Project Status

Environmental Assessment

Both the federal Environmental Assessment (EA) and the state Environmental Assessment Worksheet (EAW) for the corridor have been prepared and are available on this site in the Documents section .

Current Projects

There are two projects already underway in the Bottineau Boulevard corridor.

Proposed Construction

Click on a link or the map below to display information about each proposed segment of the project.

Complete Projects

  • C.R. 81 From Lowry Avenue to T.H. 100
      Status: This segment of the project was completed in 2008.

Project Map