Project Updates
May 7 - May 12 |
|
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Sidewalk Restoration
Weekday Work: 7 a.m. – 4 p.m.
- Howell to Pine
- Track construction
- Electrical installations for signals
- Pike intersection
- Electrical installations for signals
- Marion to Jefferson
- Sidewalk restoration at Boylston, Columbia, Cherry, and Minor
Weekend Work: 7 a.m. – 7 p.m.
- Pine intersection
- Electrical installations for signals
What to Expect During Construction This Week:
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closure at Jackson & 10th this Weekend
Weekday Work: 7 a.m. – 4 p.m.
- Broadway – Terrace & Boren
- Electrical installations for signals
- Construct pedestrian island at Boren
- Broadway - Alder to Fir
- Jackson – 10th to 12th
- Saw cutting eastbound roadway
- Sidewalk and curb restoration
Weekend Work: 7 a.m. – 7 p.m.
- Excavation for roadway restoration in eastbound lane between 10th and 12th, remove and replace south leg of 10th and Jackson intersection
What to Expect During Construction This Week
- On-street parking and loading restrictions
- Driveway closures
- Pedestrian and traffic detours
- Construction noise and dust
Traffic Advisories:
- Jackson and 10th– Beginning at 7:00 a.m. May 11, the south leg of this intersection will be closed. It will reopen Monday morning, May 13.
- 12th at Jackson - Beginning at 7:00 a.m. May 18, the southbound lane of 12th will be closed at Jackson. It will reopen Monday morning, May 20.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Track Construction and Sidewalk Restoration
Weekday Work: 7 a.m. – 4 p.m.
- Track construction and electrical installations between 1st and 3rd
- Sidewalk restoration on south side between 5th and 8th
Weekend Work: 7 a.m. – 7 p.m.
- Excavation for track construction between Occidental and 3rd
What to Expect During Construction This Week
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction during the week
- Pedestrian detours
- Construction noise and dust
Past Project Updates
April 30 - May 5
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Between Denny and Howell
Weekday Work: 7:00 a.m. – 4:00 p.m.
- Denny to Pike
- Track construction from Denny to Howell
- Electrical installations for signals at Denny, Olive and Pike intersections
- Madison to Cherry
- Electrical installations for signals and utility pole foundations
- James to Boren
- Electrical installations for signals at Terrace and Boren
What to Expect During Construction This Week:
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk Restoration
Weekday Work 7:00 a.m. – 4:00 p.m.
- Broadway - Fir to Spruce
- Yesler – Broadway to 14th
- Platform construction
- Sidewalk and curb ramp restorations
- Jackson - 8th to 10th
- Sidewalk and curb restoration on south side
Nighttime Work - Thursday Morning
4:00 a.m. – 7:00 a.m.
- Pull steel rail along Jackson from 10th to 2nd
What to Expect During This Week’s Construction:
- On-street parking and loading restrictions
- Pedestrian and traffic detours
- Construction noise and dust
Traffic Advisories:
- Expect closure of south leg of the intersection of 10th and Jackson the weekend of 5/11-5/12
- Expect closure of south leg of the intersection of 12th and Jackson the weekend of 5/18-5/19
JACKSON SEGMENT - CONSTRUCTION DETAIL
Full Intersection Closure at Jackson and 2nd this Weekend
Weekday Work: 7:00 a.m. – 4:00 p.m.
- Construct foundations for utility poles on 8th between Jackson and Dearborn
- Form and pour eastbound curb lane between 7th and 8th
- Sidewalk and curb restoration on south side of Jackson between 6th and 8th
- Track construction, storm system work and utility pole foundation installations between Occidental and 3rd
Weekend & Night Work: Friday 5/3, 7:00 pm – Sunday 5/5, 7:00 pm
- Track excavation and construction between 2nd and 3rd
- Construction of 2nd Ave intersection
Traffic Advisories:
- Jackson and 2nd – Beginning at 7:00 p.m. May 3 this intersection will be closed to traffic for the weekend
- Detour Map
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction during the week
- Pedestrian detours
- Construction noise and dust
April 23 - April 28
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Between Denny and Howell
Weekday Work: 7:00 a.m. – 4:00 p.m.
- Denny to Pine
- Track construction
- Electrical installations for signals
- Install utility poles
- Cherry to Boren
- Electrical work at Terrace/Boren for signals
- Sidewalk restoration at Minor
- Asphalt paving restoration
Weekend Work: 7:00 a.m. – 7:00 p.m.
What to Expect During Construction This Week:
- Odors from asphalt paving
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk and Curb Restoration
Weekday Work 7:00 a.m. – 4:00 p.m.
- Yesler – Broadway to 14th
- Sidewalk restoration
- Platform construction
- Asphalt paving
- 14th – Yesler to Washington
- Jackson – 12th to 14th
- Electrical installation at Metro stop
- Jackson – 9th to 12th
- Sidewalk and curb restoration
What to Expect During This Week’s Construction:
- Odors from asphalt paving
- On-street parking and loading restrictions
- Pedestrian and traffic detours
- Construction noise and dust
JACKSON SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closure at Jackson and 8th this Weekend
Weekday Work: 7:00 a.m. – 4:00 p.m.
Electrical installation at eastbound Metro stop at Maynard
- Construct foundations for utility poles on 8th between Jackson and Dearborn
- Saw cutting and sidewalk and curb restoration on south side of Jackson between 5th and 8th
- Saw cutting, track construction and storm drain installations between Occidental and 3rd
Weekend Work: 7:00 a.m. – 7:00 p.m.
- Excavate the eastbound curb lane between 7th and 8th and the south leg of the intersection of 8th and Jackson, for permanent paving installation.
- Storm drain installation, and excavation for track, between Occidental and 3rd
Traffic Advisories:
- Jackson and 8th – On April 27 – 29 the south leg of this intersection will be closed to traffic
- Jackson and 2nd – Beginning at 7:00 p.m. May 3 this intersection will be closed to traffic for the weekend
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
April 15 - April 21
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Partial Weekend Closure of Broadway/Jefferson Intersection
Weekday Work: 7:00 a.m. – 4:00 p.m.
- Denny to Howell
- Track construction
- Electrical installations for signals
- Madison to Jefferson
- Electrical work for traffic signals at Marion, Cherry, James and Jefferson
- Utility pole foundations
- Install utility poles
- Asphalt roadway removal and replacement
- James to Boren
- Excavation for roadway restoration
- Electrical work at Terrace/Boren
Weekend Work: 7:00 a.m. – 7:00 p.m.
Asphalt roadway removal and replacement
Traffic Advisory:
Broadway and Jefferson – The west leg of this intersection will be closed to traffic the weekend of April 20 - 21
What to Expect During Construction This Week:
- Odors from asphalt paving
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Northbound 14th Ave Closed - Main to Yesler
Weekday Work 7:00 a.m. – 4:00 p.m.
- Broadway –Alder to Yesler
- Sidewalk restoration
- Asphalt road restoration
- Yesler – Broadway to 10th
- Sidewalk restoration
- Platform construction
- Yesler – 12th to 14th
- Asphalt roadway removal and paving
- 14th - Yesler to Main
- Asphalt roadway removal and paving
- Utility pole foundation installations
- Jackson – Rainier to 8th
- Install utility poles
- Saw cutting for road restoration
Traffic Advisory:
14th Avenue S – Main to Yesler –
This street will be closed to both north – and southbound traffic from Monday, April 15 until Saturday, April 20.
What to Expect During This Week’s Construction:
- Odors from asphalt paving
- On-street parking and loading restrictions
- Pedestrian and traffic detours
- Construction noise and dust
JACKSON SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closure at Jackson and 5th this Weekend
Weekday Work: 7:00 a.m. – 4:00 p.m.
- Form and pour eastbound curb lane between Maynard and 7th and the south leg of the Maynard and Jackson intersection
- Sidewalk and curb restoration between 5th and 8th
- Gas line and storm drain installations and saw cutting between Occidental and 3rd
Weekend Work: 7:00 a.m. – 7:00 p.m.
- Shift overhead trolley wires between 5th and 7th
- Gas line and storm drain installations , and excavation for trackway, between Occidental and 3rd
Nighttime Work: Friday and Saturday night 10:00 p.m. – 7:00 a.m.
- Sewer repair between 2nd and Occidental
Traffic Advisories:
- Jackson and Maynard Closure - The south leg of the intersection of S Jackson and Maynard Avenue will be closed to traffic until Saturday April 20
- Jackson and 5th Closure – On April 20 & 21 the north leg of the intersection of Jackson and 5th will be closed to traffic
- Jackson and 8th Closure – On April 27 – 29 the south leg of this intersection will be closed to traffic
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
April 8 - April 14
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction - Denny to Howell, Utility Pole Installations
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Denny to Howell
- Storm drain installation
- Electrical installations for signals
- Howell to Madison
- Madison to Columbia
- Electrical installations at Marion
- Install utility poles
- James intersection
- Electrical installations for signals
Weekend Work: 7:00 a.m. - 7:00 p.m.
- Denny to Howell
- Excavation for track construction
- Electrical installation for signals
Traffic Advisory:
Broadway and Jefferson - This intersection will be partially closed the weekend of April 19-21
What to Expect During Construction This Week:
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekend Closure at 12th and Yesler
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Boren
- Install utility poles
- Electrical installation at Terrace/Boren
- Yesler - Broadway to 10th
- Sidewalk restoration
- Platform construction
Weekend Work: Friday at 7:00 p.m. until Monday at 6:00 a.m.
Traffic Advisories:
12th at Yesler Intersection - Friday, April 12 at 7:00 p.m. until Monday, April 15 at 6:00 a.m. this intersection will be closed to all traffic.
14th Avenue S - Main to Yesler -
This street will be closed to both north - and southbound traffic from Monday, April 15 until Saturday, April 20.
What to Expect During This Week's Construction:
- Nighttime work at 12th and Yesler intersection
- On-street parking and loading restrictions
- Detours
JACKSON SEGMENT - CONSTRUCTION DETAIL
Gas Line Installation and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Form and pour eastbound curb lane between 6th and Maynard and the south leg of the 7th and Jackson intersection
- Sidewalk and curb restoration between 5th and 8th
- Gas line installation and saw cutting for track construction between Occidental and 3rd
- Electrical work on 8th between Jackson and King
Weekend Work: 7:00 a.m. - 7:00 p.m.
- Excavate the eastbound curb lane between Maynard and 7th, and the south leg of the intersection of Maynard and Jackson, for permanent paving installation.
- Gas line installation between 2nd and 3rd
- Manhole installation at 2nd
Traffic Advisories:
- Jackson and Maynard Closure - Beginning Saturday, April 13 the south leg of the intersection of S Jackson and Maynard Avenue will be closed to traffic until Saturday April 20
- Jackson and 5th Closure - On April 20 & 21 the north leg of the intersection of Jackson and 5th will be closed to traffic
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
More information at http://www.seattlestreetcar.org/firsthill.htm
March 26th - 31st
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Utility Installations and Roadway Restoration
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Howell
- Harvard to Madison
- Roadway restoration
- Expect late night construction activity Friday, March 29 at Madison
- Madison to Columbia
- Utility pole foundations
- Electrical installations
Weekend Work:
7:00 a.m. - 7:00 p.m.
Traffic Advisory:
Madison at Broadway - The west leg of this intersection will be closed from Friday, March 29 at 7:00 p.m. until Saturday March 30 at 10:00 p.m.
What to Expect During Construction This Week:
- Odors from asphalt paving from Harvard to Madison on March 30
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekend Closure at Broadway and Boren
Weekday Work 7:00 a.m. - 4:00 p.m.
- Jefferson to Boren
- Roadway restoration
- Expect late night construction activity Friday, March 29 at Boren
- Broadway - Boren to Yesler
- Installation of utility pole foundations
- Yesler - Broadway to 12th
- Roadway and sidewalk restoration
- Platform construction
- Jackson at 10th
Weekend and Nighttime Work: Friday at 7:00 p.m. until Saturday at 10:00 p.m.
Traffic Advisories:
Boren at Broadway - The west leg of this intersection will be closed from Friday, March 29 at 7:00 p.m. until Saturday March 30 at 10:00 a.m.
What to Expect During This Week's Construction:
- Odors from asphalt paving from Jefferson to Boren on March 30
- On-street parking and loading restrictions
- Detours
- Construction noise and dust
- For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Sidewalk restoration and saw cutting between 5th and 7th
- Pavement restoration in eastbound curb lane between 5th and 6th
- Electrical work and street, sidewalk and alley restoration between Occidental and 3rd
Weekend Work:
- Excavate the eastbound curb lane between 6th and Maynard for permanent paving installation
Traffic Advisory:
- Beginning Saturday, March 30th the south leg of the intersection of S Jackson and Maynard Avenue will be closed to traffic until Saturday April 6th.
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
March 19th - 24th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Electric Utility Installations
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Madison to Jefferson
- Electrical installations
- Utility pole foundations
- James intersection
- Remove island on NE corner
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Private utility work at Madison
Traffic Advisory:
Broadway and Madison - Expect a partial intersection closure the weekend of 3/29 - 3/30
What to Expect During Construction This Week:
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekend Closure - Intersection of Yesler and Boren
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Spruce
- Excavation for roadway restoration
- Installation of utility pole foundations
- Yesler - Broadway to 12th
- Track construction
- Roadway and sidewalk restoration
- Platform construction
- Jackson at Rainier
- Excavate for utility pole foundations
Weekend and Nighttime Work: Friday at 7:00 p.m. until Sunday at 7:00 p.m.
- Yesler - Broadway to 12th
Traffic Advisories:
Yesler and Boren intersection - This intersection will be closed this weekend beginning Friday night at 7:00 p.m. and continue until Monday at 6:00 a.m.
Broadway and Boren intersection - Expect the closure of this intersection the weekend of 3/29 - 4/1
What to Expect During This Week's Construction:
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Sidewalk restoration and saw cutting between 5th and 7th
- Pavement restoration in westbound curb lane between 7th and 8th
- Electrical work and street, sidewalk and alley restoration between Occidental and 3rd
Weekend Work:
- Excavate the eastbound curb lane between 5th and 6th for permanent paving installation
Traffic Advisory:
- On Saturday, March 23rd the south leg of the intersection of S Jackson and 6th Avenue will be closed to traffic until Saturday March 30th.
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
March 11th - 17th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Closure of James at Broadway
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Pike
- Madison to Jefferson
- Electrical installations
- Pavement and sidewalk restoration
Weekend Work:
- 7:00 a.m. - 7:00 p.m.
- Asphalt paving Cherry to Jefferson
- Private utility work at Madison
Traffic Advisory:
- James will be closed to through traffic at Broadway from 3/15 at 7:00 p.m. until 3/17 by 7:00 a.m.
What to Expect During Construction This Week:
- Odors from asphalt paving from Cherry to Jefferson on March 16
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Yesler Way Closed from Broadway to Boren
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Terrace
- Yesler - Broadway to Boren
- Sidewalk restoration
- Track construction
Nighttime Work 7:00 p.m. - 6:00 a.m.
- Yesler - Broadway to Boren
- Rail delivery - Thursday morning
- Jackson at 12th
Traffic Advisories:
Yesler from Broadway to Boren -This section of Yesler Way will remain closed to traffic until April 4 to facilitate track construction and pavement restoration. For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
Yesler and Boren intersection - This intersection will experience three weekend closures: March 15-17, 22-24 and 29-31. Closures will begin Friday night at 7:00 p.m. and continue until Monday at 6:00 a.m.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction
- Construction noise and dust
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Construct bicycle ramp from 8th and 9th
- Excavate for utility pole foundations on 8th between Jackson and Dearborn
- Electrical work alley restoration between Occidental and 3rd
Night Work: 7:00 p.m. - 7:00 a.m.
- Sewer relining at 8th and Dearborn
Weekend Work: 7:00 a.m. - 7:00 p.m.
- Pavement removal and restoration in westbound curb lane between Maynard and 8th
- Electrical installation between 2nd and 3rd
Traffic Advisory:
- S Jackson between 2nd and 3rd will have traffic flagged through one lane on 3/9 & 3/10
- The north leg of the intersection of Jackson and 7th will close on March 9th for ten days
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
March 5th - 10th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Howell to Denny
- Madison to Jefferson
- Utility pole foundations
- Sidewalk restoration
- Pavement restoration
Upcoming Work:
- Week of March 11th
- Asphalt paving between tracks Columbia to Cherry
- Pavement restoration from Cherry to Jefferson
Traffic Advisory:
James will be closed to through traffic at Broadway the weekend of 3/15-3/17
What to Expect During Construction This Week:
- Closure of west leg of Broadway and Cherry intersection from 3/7 to 3/11
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Yesler Way Closed from Broadway to Boren
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Terrace
- Yesler - Broadway to Boren
- Sidewalk restoration
- Track construction
Nighttime Work 7:00 p.m. - 6:00 a.m.
- Yesler - Broadway to Boren
- Rail delivery - Thursday morning
- Jackson at 12th
Traffic Advisories:
Yesler from Broadway to Boren -This section of Yesler Way will remain closed to traffic until April 4 to facilitate track construction and pavement restoration.
Yesler and Boren intersection - This intersection will experience three weekend closures: March 15-17, 22-24 and 29-31. Closures will begin Friday night at 7:00 p.m. and continue until Monday at 6:00 a.m.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction
- Construction noise and dust
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Construct bicycle ramp from 8th and 9th
- Excavate for utility pole foundations on 8th between Jackson and Dearborn
- Electrical work alley restoration between Occidental and 3rd
Night Work: 7:00 p.m. - 7:00 a.m.
- Sewer relining at 8th and Dearborn
Weekend Work: 7:00 a.m. - 7:00 p.m.
- Pavement removal and restoration in westbound curb lane between Maynard and 8th
- Electrical installation between 2nd and 3rd
Traffic Advisory:
- S Jackson between 2nd and 3rd will have traffic flagged through one lane on 3/9 & 3/10
- The north leg of the intersection of Jackson and 7th will close on March 9th for ten days
What to Expect During Construction:
- Short-term driveway restrictions
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
Feb 25th - March 3rd
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Utility Pole Foundations, Pavement Restoration
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Pike intersection
- Madison to Cherry
- Utility pole foundations
- Pavement restoration
What to Expect During Construction This Week:
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
Upcoming Work:
- Week of March 4th
- Pavement removal and restoration between streetcar tracks from Columbia to Cherry
- Closure of west leg of Broadway and Cherry intersection from 3/7 to 3/11
- Utility pole foundations from Cherry to Jefferson
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Utility Pole Foundations
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Terrace
- Broadway - Boren to Yesler
- Sidewalk and pavement restoration
- Yesler - Broadway to Boren
- Jackson - 8th to 12th
- Curb and pavement restoration
Nighttime Work 10:00 p.m. - 4:00 a.m.
- Yesler - Broadway to Boren
- Rail delivery - Tuesday night
Saturday Work 7:00 a.m. - 7:00 p.m.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction
- Construction noise and dust
Traffic Advisories:
Broadway and Yesler intersection - This intersection will remain closed to traffic until February 28.. For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
Yesler from Broadway to Boren - On March 4 this area will be closed to traffic for four weeks to facilitate track construction.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Pavement removal and restoration in westbound curb lane between 5th and Maynard
- Saw cutting roadway from Maynard to 8th
- Excavating for utility pole foundations on 8th between Jackson and Dearborn
- Electrical work and storm drain installation between Occidental and 3rd
Weekend Work: 7:00 a.m. - 7:00 p.m.
- Electrical work between Occidental and 3rd
Traffic Advisory:
- The north leg of the intersection of Jackson and Maynard will reopen on March 4th
- The north leg of the intersection of Jackson and 7th will close on March 9th for seven days
.
What to Expect During
Construction:
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
Feb 20th - 24th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Utility Pole Foundations, Pavement Restoration
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Pike to Union
- Curb ramp restoration
- Pavement restoration
- Union to Madison
- Madison to Cherry
- Utility pole foundations
- Pavement restoration
Weekend Work:
7:00 a.m. - 7:00 p.m.
Traffic Advisory:
This Saturday, February 23 the west leg of the Broadway and Union intersection will be closed from 5:00 a.m. until 7:00 p.m. for pavement restoration.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Utility Pole Foundations
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Boren to Yesler
- Pavement restoration
- Track construction
- Yesler - Broadway to 10th
- Jackson - 8th to 14th
- Rail welding
- Utility pole foundations
Weekend Work 7:00 a.m. - 7:00 p.m.
- Jackson - 12th to 14th
- Storm drain installation
- Pavement restoration
Traffic Advisories:
Broadway and Yesler intersection - This intersection will remain closed to traffic until February 28.. For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
Yesler from Broadway to Boren - On March 4 this area will be closed to traffic for four weeks to facilitate track construction.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Rail welding 8th to 10th
- Saw cutting and pavement restoration in westbound curb lane between 5th and 8th
- Electrical work and storm drain installation between Occidental and 3rd
Nighttime Work: 7:00 p.m. - 7:00 a.m.
- Sewer line restoration - Tuesday
Weekend Work: 7:00 a.m. - 7:00 p.m.
- Pavement restoration in westbound curb lane between 6th and Maynard
- Electrical work and storm drain installation between Occidental and 3rd
Traffic Advisory:
- The north leg of the intersection of Jackson and 6th will reopen on 2/23
- The north leg of the intersection of Jackson and Maynard will close on 2/23 for ten days.
Feb 12th - Feb 17th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Drilling Foundations for Utility Poles
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Pike
- Utility inspections
- Utility pole foundations
- Madison to Jefferson
- Storm drain work
- Utility pole foundations
- Driveway restorations
Traffic Advisory:
In late-February there will be a short-term partial closure of the Broadway and Union intersection for pavement restoration
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Water Main Work
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Boren to Yesler
- Track construction
- Pavement restoration
- Yesler - Broadway to 13th
- Concrete saw cutting
- Water main installation
- Pavement restoration
- Utility pole foundations
- 14th - Main to Jackson
- Jackson - 8th to 14th
- Rail welding
- Utility pole foundations
- Sidewalk restoration
Nighttime Work 9:00 p.m. - 6:00 a.m.
- Jackson -8th to 14th
- Jackson at 12th - Saturday night
Weekend Work 7:00 a.m. - 7:00 p.m.
- Yesler at 12th
- Jackson - 12th to 14th
- Water line installation
- Storm drain installation
Traffic Advisories
- Broadway and Yesler intersection - This intersection will remain closed to traffic until February 28. . For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
- 12th and Jackson Intersection - This intersection will have lane and turn restrictions from 7:00 a.m. Saturday, February 16 until 7:00 p.m. Sunday, February 17th for water main installation.
- Yesler from Broadway to Boren - On March 4th this area will be closed to traffic for four weeks to facilitate track construction.
Note Regarding Water Main Installation:
On Saturday night, February 16 there will be water service interruptions on 12th between Main and Weller as new connections are made. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction except where noted
- Construction noise, dust and increased truck activity
- The dates of this work are subject to change due to weather
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Rail welding 8th to 10th
- Saw cutting 5th to 8th
- Electrical work, pavement restoration and storm drain installations between Occidental and 3rd
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Roadway restoration north side of 5th to 6th
Traffic Advisory:
12th and Jackson Intersection - This intersection will have lane and turn restrictions from 7:00 a.m. Saturday, February 16th until 7:00 p.m. Sunday, February 17th for water main installation.
Feb 5th - Feb 10th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Pavement Restoration
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Howell to Pine
- Utility pole foundations
- Electrical installations
- Union to Columbia
- Madison to Marion
Traffic Advisory:
In late-February there will be a short-term partial closure of the Broadway and Union intersection
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main Work
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Boren to Yesler
- Yesler at Broadway
- Foundations for utility poles
- Jackson - 8th to 14th
- Pavement restoration
- Storm drain and water main work
Nighttime Work 9:00 p.m. - 6:00 a.m.
- 14th and Yesler - Monday
- Broadway Spruce to Yesler - Friday
- Jackson between 8th and 9th - Saturday
- Jackson between 12th and 14th - Sunday
Weekend Work - 7:00 a.m. to 7:00 p.m.
- Broadway and Yesler Intersection
- Track and roadway construction
Traffic Advisories
- Broadway & Yesler Intersection - On February 9th this intersection will be closed to traffic 24-hours per day for three weeks to facilitate track construction.
- Yesler from Broadway to Boren - On March 4th this area will be closed to traffic for four weeks to facilitate track construction
- Rail Delivery - Beginning the evening of February 9th streetcar rail will be delivered, welded and stored in the center lane of Jackson between 8th and 10th.
- 12th and Jackson Intersection - This intersection will be closed to traffic from 7:00 a.m. Saturday, February 16 until 7:00 a.m. Sunday, February 17 for water main installation.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction except where noted
- Construction noise, dust and increased truck activity
- The dates of this work are subject to change due to weather
Note Regarding Water Main Installation:
In mid-February there will be water service interruptions on 12th between Main and Weller as new connections are made. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Electrical work, pavement restoration and storm drain installations between Occidental and 3rd
- Pavement restoration between 5th and 8th
Night Work: 7:00 p.m. - 7:00 a.m.
- Electrical work at 2nd - Nightly
- Sewer restoration at Dearborn and 8th - Tuesday
- Rail delivery between 8th and 10th - Saturday
- Sewer restoration Occidental to 2nd - Saturday
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Electrical work and pavement restoration between Occidental and 3rd
Traffic Advisory:
12th and Jackson Intersection - This intersection will be closed to traffic from 7:00 a.m. Saturday, February 16 until 7:00 a.m. Sunday, February 17 for water main installation.
View Older Updates
January 29th - Feb 3rd
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Pavement Restoration
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Columbia
- Electrical installations
- Foundations for utility poles
- Madison to Columbia
Traffic Advisory:
In mid-February there will be a short-term partial closure of the Broadway and Union intersection
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Full Closure of Jackson & 12th Intersection This Weekend
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Boren to Yesler
- Yesler - Broadway to 14th
- Foundations for utility poles
- Jackson - 8th to 14th
- Pavement restoration
- Water main and storm drain installations
Nighttime Work 7:00 p.m. - 6:00 a.m.
- Yesler - Broadway to 16th
- 15th and 16th - Yesler to Washington
Weekend Work - 7:00 a.m. to 7:00 p.m.
- Jackson - 8th to 14th
- Water main and storm drain installations
- Pavement restoration (Saturday night 7pm - 7am)
Traffic Advisories
- Saturday and Sunday 2/2-2/3 and 2/16-2/17
7:00 a.m. - 7:00 p.m.
The intersection of Jackson and 12th will be fully closed to traffic. Local access to businesses and residences will be maintained and drivers and pedestrians will be assisted by uniformed police officers and flaggers.
- February 9th - The intersection of Broadway and Yesler will be closed for three weeks for track construction.
- Rail Delivery - Beginning the evening of February 9th streetcar rail will be delivered, welded and stored in the center lane of Jackson between 8th and 10th.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction except where noted
- Construction noise, dust and increased truck activity
- The dates of this work are subject to change due to weather
Note Regarding Water Main Installation:
In February there will be water service interruptions on 12th between Main and Weller as new connections are made. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Electrical work between Occidental and 3rd
- Pavement restoration between 1st and 2nd and between 6th and Maynard
Nighttime Work: Saturday 7:00 p.m. - 5:00 a.m.
- Pavement restoration between 8th and 10th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Electrical work between Occidental and 3rd
Traffic Advisories:
Jackson and 2nd - The south leg of the intersection of will re-open by the end of the week.
Saturday and Sunday 2/2-2/3 and 2/16-2/17 7:00 a.m. - 7:00 p.m. - The intersection of Jackson and 12th will be fully closed to traffic. Local access to businesses and residences will be maintained and drivers will be assisted by uniformed police officers and flaggers.
January 23rd - 27th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Sewer and Electrical Work
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Pine
- Pine to Madison
- Madison to Boylston
- Trackway construction
- Curb and sidewalk restoration
- Removal of island at Broadway and Boylston
- Columbia intersection
Nighttime Work:
7:00 p.m. - 7:00 a.m.
- Union to Madison
- Sewer line restoration 1/25
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
For the Next Two Weekends - Full Closure of Jackson & 12th Intersection
Weekday Work 7:00 a.m. - 4:00 p.m.
- Boren at Terrace
- Broadway - Spruce to Yesler
- Broadway and Yesler intersection
- Electrical conduit installation
- Yesler - Broadway to 12th
- Water main and electrical work
- Jackson - 8th to 14th
- Pavement restoration
- Water main and storm drain installations
- Electrical installation
Nighttime Work 7:00 p.m. - 6:00 a.m.
- Broadway - Boren to Spruce
- Sewer line restoration 1/22 and 1/23
- Yesler at 10th
- Sewer line restoration 1/24
- Jackson at 14th
- Water main installation 1/22
- Jackson at 12th
Weekend Work -24 Hour/Round-the-clock Work
- Jackson - 8th to 14th
- Pavement restoration
- Water main and storm drain installations
- Sewer line restoration
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction
- Construction noise, dust and increased truck activity
- The dates of this work is subject to change due to weather
Note Regarding Water Main Installation:
This month there will be water service interruptions as new connections are made along Jackson east of 12th and on 12th between Main and Weller. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
Traffic Advisories
- Friday night 9:00 p.m. - 6:00 a.m. - Jackson will have one travel lane in each direction.
- Saturday and Sunday 1/26 -1/27 and 2/2-2/3 7:00 a.m. - 7:00 p.m. - The intersection of Jackson and 12th will be fully closed to traffic. Local access to businesses and residences will be maintained and drivers will be assisted by uniformed police officers and flaggers.
- Saturday and Sunday night 7:00 p.m. - 7:00 a.m. Jackson will have one travel lane in each direction.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration
Weekday Work: 7:00 a.m. - 4:00 p.m.
- Electrical work between Occidental and 3rd
- Pavement restoration between 1st and 2nd and between 5th and 7th
Nighttime Work: 7:00 p.m. - 5:00 a.m.
- Electrical work between Occidental and 3rd
- Bridge seismic retrofit 1/22 - 1/31
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Electrical work between Occidental and 3rd
- Pavement restoration between 1st and 2nd and between 5th and 7th
Traffic Advisory:
- Saturday and Sunday 1/26 -1/27 and 2/2-2/3 7:00 a.m. - 7:00 p.m. - The intersection of Jackson and 12th will be fully closed to traffic. Local access to businesses and residences will be maintained and drivers will be assisted by uniformed police officers and flaggers.
January 15th - 21st
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Madison to Boylston
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Pine
- Madison to Boylston
- Trackway construction
- Sidewalk restoration
- Removal of island at Broadway and Boylston
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Trackway Construction, Water Main and Storm Drain Installation
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Terrace
- Boren at Terrace
- Broadway - Spruce to Yesler
- Broadway and Yesler intersection
- Electrical conduit installation
- Yesler - Broadway to 12th
- Jackson - 8th to 14th
- Pavement restoration
- Water main and storm drain installations
- Electrical installation
Nighttime Work 7:00 p.m. - 6:00 a.m.
Weekend Work 7:00 a.m. - 7:00 p.m.
- Jackson - 8th to 14th
- Pavement restoration
- Water main and storm drain installations
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- Two-way traffic will be maintained through one lane via the use of flaggers at Jackson & 10th during the weekend and at the Broadway & Yesler intersection on weekdays
- Construction noise, dust and increased truck activity
Note Regarding Water Main Installation:
This month there will be water service interruptions as new connections are made along Jackson east of 12th and on 12th between Main and Weller. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Storm Drain and Electrical Installations
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Utility pole foundations between 3rd and 7th
- Electrical work between Occidental and 3rd
- Water main and hydrant work between 5th and 7th
- Pavement restoration between 5th and 7th
- Storm drain work at 7th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Pavement restoration at 5th
- Center island removal at 8th
Traffic Advisory:
The south leg of the intersection of Jackson and 2nd is closed until 1/18 for the replacement of an electric utility vault.
January 7th - 13th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Madison to Cherry
Weekday Work:
7:00 a.m. - 4:00 p.m.
Evening and Weekend Work:
From Friday at 4:00 p.m. until Sunday at 7:00 p.m. there may be continuous work in this area
- Columbia intersection
- Track construction
- Driveway and sidewalk removal and replacement
Traffic Advisories:
- The main driveway entrance to Swedish Hospital on Broadway at Columbia will be closed from 4:00 p.m. Friday, January 11th through 8:00 a.m. Monday, January 14th. Hospital visitors will be directed to an alternate entrance off Marion.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Trackway Construction and Water Main Installation
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Terrace
- Curb and gutter replacement
- Trackway construction
- Broadway - Spruce to Yesler
- Saw cutting prior to track excavation
- Electrical conduit installation
- Jackson - 8th - 14th
- Pavement restoration
- Saw cutting prior to track excavation
- Water main installation
- Electrical installations
- Utility pole foundation construction
Weekend Work 7:00 a.m. - 7:00 p.m.
- Jackson - 8th - 10th
- Pavement restoration
- Storm drain installation
- Note Regarding Water Main Installation:
- Beginning in January there will be water service interruptions as new connections are made along Jackson east of 12th. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Storm Drain and Electrical Installations
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Storm drain installations between Occidental and 2nd
- Electrical work between 3rd and 2nd Ave Extension and at 6th
- Water main and hydrant work between 5th and 7th
- Pavement restoration between 6th and 7th
- Utility pole foundations between Maynard and 7th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Pavement restoration between 5th and 7th
- Storm drain installations at Occidental
Traffic Advisory:
The south leg of the intersection of Jackson and 2nd will be closed between 1/8 and 1/18 for the replacement of an electric utility vault.
December 18th - December 21st
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Madison to Cherry
This Week: December 17th - 21st
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Holiday clean-up
- Madison to Cherry
December 22nd - 28th
No streetcar work scheduled in this area
December 29th- 30th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Madison intersection
- Storm drain and water main work
December 31st - January 6th
Weekday Work:
7:00 a.m. - 4:00 p.m.
Traffic Advisories:
- There will be a one-day closure of the west leg of the Broadway and Cherry intersection on 12/18. It will be closed again between 1/3 and 1/10.
- There will be a partial closure of the Broadway/Madison intersection the weekend of 12/29, 12/30.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Trackway Construction and Water Main Installation
This Week: December 17th - December 21st
Weekday Work
7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Yesler
- Trackway construction
- Storm drain installation
- Yesler - Broadway to 10th
- Water main and hydrant installation
- 14th - Yesler to Jackson
- Construct utility pole foundations
- Jackson - 10th - 14th
- Water main and hydrant installation
- Electrical installations
- Storm drain installation
- Holiday clean-up
December 22nd - 25th
- No streetcar work scheduled in this area
December 26th - 30th
Weekday Work
7:00 a.m. - 4:00 p.m.
- Yesler - Broadway to 10th
- Pavement restoration
- Water main installation
- Jackson - 10th to 14th
- Water main and hydrant installation
- Storm drain installation
Weekend Work
7:00 a.m. - 7:00 p.m.
- Broadway - 10th to 14th
- Storm drain installation
- Pavement restoration
Note Regarding Water Main Installation:
Beginning in January there will be water service interruptions as new connections are made along Jackson east of 12th. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Storm Drain Installation Work Begins on 8th Avenue
This Week: December 17th - 23rd
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Electrical installations at 6th, Maynard, 8th and 9th
- Storm drain installations at 7th
- Storm drain installations on 8th between Lane and Dearborn
- Holiday clean-up
December 24th - 30th
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Storm drain installations at 8th
- Storm drain installations on 8th between King and Dearborn
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Storm drain installations at 7th and 8th
December 31st - January 6th
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Electrical installations between 5th and 8th
- Storm drain installations at 8th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Storm drain installations at 8th
December 11th - December 16th
Broadway & Madison Detour Route
click to view larger
|
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closures at Madison
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Howell
- Madison to Boren
- Trackway construction
- Saw cutting roadway
Friday Night Work:
7:00 p.m. - 7:00 a.m.
- Madison intersection
- Trackway construction
- Expect late night and early morning construction noise and activity on 12/14
Weekend Work:
Saturday 7:00 a.m. - 10:00 p.m.
Sunday 7:00 a.m. - 5:00 p.m.
Traffic Advisories:
- There will be closures at the Broadway and Madison intersection from Friday night at 7:00 p.m. until Sunday evening at 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Nighttime Work at Broadway and Yesler 12/12 - 12/13
Weekday Work
7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Fir
- Trackway construction
- Saw cutting roadway
- Yesler - Broadway to 10th
- 14th - Yesler to Main
- Construct utility pole foundations
- Sewer inspection and cleaning
- Jackson - 10th - 14th
- Water main installation
- Electrical installations
- Saw cutting roadway
Weeknight Work
7:00 p.m. - 7:00 a.m.
- Broadway and Yesler intersection
- Water main installation
- Expect late night and early morning construction noise and activity on 12/12 & 12/13
Weekend Work
7:00 a.m. - 7:00 p.m.
- Jackson and Rainier intersection
- Street restoration
- Sewer inspection and cleaning
JACKSON SEGMENT - CONSTRUCTION DETAIL
Storm Drain Installation Work Begins on 8th Avenue
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Electrical installations between 2nd Extension and 3rd
- Electrical installations between 6th and 7th
- Water main installations between 7th and 12th
- Storm drain installations on 8th between Weller and Dearborn
Tuesday Early Morning Work:
2:00 a.m. - 9:00 a.m.
- Water main installations at 8th
- Expect early morning construction noise and activity on 12/11
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Storm drain installations between 7th and 8th
- Water main installations between 10th and 12th
December 4th - December 9th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closures at Madison
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Howell
- Madison to Columbia
- Cherry to James
- Curb and gutter construction
- James to Boren
Weekend Work:
7:00 a.m. - 12:00 a.m.
- Denny to Howell
- Madison intersection
- Trackway construction
- Expect late night and early morning construction noise and activity on 12/8
Traffic Advisories:
- Madison will be closed to through traffic at Broadway on Saturday from 7:00 a.m. to 12:00 a.m. and Sunday, from 7:00 a.m. until 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Nighttime Closures of Boren at Broadway 12/5 - 12/9
Weekday Work 7:00 a.m. - 4:00 p.m.
- Broadway - Jefferson to Spruce
- Yesler - Broadway to 10th
- Jackson - 10th - 12th
- Water main installation
- Electrical installations
Weeknight Work 7:00 p.m. - 7:00 a.m.
- Broadway at Boren
- Trackway construction
- Expect late night and early morning construction noise and activity 12/5 & 12/6
Weekend Work
Friday 7:00 p.m. - Sunday 7:00 p.m.
- Broadway at Boren
- Trackway construction
- Expect late night and early morning construction noise and activity 12/7 & 12/8
- Jackson and Rainier intersection
Traffic Advisories:
- Boren will be closed to through traffic at Broadway 12/5 & 12/6 from 7:00 p.m. until 5:00 a.m.
- The Broadway/Boren intersection will be closed to all through traffic with the exception of northbound Broadway from 12/7 at 7:00 p.m. until 12/8 at 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Installations
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Electrical installations at 6th and at Maynard
- Water main installations between 7th and 12th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Water main installations between 7th and 12th
Upcoming Work on 8th Avenue:
- Beginning the week of December 10th 2-3 weeks of storm drain installation work will commence on 8th between King and Dearborn. This work will require some street closures and detours. For more information call the Project Hotline at (206) 257-2121
November 27th - December 2nd
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Howell
- Howell and Nagle
- Electrical substation construction
- Pike - NW Corner
- Columbia to Cherry
- Cherry to Boren
Weekend Work:
*7:00 a.m. - 7:00 p.m.
- Denny to Howell
- Madison intersection
- Water main work
- *Expect late night and early morning construction noise and activity the evening of 12/1
- Jefferson intersection
- Track construction
- *Expect late night and early morning construction noise and activity the evening of 11/30
Traffic Advisories:
- Jefferson will be closed to through traffic at Broadway, and southbound Broadway will be closed at James, from Friday, 11/30 at 7:00 p.m. until Monday, 12/3 at 5:00 a.m.
- The Broadway/Madison intersection will be closed to traffic from Saturday, 12/1 at 3:00 p.m. until Sunday, 12/2 at 10:00 a.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekday Work:
7:00 a.m. - 7:00 p.m.
- Terrace intersection
- Broadway - Jefferson to Boren
- Yesler - Broadway to Boren
- Jackson - 8th - 12th
Weeknight Work:
7:00 p.m. - 6:00 a.m.
- Yesler - 10th to Boren on 11/28
- Water main installation - Expect late night and early morning construction noise and activity
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Jackson - 8th - 10th
- Jackson and Rainier intersection
JACKSON SEGMENT - CONSTRUCTION DETAIL
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Street restoration between 5th and 8th
- Electrical installations between 5th and Maynard
- Storm drain installation between 7th and 8th
- Water main installations between 8th and 10th
Weekend Work:
7:00 a.m. - 7:00 p.m.
- Water main installations between 8th and 10th
November 20th - November 28th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Holiday Schedule - No Work Scheduled Thursday - Sunday
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Howell and Nagle
- Electrical substation construction
- Street restoration
- Columbia to Cherry
- James to Jefferson
- All site general cleanup
Weekend Work:
7:00 a.m. -7:00 p.m.
- Denny to Howell
- Madison intersection
- Water main and storm drain work
- James intersection (7:00 p.m. Friday through 5:00 a.m. Monday)
Holiday Work Schedule:
- In observance of Thanksgiving Day there will be no work on the Streetcar Project from Thursday, November 22nd through Sunday, November 25th
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Holiday Schedule - No Work Scheduled Thursday - Sunday
Weekday Work:
- Broadway - Jefferson to Boren
- Saw cutting roadway prior to excavation of trackway
- Jackson - 12th - 14th
- Ground preparation for future utility pole installation
- All site general cleanup
Work Hours:
- Weekdays 7:00 a.m. - 7:00 p.m.
Holiday Work Schedule:
- In observance of Thanksgiving Day there will be no work on the Streetcar Project from Thursday, November 22nd through Sunday, November 25th
JACKSON SEGMENT - CONSTRUCTION DETAIL
Late Night Construction - Monday and Tuesday Night
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Water main installations on Jackson at 6th and 7th
- Street restoration between 5th and 8th
- All site general cleanup
Weeknight Work:
6:00 p.m. - 5:00 a.m.
- Monday night - water main installation at 7th
- Tuesday night - water main installation at 6th
- There will be increased construction noise late at night and early in the morning associated with these activities
Holiday Work Schedule:
- In observance of Thanksgiving Day there will be no work on the Streetcar Project from Thursday, November 22nd through Sunday, November 25th
November 12th - November 18th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closures at Madison and James
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Denny to Howell
- Howell and Nagle
- Electrical substation construction
- Madison to Jefferson
Weekend Work:
7:00 a.m. -7:00 p.m.
- Denny to Howell
- Madison intersection
- Water main and storm drain work
- James intersection (7:00 p.m. Friday through 5:00 a.m. Monday)
Traffic Advisory:
- This weekend James Street will be closed to through traffic at Broadway (Friday, 11/16 7:00 p.m. - Monday, 11/19 5:00 a.m.)
- On Saturday and Sunday there will be a partial closure of the Broadway/Madison intersection. Detours will be posted.
What to Expect During Construction This Week:
- Late Friday night and early Saturday morning there will be increased construction noise at the intersection of Broadway and James associated with track construction
- On street parking and loading restrictions
- One travel lane in each direction and turn restrictions on Broadway
- Pedestrian detours
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain and Electrical Conduit Installations
Weekday Work:
- Broadway at Boren
- Yesler - Broadway to Boren
- Yesler - Boren to 12th
- Street light conduit installation
- 14th - Washington to Main
- Train signal conduit installation
- Jackson - 8th to 12th
- Water main installation
- Street restoration
Weekend Work
Work Hours:
- Weekdays 7:00 a.m. - 7:00 p.m.
- Weekends 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main & Storm Drain Installations
Weekday Work:
- Water main installation on Jackson 7th to 8th
- Street restoration on 8th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
What to Expect During Construction:
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
Note on Water Main Shutdowns:
The next water main shutdowns in the Chinatown/International District are scheduled for the nights of 11/19 and 11/20. These service interruptions will impact fewer businesses and residents than previous ones. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
November 5th - November 11th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closures at Madison and Jefferson
Weekday Work:
- Howell and Nagle
- Electrical substation construction
- Madison to Boren
Weekend Work:
- Madison intersection
- Water main and storm drain work
- Jefferson intersection
Work Hours:
- Weekdays 7:00 a.m. -4:00 p.m.
- Weekends 7:00 a.m. -7:00 p.m.
Traffic Advisory:
- This weekend Jefferson Street will be closed to through traffic at Broadway (Saturday, 11/10 7:00 a.m. - 7:00 p.m.)
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main & Storm Drain Installations
Weekday Work:
- Broadway - Jefferson to Boren
- Broadway at Boren
- Yesler - Broadway to Boren
- Yesler - Boren to 12th
- Street light conduit installation
- 14th - Main to Jackson
- Street light conduit installation
- Jackson - 8th to 14th
- Water main installation
- Street restoration
Weekend Work
Work Hours:
- Weekdays 7:00 a.m. - 7:00 p.m.
- Weekends 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main & Storm Drain Installations
Weekday Work:
- Water installation at 6th, 7th and 8th
Weekend Work:
- Water installation between 7th and 8th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekends 7:00 a.m. - 7:00 p.m.
What to Expect During Construction:
- On-street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise and dust
Note on Water Main Shutdowns:
The next water main shutdowns in the Chinatown/International District are tentatively scheduled for the nights of 11/19 and 11/20. These service interruptions will impact fewer businesses and residents than previous ones. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
October 30th -Nov 6th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closure at Broadway and Madison
Weekday Work:
- Howell and Nagle
- Electrical duct bank installation
- Pike to Madison
- Madison to Columbia
- Trackway construction
- Steam vault modification
- Cherry to Jefferson
Weekend Work:
- Madison intersection
- Water main and storm drain work
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekends 7:00 a.m. - 7:00 p.m.
Traffic Advisory:
- There will be a full intersection closure this weekend at Broadway/Madison. See detour map above.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main & Storm Drain Installations, Prepare for Utility Pole Foundations
Weekday Work:
- Broadway at Boren
- Yesler - Broadway to Boren
- Yesler - Boren to 14th
- 14th - Main to Jackson
- Jackson - 10th to 14th
- Water main installation
- Street restoration
Weekend Work
- Broadway at Boren
- Jackson at Rainier
Work Hours:
- Weekdays 7:00 a.m. - 7:00 p.m.
- Weekends 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main & Electrical Duct Bank Installations
Weekday Work:
- Cleanup of electrical duct bank work between 1st and 2nd
- Storm drain installation between Occidental and 2nd
Weekend Work:
- Storm drain installation between Occidental and 2nd
- Water installation at 6th and at 7th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekends 7:00 a.m. - 7:00 p.m.
Note on Water Main Shutdowns:
Last weekend, October 27th - 28th, there was a water main shutdown in the Chinatown/International District. Unfortunately, water service was down for as long as 22 hours in some areas. This was an unanticipated and unfortunate occurrence. The next shutdown is tentatively scheduled for the week of November 12th. This service interruption will impact fewer businesses and residents than previous ones. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
October 23rd -28th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closures at Broadway and Madison
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Howell and Nagle
- Electrical duct bank installation
- Howell to Pine
- Utility pole ground preparation
- Pike to Union
- Union to Madison
- Madison intersection
- Columbia intersection
- Madison to Cherry
- Cherry intersection
- Cherry to Jefferson
Weekend Work:
- Madison intersection
- Water main and storm drain work
- Pike intersection
Traffic Advisory:
- There will be a full intersection closure this weekend at Broadway/Madison. See detour map above
- This weekend Pike Street will be closed to through traffic at Broadway (Friday, Oct 26th 6:00 p.m. until Sunday, Oct 28th 6:00 p.m.)
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main & Storm Drain Installations
Weekday Work:
- Broadway at Boren
- Broadway at Fir
- Yesler - Broadway to Boren
- Yesler at 12th
- Street light installation
- Jackson - 8th to 14th
- Water main installation
- Street restoration
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main & Electrical Duct Bank Installations
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
Weekend Work:
- Water main installation between 6th and 7th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend - Saturday from 7:00 a.m. until Sunday at 6:00 p.m.
Note on Water Main Shutoffs:
- On October 27th - 28th there will be the second of three area-wide water main shutoffs in the Chinatown/International District. The shutoffs begin at 10:00 p.m. on Saturdays and continue until 10:00 a.m. on Sundays. The next water shutoff is tentatively scheduled for the weekend of November 3rd. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closure at Broadway and Madison, Weekend Closure at James
Weekday Work:
7:00 a.m. - 4:00 p.m.
- Howell and Nagle
- Electrical duct bank installation
- Pike to Madison
- Columbia intersection
- Steam vault modifications
- James and Jefferson intersections
- Cherry intersection
- Cherry to Jefferson
Weekend Work:
- Madison intersection
- James intersection
Traffic Advisory:
- The east leg of the Broadway/Madison intersection will be closed this weekend (7:00 a.m. - 7:00 p.m.)
- This weekend, October 19th - 22nd, James Street will be closed to through traffic at Broadway (Friday, 6:00 p.m. - Monday, 5:00 a.m.)
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main & Storm Drain Installations
Weekday Work:
- Broadway at Boren
- Broadway at Fir
- Yesler - Broadway to Boren
- Jackson - 12th to 14th
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main & Electrical Duct Bank Installations
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Water main installation and service transfers between 6th and 7th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
Note on Water Main Shutoffs:
The first of three area-wide water shutoffs in the Chinatown/International District was completed the weekend of October 6-7. The remaining shutoffs will begin at 10:00 p.m. on Saturdays and continue until 10:00 a.m. on Sundays and are tentatively scheduled for the weekends of October 27-28 and November 3-4. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
October 8th -14th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Night and Weekend Intersection Closures at Broadway and Madison
Weekday Work:
- Denny to Howell
- Pine to Madison
- Columbia intersection
- Steam vault modifications
- Pavement restoration
- Cherry intersection
- Traffic signal controls installation
- Jefferson intersection
Weeknight Work:
- Madison intersection
- Weller to Pike
Weekend Work:
Traffic Advisory:
- The intersection of Broadway and Madison will be closed on weekends until November 4th.
- Broadway will be closed between Madison and Marion from 8:00 p.m. to 6:00 a.m. for up to two weeks beginning October 1st. There will be a signed detour
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weeknights 8:00 p.m. - 6:00 a.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main, Sewer & Electrical Installations
Weekday Work:
- Broadway at Alder
- Electrical duct bank installation
- Yesler - Broadway to Boren
- Yesler at 12th
- Sewer installation
- Yesler at 14th
- Traffic signal work
- Jackson - 8th to 10th
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Water main installation between 6th and 7th
- Water main installation between 8th and 10th
Weekend Work:
- Electrical duct bank and vault installation between 1st and 2nd
- Water main installation between 5th and 6th
- Storm drain installation at 8th Avenue intersection
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note on Water Main Shutoffs:
October 6th - 7th will begin the first of three weekend water shutoffs in October for the Chinatown/International District. The shutoffs will begin at 10:00 p.m. on Saturdays and continue until 10:00 a.m. on Sundays. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
October 1st -7th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Night and Weekend Intersection Closures at Broadway and Madison
Weekday Work:
- Denny to Howell
- Pine to Madison
- Columbia intersection
- Steam vault modifications
- Pavement restoration
- Cherry intersection
- Traffic signal controls installation
- Jefferson intersection
Weeknight Work:
- Madison intersection
- Weller to Pike
Weekend Work:
Traffic Advisory:
- The intersection of Broadway and Madison will be closed on weekends until November 4th.
- Broadway will be closed between Madison and Marion from 8:00 p.m. to 6:00 a.m. for up to two weeks beginning October 1st. There will be a signed detour
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weeknights 8:00 p.m. - 6:00 a.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main, Sewer & Electrical Installations
Weekday Work:
- Broadway at Alder
- Electrical duct bank installation
- Yesler - Broadway to Boren
- Yesler at 12th
- Sewer installation
- Yesler at 14th
- Traffic signal work
- Jackson - 8th to 10th
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Water main installation between 6th and 7th
- Water main installation between 8th and 10th
Weekend Work:
- Electrical duct bank and vault installation between 1st and 2nd
- Water main installation between 5th and 6th
- Storm drain installation at 8th Avenue intersection
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note on Water Main Shutoffs:
October 6th - 7th will begin the first of three weekend water shutoffs in October for the Chinatown/International District. The shutoffs will begin at 10:00 p.m. on Saturdays and continue until 10:00 a.m. on Sundays. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
September 24th - 30th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Intersection Closure at Broadway and Union
Weekday Work:
- Denny to Howell
- Pine to Madison
- Madison to Columbia
- Storm drain and electrical duct bank installation
- Jefferson intersection
- Electrical duct bank installation
Weeknight Work:
Weekend Work:
Traffic Advisory:
- The intersection of Broadway and Union will be closed, with the exception of one northbound lane, the weekend of September 29th and 30th.
- Broadway will be closed between Madison and Marion from 8:00 p.m. to 6:00 a.m. for up to two weeks beginning September 27th. There will be a signed detour.
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weeknights 8:00 p.m. - 6:00 a.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Traffic Delays This Week on Yesler at 10th
Weekday Work:
- Yesler - Broadway to Boren
- Yesler - 12th to 14th
- Traffic signal work
- Jackson - 8th to 10th
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Water main installation between 6th and 7th
- Water main installation between 8th and 10th
Weekend Work:
- Electrical duct bank and vault installation between 1st and 2nd
- Water main installation between 6th and Maynard
- Storm drain installation at 8th Avenue intersection
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note on Water Main Shutoffs:
October 6th - 7th will begin the first of three weekend water shutoffs in October for the Chinatown/International District. The shutoffs will begin at 10:00 p.m. on Saturdays and continue until 10:00 a.m. on Sundays. If your building will be affected you will receive a notice directly from Seattle Public Utilities at least 72 hours in advance.
September 18th - 23rd
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Detour of Pike at Broadway
Weekday Work:
- Howell - Broadway to Nagel
- Electrical duct bank installation
- Pine to Madison
- Trackway construction
- Traffic signal work
- Madison to Columbia
- Jefferson intersection
- Electrical duct bank installation
Weekend Work:
Traffic Advisory:
- Pike will be closed at Broadway on the weekend of September 22nd and 23rd with right turns permitted at Broadway.
- Broadway will be closed between Madison and Marion from 8:00 p.m. to 6:00 a.m. for up to two weeks beginning September 24th. There will be a signed detour.
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Traffic Delays This Week on Yesler at 10th
Weekday Work:
- Broadway at Alder
- Electrical duct bank and storm drain installations
- Yesler at 10th
- Yesler - 12th to 14th
- Traffic signal work
- Jackson - 8th to 10th
Work Hours:
Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Storm drain installation between 6th and Maynard
- Water main installation between 8th and 10th
Weekend Work:
- Electrical duct bank installation between 1st and 2nd
- Water main installation between 6th and Maynard
- Storm drain installation at 8th Avenue intersection
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note Regarding Water Main Installation:
Beginning in early October there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
September 11th - 16th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Closure to Through Traffic on Pine and Union at Broadway
Weekday Work:
- Howell - Broadway to Nagel
- Electrical duct bank installation
- Sidewalk and pedestrian ramp construction
- Howell to Madison
- Saw cutting and construction of trackway
- Traffic signal foundations
- Madison to Columbia
- Minor intersection
- Construct foundation for electrical substation
Weekend Work:
- Howell - Broadway to Nagel
- Electrical duct bank installation
- Pine and Union intersections
Traffic Advisory:
- On the weekend of September 15th and 16th Pine and Union will be closed to through traffic at Broadway. However, right turns will be allowed at Broadway
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Additional Traffic Delays This Week on Yesler at 10th
Weekday Work:
- Broadway at Alder
- Electrical duct bank and storm drain installations
- Yesler at 10th
- Yesler - 12th to 14th
- Roadway paving
- Traffic signal work
- King at 12th
- Jackson - 8th to 10th
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Water main installation between 8th and 10th
Weekend Work:
- Storm drain installation between 7th and 8th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note Regarding Water Main Installation:
Beginning in early October there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
September 6th - 9th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Trackway Construction Between Pine and Pike
Weekday Work:
- Howell - Broadway to Nagel
- Electrical duct bank installation
- Howell to Pine
- Traffic signal foundations and electrical work
- Pine to Pike
- Pike to Madison
- Trackway survey and saw cutting
- Madison to Columbia
- Minor intersection
- Construct foundation for electrical substation
Weekend Work:
- Pine intersection
- Minor intersection
Traffic Advisory:
- On the weekend of September 15th & 16th Pine Street will be closed to through traffic at Broadway
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Additional Traffic Delays This Week on Yesler
Weekday Work:
- Broadway at Alder
- Storm drain installation
- Electrical duct bank installation
- Broadway at Spruce
- Yesler at 10th
- Sewer and storm drain installation
- Yesler - 12th to 14th
- Trackway construction
- Main - 14th to Boren
- Construct foundation for electrical substation
- King at 12th
Weekend Work:
- Yesler at Boren
- Water service maintenance by SPU
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
- Weekend - 2:00 a.m. - 10:00 a.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Storm drain installation at 6th and 7th
- Water main installation between 7th and 8th
Weekend Work:
- Electrical duct bank installation between 1st and 2nd
- Storm drain installation at 6th and between 7th and 8th
Work Hours:
- Weekdays 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note Regarding Water Main Installation:
Beginning in late September there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
August 27th - September 2nd
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Trackway Construction Between Pine and Pike
Weekday Work:
- Howell to Pine
- Traffic signal foundations and electrical work
- Pine to Pike
- Pike to Madison
- Trackway survey and saw cutting
- Marion to Columbia
- James to Jefferson
- Minor intersection
- Electrical duct bank installation
Weekend Work:
- There will be no work over Labor Day weekend
Work Hours:
- Weekdays -7:00 a.m. - 4:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Additional Traffic Delays This Week on Yesler
Weekday Work:
- Broadway - Spruce to Yesler
- Storm drain and sewer installation
- Yesler - Broadway to 10th
- Yesler - 12th to 14th
- Trackway construction
- 14th - Yesler to Washington
- Sidewalk reconstruction
- Traffic signal pole installation
- Main - 14th to Boren
- Construct foundation for electrical substation
Weekend Work:
- There will be no work over Labor Day weekend
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
Traffic Advisory:
- Northbound 14th between Main and Yesler will reopen to traffic on Friday, August 31st
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Storm drain installation between 7th and 8th
Weekend Work:
- There will be no work over Labor Day weekend
Work Hours:
- Weekdays - 7:00 a.m. - 4:00 p.m.
Note Regarding Water Main Installation:
Beginning in late September there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
August 20th - August 26th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Trackway Construction Between Pine and Pike
Weekday Work:
- Howell to Pine
- Traffic signal foundations and electrical work
- Pine to Pike
- Excavation and construction of trackway
- Marion to Columbia
- James to Jefferson
- Minor intersection
- Electrical duct bank installation
Weeknight Work:
Weekend Work:
Work Hours:
- Weekdays -7:00 a.m. - 4:00 p.m.
- Weekend Work at Cherry - Continuous work from 7:00 a.m. Saturday until 5:00 p.m. Sunday
Note Regarding Water Main Installation:
This weekend there will be a nighttime shutdown to water service from Cherry to Jefferson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Additional Traffic Delays This Week on Yesler
Weekday Work:
- Broadway- Boren to Yesler
- Storm drain and sewer installation
- Yesler - Broadway to 10th
- Storm drain and sewer installation
- Yesler - 12th to 14th
- Trackway construction
- Sewer main installation
- 14th - Yesler to Washington
- Roadway and sidewalk reconstruction
- Traffic signal foundation construction
- Main - 14th to Boren
- Construct foundation for electrical substation
Weekend Work:
Work Hours:
- Weekdays - 7:00 a.m. - 7:00 p.m.
- Saturday - 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 2nd
- Storm drain installation between 6th and 7th
- Installation of water main between 7th and 8th
Weekend Work:
- Storm drain installation at 7th
Work Hours:
- Weekdays - 7:00 a.m. - 4:00 p.m.
- Weekend -7:00 a.m. - 6:00 p.m.
Note Regarding Water Main Installation:
Beginning in late September there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
August 13th - August 19th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Road Reconstruction, Water Main and Storm Drain Installation
Weekday Work:
- Howell to Pine
- Reconstruction of roadway between tracks
- Union intersection
- Marion intersection
- Storm drain and sewer main installation
- Minor intersection
- Electrical duct bank installation
Weekend Work
Work Hours:
- Monday - Friday 7:00 a.m. - 4:00 p.m.
- Weekend - Continuous work from 7:00 a.m. Saturday until 5:00 p.m. Sunday
Upcoming Work:
The week of August 20th excavation and construction will begin for the trackway between Pine and Pike. Expect lane closures, no left turn at Pine for northbound traffic, and a loss of parking and loading zones.
Note Regarding Water Main Installation:
In late August there will be nighttime interruptions to water service from Cherry to Jefferson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Expect Weekend Closure of 14th and Yesler Intersection for Concrete Paving
Weekday Work:
- Yesler - Broadway to 10th
- Storm drain and sewer installation
- Yesler - 12th to 14th
- Trackway construction
- 14th - Yesler to Rainier
- Trackway construction
- Storm drain installation
- Electrical Installations
- Main - 14th to Boren
- Electrical duct bank installation
Weekend Work:
- Yesler and 14th intersection
- Intersection reconstruction
Work Hours:
- Weekdays - 7:00 a.m. - 5:00 p.m.
- Friday Night - 6:00 p.m. - 10:00 p.m.
Expect loud impact work under a noise variance, including concrete breaking, beginning at 6:00 p.m.
- Sunday - 8:00 a.m. - 5:00 p.m.
- Saturday - 7:00 a.m. - 7:00 p.m.
Traffic Advisory:
The intersection of 14th and Yesler will be closed to all traffic from 6:00 p.m. on Friday, August 17th until 5:00 a.m. Monday, August 20th.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main, Storm Drain, and Electrical Duct Bank Installation
Weekday Work:
- Electrical duct bank installation between 1st and 3rd
- Installation of water main between Maynard and 7th
- Storm drain installation between 7th and 8th
Weekend Work:
- Storm drain installation at 7th
Work Hours:
- Monday - Friday 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 6:00 p.m.
Note Regarding Water Main Installation:
Beginning in late September there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
August 6th - August 12th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction and Water Main Installation
Expect Traffic Congestion, Metro stop relocations between Howell and Pike, and early morning construction
Weekday Work:
- Howell to Pine
- Trackway construction
- Electrical installations
- Pike and Union intersections
- Traffic signal foundation installation
- Electrical installations
- Marion intersection
Weekend Work:
Work Hours:
- Monday - Friday 7:00 a.m. - 4:00 p.m.
Note Regarding Water Main Installation:
In mid-August there will be nighttime interruptions to water service from Cherry to Jefferson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Storm Drain, Sewer and Electrical Duct Bank Installation
Expect relocation of Metro's westbound stop at Yesler and 14th as well as closure of their eastbound stop at Yesler and 12th
Weekday Work:
- Yesler - Broadway to 10th
- Storm drain and sewer installation
- Yesler - 12th to 14th
- Trackway construction
- Sidewalk construction
- 14th - Yesler to Main
- Trackway construction
- Electrical Installations
- Main - 14th to Boren
- Electrical duct bank installation
- Jackson - 10th to 14th
- PSE gas line installation
Work Hours:
Monday through Friday - 7:00 a.m. - 5:00 p.m.
Traffic Advisory:
Northbound 14th from Main to Yesler continues to be closed to traffic through the end of August. Southbound 14th will remain closed as well.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main and Storm Drain Installation
Weekday Work:
- Electrical duct bank installation between 1st and 3rd
- Installation of water main between Maynard and 7th
Weekend Work:
- Storm drain installation at 7th
- Electrical duct bank installation between 1st and 3rd
Work Hours:
- Monday - Friday 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 4:00 p.m.
Note Regarding Water Main Installation:
Beginning in mid-August there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
July 30th - August 5th
Broadway Segment CONSTRUCTION DETAIL-
Track Construction and Water Main Installation
Expect Traffic Congestion, Metro stop relocations between Howell and Pike, and early morning construction
Weekday Work:
- Howell to Pine
- Trackway grading and construction
- Pike intersection
- Traffic signal foundation installation
Work Hours:
- Monday - Friday 7:00 a.m. - 4:00 p.m.
Note Regarding Water Main Installation:
In mid-August there will be nighttime interruptions to water service from Cherry to Jefferson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
14th/Yesler Segment - CONSTRUCTION DETAIL
Track Construction and Storm Drain, Sewer and Electrical Duct Bank Installation
Expect relocation of Metro's westbound stop at Yesler and 14th as well as closure of their eastbound stop at Yesler and 12th
Weekday Work:
- Yesler - Broadway to 10th
- Storm drain and sewer installation
- Yesler - 12th to 14th
- Trackway construction
- Sidewalk construction
- 14th - Yesler to Main
- Main - 14th to Boren
- Electrical duct bank installation
- Jackson - 10th to 14th
- PSE gas line installation
Weeknight Work:
- Delivery of steel rail to worksite
Work Hours:
- Monday through Friday - 7:00 a.m. - 5:00 p.m.
Traffic Advisory:
Beginning July 30th and continuing through August northbound 14th from Main to Yesler will be closed to traffic. Southbound 14th will remain closed as well.
Jackson Segment- CONSTRUCTION DETAIL
Water Main and Storm Drain Installation
Weekday Work:
- Electrical duct bank installation between 1st and 3rd
- Storm drain connections at SE corner of 6th and Jackson
- Installation of water main between 6th and 7th
Weekend Work:
- Storm drain installation between 7th and 8th
Work Hours:
- Monday - Friday 7:00 a.m. - 4:00 p.m.
- Weekend 7:00 a.m. - 4:00 p.m.
Note Regarding Water Main Installation:
Beginning in late August there will be water service interruptions as new connections are made along Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
July 16th - July 22nd
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction and Water Main Installation
Expect Traffic Congestion, Metro stop relocations between Howell and Pike, and early morning construction
Weekday Work:
- Howell to Pine
- Saw cutting to prepare for track excavation
- Electrical conduit installation
- Cherry to Jefferson
Weeknight Work:
- Delivery of steel rail to work site
Weekend Work:
Work Hours:
- Wednesday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Storm Drain, Sewer and Electrical Duct Bank Installation
Expect relocation of Metro's westbound stop at Yesler and 14th as well as closure of their eastbound stop at Yesler and 12th
Weekday Work:
- Broadway to Boren
- Storm drain and sewer installation
- Yesler - 12th to 14th
- Excavation and construction of trackway
- Electrical conduit installation
- Jackson - 10th to 14th
- PSE gas line installation
Weeknight Work:
- Delivery of steel rail to work site
Work Hours:
Monday through Friday 7:00 a.m. - 5:00 p.m.
Traffic Advisory:
Beginning the week of July 30th and continuing through August northbound 14th from Main to Yesler will soon be closed to traffic. Southbound 14th will remain closed as well.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main and Storm Drain Installation
Expect work throughout the night on Saturday
Weekday Work:
- Saw cut concrete and excavation for track utilities at 3rd
Weekend Work:
- Transfer water service between 5th and 6th
- Installation of water main between 6th and 7th
Storm drain connections at 6th and 7th
Work Hours:
- Thursday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. until 5:00 p.m. Sunday
- Expect work throughout the night between 5th and 6th
Note Regarding Water Main Installation:
- Reschedule - Last weekend's water service installation has been rescheduled due to technical difficulties.
- This weekend, July 21st and 22nd, there will be water service interruptions between 5th and 6th on Jackson. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.
July 9th - July 15th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Closure of Pine at Broadway
Expect Traffic Congestion, Metro stop relocations between Howell and Pike, and early morning construction
Weekday Work:
- Howell to Pine
- Track construction
- Traffic signal foundation construction
- Cherry to Jefferson
Weekend Work:
- Howell through Pine intersection
- Track construction
- Concrete placement in Pine intersection
- Traffic signal foundation construction
Work Hours:
- Wednesday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Storm Drain, Sewer and Electrical Duct Bank Installation
Expect relocation of Metro's westbound stop at Yesler and 14th as well as closure of their eastbound stop at Yesler and 12th
Weekday Work:
- Broadway at Alder
- Electrical duct bank installation
- Broadway to Boren
- Storm drain and sewer installation
- Yesler - 12th to 14th
- Excavation and construction of trackway
- Installation of traffic signal foundations
Work Hours:
- Monday through Friday 7:00 a.m. - 5:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main and Storm Drain Installation
Expect work throughout the night on Saturday
Weekday Work:
- Saw cut concrete between 1st and 3rd
Weekend Work:
- Electrical duct bank installation between 1st and 3rd
- Connect to 16” water main at 5th
- Transfer water service between 5th and 6th
- Storm drain connections at 6th
- Installation of water main between 6th and 7th
Work Hours:
- Thursday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. until 5:00 p.m. Sunday
- Expect work throughout the night between 5th and 6th
June 25th - July 1st
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction, Storm Drain and Electrical Duct Bank Installation
Expect Metro stop relocations at Pine and early morning construction
Weekday Work:
- Howell to Pine
- Track grading & construction
- Rail welding
- Temporary pavement restoration
- Traffic signal modifications at Pine and in mid-block crosswalk
- Pine to Madison
- Completion of manhole installations
Weekend Work:
- Howell to Pine
- Track excavation and construction
- Union intersection
- Electrical duct bank installation
Work Hours:
- Wednesday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Manhole Reconstruction, Conduit Installation, Sidewalk Repair
Expect a Metro bus stop relocation, lane closures, and a loss of parking around work zones
Weekday Work:
- Yesler - 12th to 14th
- Manhole reconstruction
- Electrical conduit installation
- Sidewalk restoration
Work Hours:
- Monday through Friday 7:00 a.m. - 4:00 p.m.
Next Week Heads Up:
- 14th southbound will be closed to traffic between Yesler and Main
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main and Storm Drain Installation
Expect early morning construction, lane closures and a loss of parking
Weekday Work:
- Saw cutting
- Storm drain connections at 5th
Weekend Work:
- Storm drain connections between 6th and Maynard
- Installation of water main on Jackson between 5th and 6th
Work Hours:
- Wednesday through Friday
- Intermittent work: 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
June 18th - June 24th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction, Storm Drain and Electrical Duct Bank Installation
Expect Metro stop relocations at Pine and early morning construction
Weekday Work:
- Howell to Pine
- Track grading & construction
- Rail welding
- Temporary pavement restoration
- Traffic signal modifications at Pine and in mid-block crosswalk
- Pine to Madison
- Completion of manhole installations
Weekend Work:
- Howell to Pine
- Track excavation and construction
- Union intersection
- Electrical duct bank installation
Work Hours:
- Wednesday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Manhole Reconstruction, Conduit Installation, Sidewalk Repair
Expect a Metro bus stop relocation, lane closures, and a loss of parking around work zones
Weekday Work:
- Yesler - 12th to 14th
- Manhole reconstruction
- Electrical conduit installation
- Sidewalk restoration
Work Hours:
- Monday through Friday 7:00 a.m. - 4:00 p.m.
Next Week Heads Up:
- 14th southbound will be closed to traffic between Yesler and Main
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main and Storm Drain Installation
Expect early morning construction, lane closures and a loss of parking
Weekday Work:
- Saw cutting
- Storm drain connections at 5th
Weekend Work:
- Storm drain connections between 6th and Maynard
- Installation of water main on Jackson between 5th and 6th
Work Hours:
- Wednesday through Friday
- Intermittent work: 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
June 11th - June 17th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Commencing Excavation for Inbound Track
Look for Relocation of Metro bus stop at Union for southbound passengers. Metro Rider Alerts will be posted.
Expect early morning construction, lane closures and a loss of parking around work zones
Weekday Work:
- Saw cutting roadway
- Asphalt grinding
- Electrical duct bank installation at Jefferson and Union
Weekend Work:
- Excavation of inbound track bed from Howell to Pine
- Storm drain installation at Pine
- Electrical duct bank installation at Union
Work Hours:
- Wednesday - Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Manhole Reconstruction and Storm Drain Installation
Expect lane closures and a loss of parking around work zones
Weekday Work:
- 14th - Washington to Main
- Yesler - 12th to 14th
- Manhole reconstruction
Work Hours:
- Wednesday through Friday 7:00 a.m. - 4:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main Installation
Expect early morning construction, lane closures and a loss of parking
Weekday Work:
- Saw cutting and preparation for storm drain connections and installation of water main
Weekend Work:
- Storm drain connections and installation of water main on Jackson between 5th and 6th
Work Hours:
- Wednesday through Friday
- Intermittent work: 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
June 8, 2012
JACKSON SEGMENT - CONSTRUCTION UPDATE
The utility work previously scheduled to begin this weekend has been postponed. This work is now scheduled to begin Wednesday, June 13th.
Weekday Work:
- Saw cutting and preparation for installation of water line
Weekend Work:
- Storm drain connections and installation of water main on Jackson between 5th and 6th
Work Hours:
- Wednesday through Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
If you have any questions regarding this work please email the project at seattle.streetcar@seattle.com or call the Project Hotline at 9206)257-2121
June 4th - June 10th
BROADWAY SEGMENT - CONSTRUCTION DETAIL
Storm Drains, Electrical Duct banks, Manholes
Expect Metro bus stop relocation at Union for southbound passengers
Weekday Work:
- Electric duct bank construction at Union
- Manhole reconstruction at Madison
Weekend Work:
- Manhole reconstruction at Howell
- Electric duct bank construction at Pine and at Union
- Tree removal
Work Hours:
- Wednesday through Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Drainage Connections and Manhole Reconstruction
Expect early morning construction, lane closures and a loss of parking around work zones
Weekday Work:
- Yesler - 12th to 14th
- Storm drain connections & manhole reconstruction
- 14th and Main
Weekend Work:
Work Hours:
- Wednesday through Friday 7:00 a.m. - 4:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 7:00 a.m.
- Saturday 7:00 a.m. - 7:00 p.m.
JACKSON SEGMENT - CONSTRUCTION DETAIL
Water Main Installation
Expect early morning construction, lane closures and a loss of parking
Weekend Work:
- Storm drain connections and installation of water main on Jackson between 5th and 6th
Work Hours:
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
May 28th to June 3rd
For the 14th/Yesler Segment
Drainage Connections and Manhole Reconstruction
Expect early morning construction, lane closures and a loss of parking around work zones
14TH/YESLER CONSTRUCTION DETAIL
Weekday Work:
- Yesler - 12th to 14th
- Storm drain connections & manhole reconstruction
- 14th - Main to Rainier
Work Hours: Wednesday through Friday 7:00 a.m. - 4:00 p.m.
Loud impact work under a noise variance, including concrete breaking, may begin at 7:00 a.m.
For the Broadway Segment
Storm Drain Connections, Electrical Duct banks and Manhole Rebuilds
Expect one lane of traffic in each direction and a loss of parking around work zones
BROADWAY CONSTRUCTION DETAIL
Weekday Work:
- Manhole reconstruction at Howell
- Storm drain connections and manhole reconstruction at Union
Weekend Work:
- Manhole reconstructions at Howell and Union
- Electrical duct bank construction at Pine
Work Hours:
- Wednesday through Friday 7:00 a.m. - 4:00 p.m.
- Saturday 7:00 a.m. - 7:00 p.m.
- Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m.
- Sunday 8:00 a.m. - 5:00 p.m.
May 21st to May 27th
For the 14th/Yesler Segment
Drainage Connections on Yesler and 14th
Expect lane closures and a loss of parking around work zones
14TH/YESLER CONSTRUCTION DETAIL
Weekday Work:
- Yesler - 12th to 14th
- 14th - Washington to Main
Weekend Work:
- There will be no weekend construction activity in observance of Memorial Day
Work Hours: Wednesday through Friday 7:00 a.m. - 4:00 p.m.
For the Broadway Segment
Storm Drain Connections
Expect one lane of traffic in each direction and a loss of parking around work zones
BROADWAY CONSTRUCTION DETAIL
Weekday Work:
- Storm drain connections at the Pike and Union intersections
Weekend Work:
- In observance of Memorial Day there will be no weekend construction activity
Work Hours:
- Wednesday through Friday 7:00 a.m. - 4:00 p.m.
May 1 2012
Patching Pavement, Making Storm Inlet Connections, and Rebuilding Manholes
Expect one lane of traffic in each direction and a loss of parking around work zones
BROADAY CONSTRUCTION DETAIL
Weekday Work:
Howell St to Pine St
- 5/2 - Pave area where traffic median was removed the previous weekend
Pike St to Union St
- 5/2 to 5/3 - Build drainage connections south of Pike St intersection
- 5/4 - Manhole reconstruction at Pike St intersection
Union St to Madison St
- 5/2 to 5/4 -Reconstruction of two manholes just north of Madison St
Weekend Work:
Howell St to Pine St
- 5/5 - Build inlet connections for storm system at SCCC crosswalk
- 5/5 to 5/6 - Manhole reconstruction and drainage connections at Pine St intersection
Pike St to Union St
- 5/5 to 5/6 - Build inlet connections for storm at Union St
Work Hours: Work will take place Wednesday through Sunday. Work hours are 7:00 a.m. - 4:00 p.m. weekdays, 7:00 a.m. - 7:00 p.m. Saturdays and 8:00 a.m. - 5:00 p.m. Sundays. Loud impact work under a noise variance, including concrete breaking, may begin at 8:00 a.m. on Saturdays.
What to Expect During This Week's Construction:
- On street parking and loading restrictions
- One travel lane in each direction
- Pedestrian detours
- Construction noise, dust and increased truck activity
- Bus stops and transit routes will not be affected this week
- Dates of work are subject to change due to weather
View 5/01/12 Construction Alert
April 23, 2012
Construction Preparation and Median Removal
Expect loss of parking and a mid-block crosswalk closure on Broadway between Howell St and Pine St
Weekday Work: April 26th - April 27th
Broadway - Howell St to Pine St
- Initial delivery of equipment, materials and traffic control devices
- Remove irrigation system from median
- Saw cut roadway in preparation for median removal and utility relocation.
Weekend Work: April 28th - April 29th
Broadway - Howell St to Pine St
- Remove trees from traffic median
- Demolish and remove median
- Rebuild manholes in future trackway
View 4/23/12 Construction Alert
4/16/12
Construction on Broadway Starts Week of April 23rd
Prepare for lane closures, parking restrictions, and night and weekend work
Construction is beginning on Seattle Streetcar' First Hill Line. The first step in this two-year long project will be underground utilities work. Water, drainage, gas service, and electrical ducts near the track will be relocated or protected. The next step, beginning this June, will be track installation.
Work on Broadway during April & May
Denny to Madison
- Removal of traffic median and trees in front of Seattle Central Community College
- Reconstruction of manholes
- Installation of drainage inlets
- Installation of an electric duct bank at Pine
Madison to Jefferson
- Relocation of an 8” gasline by Puget Sound Energy
View 4/16/12 Construction Alert
4/10/2012: Construction on the First Hill Streetcar Line will start in late April. The first step in this two-year project will be underground utilities work. Water and electrical lines near the track will be relocated or protected, and several new stormwater detention facilities and electrical ducts will be installed.
|