Centrale Electrique à Turbines à Gaz 120 MW
PROJET
Centrale Electrique à Turbines à Gaz BIR MCHERGA
(1 TAG x 120 Mw de type GE frame 9E ))
Client
TURBO-TEC. / GE
Location
Tunisie
Année
1996 - 1998
ETENDUE DES TRAVAUX
- Civil works ( Earth Works, foundations, buildings, roads, turbine house, etc.. )
- Steel Structure detailed design, fabrication and erection.
- Turbines and Equipment Installation
- Storage tanks design, fabrication and erection
- Piping detailed design, fabrication and erection
- Electrical and Instrumentation works.
- Transformer station
- Auxiliary station
- Technical Assistance to commissioning and Start-up