Home > Projects & Programs > Eastside Transit Corridor Phase 2


Eastside Transit Corridor Phase 2


Overview

Metro has completed the Alternatives Analysis (AA) study that evaluates potential alternatives for the second phase of the Metro Gold Line Eastside Extension. The goal of the proposed study is to improve mobility in the corridor by connecting to communities further east of Los Angeles. 

Communities in the study area include: Bell, Commerce, Downey, El Monte, Industry, Los Angeles, Montebello, Monterey Park, Pico Rivera, Rosemead, Santa Fe Springs, South El Monte, Whittier and the unincorporated portions of LA County.

Facts about the Eastside Transit Corridor Phase 2:

  • Metro is recommending the advancement of two light rail transit (LRT) alternatives into the Draft Environmental Impact Statement/Draft Environmental Impact Report (Draft EIS/EIR) for further technical and environmental review
  • The two light rail alternatives are: State Route 60 and Washington Bl
  • In addition, Metro will also study a No Build Alternative and a Transportation Systems Management (TSM) Alternative (i.e. service improvements to existing bus lines) in the Draft EIS/EIR
  • The Beverly Boulevard and Beverly/Whittier Boulevards alternatives will not be recommended for further study


FAQ

  1. What is Metro Eastside Transit Corridor Phase 2?
    Metro Eastside Transit Corridor Phase 2 is a transit study looking to connect with and extend the recently opened Gold Line Eastside Extension light rail line which runs from Union Station to Pomona and Atlantic boulevards in East Los Angeles to communities farther east. The project goals include improving mobility in the study area, and planning for future growth in a sustainable manner.

  2. What is an environmental study?
    Federal and state laws require an evaluation of project impacts and identification of mitigation measures. To be eligible to receive both federal and state funds, projects need to comply with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).  Therefore, the Eastside Transit Corridor Phase 2 project will complete both a Draft Environmental Impact Statement and Report (Draft EIS/R). The public is encouraged to participate in the environmental process and will be notified of public meetings.

  3. How will the Eastside Transit Corridor Phase 2 be funded?
    In 2007, Los Angeles County voters approved Measure R, a half-cent sales tax measure that will generate an estimated $40 billion dollars over 30 years, including $1.27 billion for the Eastside Transit Corridor Phase 2 project. Current projections show funding for the Eastside Transit Corridor Phase 2 project will be available after 2022. Metro is also exploring other federal and state funding sources that may help to complete the funding and/or expedite the implementation of the project. In addition, Metro is working with cities to define what local contributions may be needed to comply with the sales-tax measure.

  4. What is LRT?
    Light Rail Transit or LRT, is quiet electric powered trains that are designed to be integrated into the communities they serve. They generally are the size of articulated buses and up to three cars in length. They function best as a local service with frequent station stops less than a mile apart. LRT is not the same as Metrolink or Amtrack trains which are larger and faster diesel power trains designed for longer distance commuting trips.

  5. What alignments are under consideration?
    At the beginning of the Alternatives Analysis, 47 alternatives were identied and screened using federally approved evaluation criteria. In 2009, the Metro Board approved the Alterantives Analysis Study (AA) and authorized two light rail alternatives to move forward into the environmental phase including SR-60 LRT and Washington Boulevard LRT. Both of these alternatives received a significant amount of community support as well as city council resolutions/letters of support.

  6. Why can’t we have a project that goes along SR-60 and also connects with cities like Pico Rivera and Whittier?
    During the Alternatives Analysis (AA) phase of the study, Metro examined 47 alternatives, which included two alternatives that would connect northern cities with southeast cities within the study area. However, these two alternatives had slower travel times, lower ridership, and were not as cost-effective compared to the other alternatives that performed better. Therefore, those two alternatives were dropped from further consideration.

  7. Where will the stations be located?
    Proposed station locations for both SR-60 and Washington Boulevard alternatives have been identified, including:

    SR – 60 LRT

    • Garfield Avenue
    • The Shoppes at Montebello
    • Santa Anita Avenue
    • Peck Road

    Washington Boulevard LRT

    • Garfield Avenue
    • Whittier Boulevard
    • Greenwood Avenue
    • Rosemead Boulevard
    • Norwalk Avenue
    • Lambert Avenue
     
    Through the environmental phase of the project, station planning will intensify and station area refinements will occur if needed based on city and community input.

  8. What factors determine whether a rail project is built at street level or elevated?
    Metro considers a wide variety of inputs to determine how a rail project is configured. These include but are not limited to the following:

    • Available right of way
    • Land use impacts
    • Environemental impacts
    • Cost
    • Travel time
    • Ridership
    • Safety
    • Community and city input

  9. What are the air quality impacts of LRT?
    Because LRT is electric powered, the trains do not emit any green house gases or pollution.  In addition, train ridership helps to take cars off the road which further reduces emissions.  The only air quality impact associated with LRT is the generation of the electric power itself, which is part of the environmental evaluation.

  10. What are the noise and vibration impacts of LRT?
    Because LRT is electric powered, the trains are very quiet.  In addition, the size and speed of the trains is designed with community integration in mind including the use of special features like vibration dampening fasteners to secure the rail tracks which helps minimize noise and vibration around communities.

  11. How will pedestrian safety be addressed?
    All light rail transit in Los Angeles County is designed using federal and state safety standards.  These include stringent siesmic codes, ADA standards, pedestrian design guidelines, parking codes and a host of other safety considerations.  Station area platforms will be well lit and have security cameras installed as well as Metro security personnel assigned to ride the system and patrol the station areas for additional safety.  All parking and related station area amenities will also be well signed and lit for easy access.   In general, LRT is used throughout the world and has proven to be a safe and reliable form of transportation for millions of riders and hundreds of communities.

  12. When will this project be constructed?
    In short, the project will be constructed when the project studies and engineering are completed and the funding is available.  Current Metro funding scenarios show that the local Measure R money could be available starting in 2022.  Metro is also exploring the potential of state and federal money that may be used to accelerate the project implementation schedule.

  13. How do my comments get incorporated into the study?
    All comments received throughout  the study are documented and presented to Metro staff and technical consultants for consideration.  In addition, public comments received during the formal scoping and public hearing phases of the environmental study are presented in the appendix of the Draft EIS/R documents and responded to in the Final EIS/R.

  14. How can I stay involved throughout the entire process?
    The easiest way to stay involved in the study process is to become part of the project database.  If you have signed-in at a previous meeting you are automatically included, however, if you would like to be added you can simply call the project helpline at 213.922.3012.  Over the course of the study, meeting notifications and other project materials will be mailed to the project database to keep interested persons informed of the study developments.  In addition, you can also access project information via the web at www.metro.net/eastsidephase2 or become a fan on Facebook at facebook.com/metroeastsidehphase2.

  15. From the two remaining alternatives, which is the most feasible?
    There were originally 47 alternatives that were identied at the beginning of the Alternatives Analsyis Study and eventually narrowed down to two. Each of the proposed alternatives were screened across federally approved criteria to determine their feasibility.  Therefore, each of the two remaining alternatives are considered by the Los Angeles County Metropolitan Transportation Authority (Metro) to be feasible.  In the environmental phase,  evaluation of impacts will be done to further consider the viability of each alternative, taking into consideration the cost, environmental impacts, and community input.



  • <p>Dedicated to providing Los Angeles County with a world class transportation system</p>
    Eastside Transit Corridor Phase 2 (6)


View More Galleries
Eastside Phase 2 meeting 01
 

Eastside Phase 2 meeting 02
 

Eastside Phase 2 meeting 03
 

Eastside Phase 2 meeting 04
 

Eastside Phase 2 meeting 05
 

Eastside Phase 2 meeting 06
 


Showing the latest posts relating to: Eastside Transit Corridor Phase 2

Eastside Transit Corridor meetings next week

Posted by Steve Hymon on August 25, 2010 10:30 am
Click above for a larger image. Two public meetings have been scheduled on the Eastside Transit Corridor project, which could extend the Gold Line from its current terminus in East Los Angeles to ...

The future of Metro rail

Posted by Steve Hymon on July 15, 2010 8:50 am
We’ve spent plenty of time looking back, with this past Wednesday being the 20th anniversary of the Blue Line and the birth of Metro Rail. I wanted to look forward today and provide a quick ...

500 weigh in on phase 2 of Gold Line Eastside Extension

Posted by Steve Hymon on April 27, 2010 9:15 am
Metro CEO Art Leahy provided an update in his daily email to staff on the planning process for the Gold Line Eastside Extension Phase 2 project, which could extend the Gold Line from East Los Angeles ...

Metro creates new 30/10 Initiative web page

Posted by Steve Hymon on April 22, 2010 3:36 pm
Click above to visit Metro's new 30/10 web page Here’s the link to the new web page on the 30/10 Initiative that received the unanimous support of the agency’s Board of Directors ...

Metro’s Facebook page hits 2,000 fans

Posted by Fred Camino on April 7, 2010 11:34 am
Last December, Metro launched its official Facebook page in an attempt to better communicate with customers and taxpayers using the ubiquitous social networking tool. By the end of 2009 Metro had a ...

Subway project launches new Facebook page

Posted by Steve Hymon on March 10, 2010 9:06 am
The Westside Subway Extension launched a new Facebook page last week — a good way for Facebookers to easily get information about the project mixed in with status updates from friends and ...

Eastside Phase 2 meetings begin tonight

Posted by Steve Hymon on February 22, 2010 9:16 am
The public can get the latest news on plans to improve transit in the area east of the Eastside Gold Line extension. Four alternatives are being studied as part of a draft environmental impact ...

Public meetings to be held on Eastside Gold Line Phase 2

Posted by Steve Hymon on February 11, 2010 9:42 am
The Eastside Gold Line Extension just opened in November but planning continues on a possible extension of the extension to South El Monte or Whittier. Four public meetings are being held in late ...

Transportation headlines, Tuesday, January 19

Posted by Steve Hymon on January 19, 2010 8:49 am
It’s hard not to be a grumpy bear when it rains like this, so naturally I started my morning with a story from the San Diego Union-Tribune about the roll-out there of plastic, reusable fare ...

Metro launches official Facebook page and wants you to become a fan

Posted by Fred Camino on December 22, 2009 11:36 am
After a month of testing, Metro has officially launched its official Facebook presence, joining the ranks of everyone you know including grandma and that weird guy you kinda remember from high ...

Stay Connected
Receive email alerts and follow on the web.
  • Get e-mail updates
  • Get updates at facebook.com/MetroEastsidePhase2


Metro recently held public meetings to gather input from the community and to provide information on the Scoping process. Below is the video presentation of these meetings conducted February 22, 24, 25, 27 in El Monte, Montebello, Pico Rivera and Whittier.


Metro wants to hear from you. Do you have a question about the study, want more information, or want to be added to our database? You can also contact us about scheduling a presentation for your organization.

Here’s how you can send us your comments, questions or requests:

Project Team:
Ms. Kimberly Yu, Project Manager

Contact Information:
Metro
One Gateway Plaza
Mail Stop
Los Angeles, CA 90012

Comment/Question Form: Complete the form to leave us your questions and comments or be added to our mailing list.
Tel: 213.922.3012
Phone messages are retrieved at least once every business day.
Facebook:
Look for our group at
“Metro Eastside Transit Corridor Phase 2”