Tel: (+265) 1 836 000 Email: egenco@egenco.mw

Kapichira Power Station

The Kapichira Hydro-electric Power Station is located at the Kapichira Falls, formerly known as the Livingstone Falls; named after the all-great Scottish Missionary, Dr. David Livingstone, who once passed through these falls.

The Kapichira Power Station is in Chikwawa District and shares boundaries with Majete Game Park. The Power Station was first commissioned in the year 2000 with just two machines and each machine having an installed capacity of 32.4 MW.

In 2013 the station’s installed capacity was increased with additional two machines making a total of four machines with a total generation capacity of 129.6MW. The Facility comprises of a water reservoir with a capacity of 9.05 m³ of which 3.5m³ is active storage at an elevation of 147m. The Water is conveyed to the machine turbines through a common headrace tunnel which is 550m long and 8.8m in diameter. The height difference between the Water Reservoir and the machines’ turbines is 54m.

Installed Capacity

Station Name No. Of Machines Capacity per Machine (MW) Total Capacity (MW) Status
Phase I 2 32.4 64.8  Available
Phase II 2 32.4 64.8  Available

 

Contacts

Electricity Generation Company (Malawi) Ltd
No. 7 Victoria Avenue
Chayamba Building
P.O. Box 1567
Blantyre, Malawi

Telephone : +265 1 836 000
Email : egenco@egenco.mw
All communication to be addressed to the CEO

Email Subscription

Subscribe to our newsletter to get latest news updates