require a pipeline routing permit from the Minnesota Public Utilities Commission (Commission). The proposed pipeline may still require Commission approval of an Information Book that is distributed to owners and tenants of property along the route of the pipeline. Minnesota Statutes outline specific content and timing requirements and conditions associated with the Information Book process.