Interview Schedule for selection to the post of Scientist-B in the Ministry of New and Renewable Energy (MNRE) on direct recruitment basis.

Scheme / Documents

 

The National Solar Mission was launched on the 11th January, 2010 by the Prime Minister. The Mission has set the ambitious target of deploying 20,000 MW of grid connected solar power by 2022 is aimed at reducing the cost of solar power generation in the country through (i) long term policy; (ii) large scale deployment goals; (iii) aggressive R&D; and (iv) domestic production of critical raw materials, components and products, as a result to achieve grid tariff parity by 2022. Mission will create an enabling policy framework to achieve this objective and make India a global leader in solar energy.

Further, Government has revised the target of Grid Connected Solar Power Projects from 20,000 MW by the year 2021-22 to 100,000 MW by the year 2021-22 under the National Solar Mission and it was approved by Cabinet on 17th June 2015.

Indian Solar Radiation Atlas
________________________________________________________________________________________________________

Grid connected Solar Systems

 

Phase - II

   Schemes / Guidelines / Clarifications / OM

Solar Park Scheme

OM – Introduction of new milestone for release of CFA to CTU/STU for development of external power evacuation systems of solar parks under the scheme for “Development of Solar Parks and Ultra Mega Solar Power Project” . (Posted on 19.01.2018) (409 KB, pdf)

OM on - Applicability of Environment Impact Assessment (EIA) Notification, 2006 on Development of Solar Parks. (Posted on 18.08.2017) (3.67 MB, pdf)

Corrigendum - Regarding Purchase of at least 20% of solar power produced in Solar Park through DISCOMS (Posted on 28.07.2017) (1.66 MB, pdf)

OM-Verification of Receipt of Material for Pooling Stations by SECI (Posted on 28.07.2017) (757 KB, pdf)

Format for submission of Proposal for New Solar Park by the State UT Governments (Posted on 28.07.2017) (2.54 MB, pdf)

Standard Table of Contents for Detailed Project Reports (DPRs) of Solar Park (Posted on 28.07.2017) (271 KB, pdf)

Completion of Solar Projects as per schedule-reg. (Posted on 22.06.2017) (25.2 KB, pdf)

Scheme for Enhancement of capacity from 20,000 MW to 40,000 MW for “Development of Solar Parks and Ultra Mega Solar Power Projects”. (Posted on 22.03.2017) (7.70 MB, pdf)

Scheme for Development of Solar Parks and Ultra Mega Solar Power Projects in the country commencing from 2014-15 and onwards (i.e. from the year 2014 – 15 to 2018 – 19) (Posted on 18.12.2014) (837 KB, pdf)

Guidelines for Development of Solar Parks under Jawaharlal Nehru National Solar Mission (Posted on 05.02.2016) (1.11 MB, pdf)

List of approved Solar Parks under the  Solar Park Scheme (As on 24.01.2018) (269 KB, pdf)

Release of CFA to Solar Energy Corporation of India for further disbursement of funds to different solar park implementing agencies for under mentioned solar parks (Posted on 21-05-2015) (Updated on 16.06.2016) (154 KB, pdf)

Categorization of Solar Parks based on progress. (Posted on 16.06.2016) (22.8 KB, pdf)

Apportionment of CFA between development of Solar Park and External Transmission System. (Posted on 30.09.2016) (1.95 MB, pdf)

CPSU Scheme

Implementation of Scheme for setting up of 1000 MW of Grid-Connected Solar PV Power Projects by Central Public Sector Undertakings (CPSUs) and Government of India Organizations under various Central/State schemes/Self-use/ 3rd party sale/ Merchant sale with viability Gap Funding under Batch-V of phase-II of JNNSM (Posted on 18.01.2015) (2.87 MB, pdf)

 AMENDMENT - Scheme for setting up of 1000 MW of Grid-Connected Solar PV Power Projects by CPSUs / Government Organizations under various Central/State schemes/Self-use/ 3rd party sale/ Merchant sale with Viability Gap Funding (VGF) under Batch-V of phase-II of JNNSM (Posted on 27.10.2015) (41.1 KB, pdf)

CORRIGENDUM - Implementation of Scheme for setting up of 1000 MW of Grid-Connected Solar PV Power Projects by Central Public Sector Undertakings (CPSUs) and Government of India Organizations under various Central/State schemes/Self-use/ 3rd party sale/ Merchant sale with viability Gap Funding under Batch-V of phase-II of JNNSM. (Posted on 22.02.2017) (2.96 MB, pdf)

Defence Scheme

Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces (under MHA) with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards (Posted on 08.01.2015) (127 KB, pdf)

Clarification regarding releasing of Viability Gap Funding (VGF) under EPC mode of 300 MW Defence scheme (Posted on 21.12.2015) (1.81 MB, pdf)

Clarification regarding administrative approval of implementation of Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces under MHA with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards (Posted on 28.01.2016) (40.8 KB, pdf)

AMENDMENT – in the Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces (under MHA) with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards. (Updated on 07.04.2017) (4.26 MB, pdf)

 

VGF Scheme (750 MW)

Further Revised Draft Guidelines for Selection of 750 MW Grid Connected Solar Power Projects Under Batch-I of JNNSM Phase-II (posted on 11.10.2013)    (820 KB, pdf)

Approval for implementation of scheme for setting up of 750 MW Grid-connected Solar PV Power projects under Batch-I of Phase II of Jawaharlal Nehru National Solar Mission (JNNSM) with Viability Gap Funding (VGF) support from National Clean Energy Fund (Posted on 15.10.2013) (57.5 KB, pdf)

RfS Document for 750 MW Grid Connected Solar PV Projects under Phase-II Batch-I of JNNSM (Posted on 29.10.2013) (1.42 MB, pdf)

 
 
 

VGF Scheme (2000 MW)

Guidelines for Implementation of scheme for setting up of 2000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase-II of the JNNSM (Posted on 12.03.2018)  (144 KB, pdf )

Guidelines for Implementation of scheme for setting up of 2000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase-II of the JNNSM (Posted on 04.08.2015) (1.35 MB, pdf)

VGF Scheme (5000 MW)

Guidelines for Implementation of scheme for setting up of 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the JNNSM (Posted on 12.03.2018)  (144 KB, pdf )

Amendment in the Guidelines for implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the JNNSM – reg. (Posted on 22.02.2018) (223.0 KB, pdf)

Amendment in the Guidelines for implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the JNNSM – reg. (Posted on 23.06.2017) (57.9 KB, pdf)

CORRIGENDUM - Solar Power Tariff under Guidelines for implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission (NSM) (Posted on 30.08.2016) (28.2 KB, pdf)

Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission (NSM) (Posted on 16.03.2016) (1.03 MB, pdf)

Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM (Posted on 24.02.2016) (218 KB, pdf)

Canal Bank / Canal Top Scheme

Pilot-cum-Demonstration Projects for Development of Grid Connected Solar PV Power Plants on Canal Banks and canal Tops Scheme (Posted on 10.12.2014) (127 KB, pdf)

The Status of Pilot-cum-Demonstration Project for Development of Grid Connected Solar PV Power Plants on Canal Banks and Canal Tops Scheme (Posted on 04.06.2015) (720 KB, pdf)

Progress Report (As on 06.03.2017) (18 KB, xlsx)

 

Solar Statistics Net exported Solar Power Generation - Summary (month wise) (As on 28-02-2015)   Solar Power Generation Data for Crystalline & Thin Film Projects (per MW) (Posted on 21.05.2014) (227 KB, pdf)   State wise Estimated Solar Power Potential in the Country (Posted on 24.11.2014)(790 KB, pdf)

 

 
 
Solar Manufacturing

Information sought from all Solar Cell and Module Manufacturers in India regarding Installed capacities, operational capacities and annual production of previous years as on 31.07.2017 (Posted on 31.08.2017) (332 KB, pdf)

List of Associations of Solar Manufacturers endorsed by MNRE (As on 18.10.2016) (194 KB, pdf)

State Solar Polices States which have notified the State Solar Power Policies (Posted on 25.06.2014) (Updated on 26.06.2015)
100 GW Solar Scale up Plan Scaling up of Grid Connected Solar Power Projects from 20,000 MW by the year 2021-22 to 1,00,000 MW by the year 2021-22 under National Solar Mission. (Posted on 06.07.2015) (126 KB, pdf)      Visibility plan for Status of implementation of various schemes to achieve 1,00,000 MW Solar Plan (As on 31.10.2016) (577 KB, pdf)  Year Wise cumulative target to achieve 1,00,000 MW Grid connected Solar Power Project by the year 2021-22. (Posted on 07.04.2016) (58.1 KB, pdf)
Letter Letter from MNRE to States & CPSUs on WTO compliance  (Posted on 15.01.2018) (735 KB, pdf)  Clarification OM from MNRE on replacement of DCR Modules during PPA tenure (Posted on 15.01.2018) (3.26 MB, pdf) Letter to concerned States regarding availability of spare capacity in existing substation of PGCIL. (Posted on 05.07.2017) (3.11 MB, pdf)

 

Phase - I

 

Off-Grid Solar Systems

Solar Photovoltaic

Formats for submission of Project proposal for SPV systems  under Off Grid Solar Applications:-

 

  1. Mini - Grid SPV Power Plants (Maximum SPV Capacity: 250 kWp each) (112 KB, pdf)
  2. Format for Submitting Project Proposals for installation of Individual SPV Systems (98.5 KB, pdf)
    ( SPV system capacity of each Power Pack/Plant from 100 Wp to 1kWp)
    (Maximum SPV Water Pumping System capacity each  : 5 kWp)
  3. Stand Alone SPV Power Plants (Maximum SPV Capacity: 100 kWp each) (107 KB, pdf)
Formats for submission of project completion document:-
  1. Project completion Report for Solar Power Plants ( 1-100kWp) (50.2 KB, pdf)
  2. Format for Statement of Expenditure (SoE)( 13.9 KB, pdf)
  3. Format for submission of Utilisation Certificate (Updated on 22.06.2016) (14.6 KB, pdf)
  4. Interest earned on release advance CFA (82.4 KB, pdf)
  5. Project completion Report for SPV Lighting System (191 KB, pdf)
  6. Project completion report - SPV Water Pumping System (131 KB, pdf)

 

Solar Thermal