ISS Daily Summary Report – 11/05/2020

Payloads

NRCSD-19 (NanoRacks CubeSat Deployer – Mission 19): The crew took photos of the four NRCSD-19 Deployments. For NRCSD-19, there are eight Deployers preassembled in two Quad Deployers, and a total of seven satellites will be deployed (SpOC, Bobcat-1, NEUTRON-1, LEMUR2 (v4.7), LEMUR2 (v4.8), DESCENT, and SAT-LLA). The NanoRacks CubeSat Deployer is a stackable, modular, ground loaded launch case. Each NanoRacks CubeSat Deployer accommodates up to six launch cases and are stacked for each JEM Airlock opening. 

Food Acceptability: The crew completed the Questionnaire. This investigation seeks to determine the impact of repetitive consumption of food currently available from the spaceflight food system.  Results will be used in developing strategies to improve food system composition to support crew health and performance on long duration missions.

Systems

Lab Carbon Dioxide Removal Assembly (CDRA) Air Selector Valve (ASV) 102 Remove and Replace (R&R): The crew started the R&R of the LAB CDRA ASV 102.  However, the activity was not completed due to schedule constraints. The crew will complete the procedure tomorrow followed by a ground checkout. Node 3 CDRA remains as prime during this time.

Battery Stowage Assembly (BSA) Operation Termination: The crew terminated the Charge-Discharge-Charge (C-D-C) maintenance cycle on all Helmet Lights, PGT Batteries, and two Rechargeable EVA Battery Assemblies (REBA in the BSA and stowed all materials.

Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain/Fill: The crew set up the recycle tank to drain to a ЕДВ-У. Following the setup, the ground performed the tank drain using the Urine Transfer System (UTS). Once the ground specialists completed the transfer, the crew verified the recycle tank was empty, terminated the drain, and repositioned the fill/drain valve to fill.

Completed Task List Activities:

  • None

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • ARS-LAB-RACK-SAFING for CDRA ASV 102 R&R
  • Japanese Experiment Module Remote Manipulator System (JEMRMS) Ground Control CubeSat Deployments
  • UPA Recycle Tank Drain using UTS

Look Ahead Plan

Friday, 11/6 (GMT 311)
Payloads:

  • SERFE Water Sample collect (NASA)
  • EKAM Node 2 setup and act (NASA) 

Systems:

  • Lab CDRA VLV 102 R&R and CLSOUT

Saturday, 11/7 (GMT 312)
Payloads:

  • Crew Off Duty

Systems:

  • Crew Off Duty

Sunday, 11/8 (GMT 313)
Payloads:

  • Crew Off Duty

Systems:

  • Crew Off Duty

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Reminder Portable O2 Monitor (POM) Reading
  • DOUG review
  • In Flight Maintenance (IFM) Carbon Dioxide Removal Assembly (CDRA) Valve Gather
  • Lab Carbon Dioxide Removal Assembly (CDRA) Selector Valve Remove & Replace (R&R) [PARTIALLY DEFFERED]
  • Review EVA Translation Paths and Work Zones using DOUG Application
  • Review EVA Translation Paths and Work Zones through ISS Windows
  • Fan B3 screen cleaning in DC1
  • On-Orbit Hearing Assessment (O-OHA) with EarQ Software Setup and Test
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain
  • On MCC GO: Swapping positions between the ROM units in the central units subsystem monoblock (ПЦБ) of the БИТС2-12 onboard measurement telemetry subsystem in the SM
  • Battery Stowage Assembly (BSA) Operation Termination
  • NanoRacks CubeSat Deployment Photos
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 2
  • Food Acceptability Survey
  • Urine Transfer System Offload EDV Swap
  • Lab Carbon Dioxide Removal Assembly (CDRA) Selector Valve 102 Closeout [DEFFERED]
  • Weekly c/o of RS video recording equipment
  • Fan B3 screen cleaning in MRM2
  • Handover of USOS EVA Tools to RS in preparation for EVA 47
  • Acoustic Monitor Data Transfer and Stow [DEFERRED]
  • On MCC GO: Deinstallation of ПТАБ-2 unit (А304)
  • Air ducts ВД1, ВД2 cleaning in MRM2
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • SM ventilation system cleaning (ВБП1, ВБП2)
  • SSC Client Troubleshooting for SSC 11
  • ПТАБ-2 installation on A304 place
  • МО-6 test equipment preparation
  • СОЖ maintenance, Verification of ИП-1 Flow Sensor Position
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Fill Part 3