First Hill StreetCar Construction

Project Updates

May 7 - May 12

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Sidewalk Restoration
Weekday Work: 7 a.m. – 4 p.m.

  • Howell to Pine
    • Track construction
    • Electrical installations for signals
  • Pike intersection
    • Electrical installations for signals
  • Marion to Jefferson
    • Sidewalk restoration at Boylston, Columbia, Cherry, and Minor

Weekend Work: 7 a.m. – 7 p.m.

  • Pine intersection
    • Electrical installations for signals

What to Expect During Construction This Week:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closure at Jackson & 10th this Weekend
Weekday Work: 7 a.m. – 4 p.m.

  • Broadway – Terrace & Boren
    • Electrical installations for signals
    • Construct pedestrian island at Boren
  • Broadway - Alder to Fir
    • Sidewalk restoration
  • Jackson – 10th to 12th
    • Saw cutting  eastbound roadway
    • Sidewalk and curb restoration

Weekend Work: 7 a.m. – 7 p.m.

  • Excavation for roadway restoration in eastbound lane between 10th and 12th, remove and replace south leg of 10th and Jackson intersection

What to Expect During Construction This Week

  • On-street parking and loading restrictions
  • Driveway closures
  • Pedestrian and traffic detours
  • Construction noise and dust

Traffic Advisories:

  • Jackson and 10th– Beginning at 7:00 a.m. May 11, the south leg of this intersection will be closed. It will reopen Monday morning, May 13.
  • 12th at Jackson - Beginning at 7:00 a.m. May 18, the southbound lane of 12th will be closed at Jackson. It will reopen Monday morning, May 20.

JACKSON SEGMENT - CONSTRUCTION DETAIL
Track Construction and Sidewalk Restoration
Weekday Work: 7 a.m. – 4 p.m.

  • Track construction and electrical installations between 1st  and 3rd
  • Sidewalk restoration on south side  between 5th and 8th

Weekend Work: 7 a.m. – 7 p.m.

  • Excavation for track construction between Occidental  and 3rd

What to Expect During Construction This Week

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction during the week
  • Pedestrian detours
  • Construction noise and dust


Past Project Updates

April 30 - May 5

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Between Denny and Howell
Weekday Work: 7:00 a.m. – 4:00 p.m.

  • Denny to Pike
    • Track construction from Denny to Howell
    • Electrical installations for signals at Denny, Olive and Pike intersections
  • Madison to Cherry
    • Electrical installations for signals and utility pole foundations
  • James to Boren
    • Electrical installations for signals at Terrace and Boren

What to Expect During Construction This Week:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk Restoration
Weekday Work 7:00 a.m. – 4:00 p.m.

  • Broadway  - Fir to Spruce
    • Sidewalk restoration
  • Yesler – Broadway to 14th  
    • Platform construction
    • Sidewalk and curb ramp restorations
  • Jackson - 8th  to 10th
    • Sidewalk and curb restoration on south side

Nighttime Work - Thursday Morning
4:00 a.m. – 7:00 a.m.

  • Pull steel rail along Jackson from 10th to 2nd

What to Expect During This Week’s Construction:

  • On-street parking and loading restrictions
  • Pedestrian and traffic detours
  • Construction noise and dust

Traffic Advisories:

  • Expect closure of south leg of the intersection of 10th and Jackson the weekend of 5/11-5/12
  • Expect closure of south leg of the intersection of 12th and Jackson the weekend of 5/18-5/19

JACKSON SEGMENT - CONSTRUCTION DETAIL
Full Intersection Closure at Jackson and 2nd this Weekend

Weekday Work: 7:00 a.m. – 4:00 p.m.

  • Construct foundations for utility poles on 8th between Jackson and Dearborn
  • Form and pour eastbound curb lane between 7th and 8th
  • Sidewalk and curb restoration on south side of Jackson between  6th and 8th
  • Track construction, storm system work and utility pole foundation installations  between Occidental  and 3rd

Weekend & Night Work: Friday 5/3, 7:00 pm – Sunday 5/5, 7:00 pm

  • Track excavation and construction between 2nd and 3rd
  • Construction of 2nd Ave intersection

Traffic Advisories:

  • Jackson and 2nd – Beginning at 7:00 p.m. May 3 this intersection will be closed to traffic for the weekend
  • Detour Map

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction during the week
  • Pedestrian detours
  • Construction noise and dust

 

April 23 - April 28

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction Between Denny and Howell

Weekday Work: 7:00 a.m. – 4:00 p.m.

  • Denny to Pine
    • Track construction
    • Electrical installations for signals
    • Install utility poles
  • Cherry to Boren
    • Electrical work at Terrace/Boren for signals
    • Sidewalk restoration at Minor
    • Asphalt paving restoration

Weekend Work: 7:00 a.m. – 7:00 p.m.

  • Denny to Howell
    • Track construction

What to Expect During Construction This Week:

  • Odors from asphalt paving
  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk and Curb Restoration

Weekday Work 7:00 a.m. – 4:00 p.m.

  • Yesler – Broadway to 14th  
    • Sidewalk restoration
    • Platform construction
    • Asphalt paving
  • 14th  – Yesler to Washington
    • Asphalt paving
  • Jackson – 12th to 14th
    • Electrical installation at Metro stop
  • Jackson – 9th to 12th 
    • Sidewalk and curb restoration

What to Expect During This Week’s Construction:

  • Odors from asphalt paving
  • On-street parking and loading restrictions
  • Pedestrian and traffic detours
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closure at Jackson and 8th this Weekend

Weekday Work: 7:00 a.m. – 4:00 p.m.
 Electrical installation at eastbound Metro stop at Maynard

  • Construct foundations for utility poles on 8th between Jackson and Dearborn
  • Saw cutting and sidewalk and curb restoration on south side of Jackson between  5th and 8th
  • Saw cutting, track construction and storm drain installations  between Occidental  and 3rd 

Weekend Work: 7:00 a.m. – 7:00 p.m.

  • Excavate the eastbound curb lane between 7th and 8th and the south leg of the intersection of 8th and Jackson, for permanent paving installation.
  • Storm drain installation, and excavation for track, between Occidental  and 3rd

Traffic Advisories:

  • Jackson and 8th  – On April 27 – 29  the south leg of this intersection  will be closed to traffic
  • Jackson and 2nd – Beginning at 7:00 p.m. May 3 this intersection will be closed to traffic for the weekend

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

April 15 - April 21

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Partial Weekend Closure of Broadway/Jefferson Intersection
Weekday Work: 7:00 a.m. – 4:00 p.m.

  • Denny to Howell
    • Track construction
    • Electrical installations for signals
  • Madison to Jefferson
    • Electrical work for traffic signals at Marion, Cherry, James and Jefferson
    • Utility pole foundations
    • Install utility poles
    • Asphalt roadway removal and replacement
  • James to Boren
    • Excavation for roadway restoration
    • Electrical work at Terrace/Boren

Weekend Work: 7:00 a.m. – 7:00 p.m.

  • Jefferson intersection

Asphalt roadway removal and replacement

Traffic Advisory:
Broadway and Jefferson – The west leg of this intersection will be closed to traffic the weekend of April 20 - 21
                                                           
What to Expect During Construction This Week:

  • Odors from asphalt paving
  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Northbound 14th Ave Closed - Main to Yesler

Weekday Work 7:00 a.m. – 4:00 p.m.

  • Broadway –Alder to Yesler
    • Sidewalk restoration
    • Asphalt road restoration
  • Yesler – Broadway to 10th 
    • Sidewalk restoration
    • Platform construction
  • Yesler – 12th to 14th 
    • Asphalt roadway removal and paving
  • 14th  - Yesler to Main
    • Asphalt roadway removal and paving
    • Utility pole foundation installations
  • Jackson – Rainier to 8th
    • Install  utility poles
    • Saw cutting for road restoration

Traffic Advisory:
14th Avenue S – Main to Yesler
This street will be closed to both north – and southbound traffic from Monday, April 15 until Saturday, April 20.

What to Expect During This Week’s Construction:

  • Odors from asphalt paving
  • On-street parking and loading restrictions
  • Pedestrian and traffic detours
  • Construction noise and dust

 

JACKSON SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closure at Jackson and 5th this Weekend

Weekday Work: 7:00 a.m. – 4:00 p.m.

  • Form and pour eastbound curb lane between Maynard and  7th and the south leg of the Maynard and Jackson intersection
  • Sidewalk and curb restoration between  5th and 8th
  • Gas line and storm drain installations and saw cutting between Occidental  and 3rd 

Weekend Work: 7:00 a.m. – 7:00 p.m.

  • Shift overhead trolley wires between 5th and 7th
  • Gas line and storm drain installations , and excavation for trackway, between Occidental  and 3rd 

Nighttime Work: Friday and Saturday night   10:00 p.m. – 7:00 a.m.

  • Sewer repair between 2nd and Occidental

Traffic Advisories:

  • Jackson and Maynard Closure - The south leg of the intersection of S Jackson and Maynard Avenue will be closed to traffic until Saturday April 20
  • Jackson and 5th Closure – On April 20 & 21 the north leg of the intersection of Jackson and 5th will be closed to traffic
  • Jackson and 8th  Closure – On April 27 – 29  the south leg of this intersection  will be closed to traffic

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

April 8 - April 14

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Track Construction - Denny to Howell, Utility Pole Installations

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Denny to Howell
    • Storm drain installation
    • Electrical installations for signals
  • Howell to Madison
    • Install utility poles
  • Madison to Columbia
    • Electrical installations at Marion
    • Install utility poles
  • James intersection
    • Electrical installations for signals

Weekend Work: 7:00 a.m. - 7:00 p.m.

  • Denny to Howell
    • Excavation for track construction
    • Electrical installation for signals

Traffic Advisory:
Broadway and Jefferson - This intersection will be partially closed the weekend of April 19-21

What to Expect During Construction This Week:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
Construction noise, dust and increased truck activity


14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekend Closure at 12th and Yesler

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Jefferson to Boren
    • Install utility poles
    • Electrical installation at Terrace/Boren
  • Yesler - Broadway to 10th
    • Sidewalk restoration
    • Platform construction

Weekend Work: Friday at 7:00 p.m. until Monday at 6:00 a.m.

  • Yesler - Boren to 12th
    • Roadway restoration

Traffic Advisories:
12th at Yesler Intersection - Friday, April 12 at 7:00 p.m. until Monday, April 15 at 6:00 a.m. this intersection will be closed to all traffic.
14th Avenue S - Main to Yesler -
This street will be closed to both north - and southbound traffic from Monday, April 15 until Saturday, April 20.

What to Expect During This Week's Construction:

  • Nighttime work at 12th and Yesler intersection
  • On-street parking and loading restrictions
  • Detours


JACKSON SEGMENT - CONSTRUCTION DETAIL
Gas Line Installation and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Form and pour eastbound curb lane between 6th and Maynard and the south leg of the 7th and Jackson intersection
  • Sidewalk and curb restoration between 5th and 8th
  • Gas line installation and saw cutting for track construction between Occidental and 3rd
  • Electrical work on 8th between Jackson and King

Weekend Work: 7:00 a.m. - 7:00 p.m.

  • Excavate the eastbound curb lane between Maynard and 7th, and the south leg of the intersection of Maynard and Jackson, for permanent paving installation.
  • Gas line installation between 2nd and 3rd
  • Manhole installation at 2nd

Traffic Advisories:

  • Jackson and Maynard Closure - Beginning Saturday, April 13 the south leg of the intersection of S Jackson and Maynard Avenue will be closed to traffic until Saturday April 20
  • Jackson and 5th Closure - On April 20 & 21 the north leg of the intersection of Jackson and 5th will be closed to traffic

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

More information at http://www.seattlestreetcar.org/firsthill.htm

March 26th - 31st

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Utility Installations and Roadway Restoration

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Denny to Howell
    • Electrical installations
  • Harvard to Madison
    • Roadway restoration
    • Expect late night construction activity Friday, March 29 at Madison
  • Madison to Columbia
    • Utility pole foundations
    • Electrical installations

Weekend Work:
7:00 a.m. - 7:00 p.m.

  • Harvard to Madison
    • Roadway restoration

Traffic Advisory:
Madison at Broadway - The west leg of this intersection will be closed from Friday, March 29 at 7:00 p.m. until Saturday March 30 at 10:00 p.m.

What to Expect During Construction This Week:

  • Odors from asphalt paving from Harvard to Madison on March 30
  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekend Closure at Broadway and Boren

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Jefferson to Boren
    • Roadway restoration
    • Expect late night construction activity Friday, March 29 at Boren
  • Broadway - Boren to Yesler
    • Installation of utility pole foundations
  • Yesler - Broadway to 12th
    • Roadway and sidewalk restoration
    • Platform construction
  • Jackson at 10th
    • Sidewalk restoration

Weekend and Nighttime Work: Friday at 7:00 p.m. until Saturday at 10:00 p.m.

  • Jefferson to Boren
    • Roadway restoration

Traffic Advisories:
Boren at Broadway - The west leg of this intersection will be closed from Friday, March 29 at 7:00 p.m. until Saturday March 30 at 10:00 a.m.

What to Expect During This Week's Construction:

  • Odors from asphalt paving from Jefferson to Boren on March 30
  • On-street parking and loading restrictions
  • Detours
  • Construction noise and dust
  • For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Sidewalk restoration and saw cutting between 5th and 7th
  • Pavement restoration in eastbound curb lane between 5th and 6th
  • Electrical work and street, sidewalk and alley restoration between Occidental and 3rd

Weekend Work:

  • Excavate the eastbound curb lane between 6th and Maynard for permanent paving installation

Traffic Advisory:

  • Beginning Saturday, March 30th the south leg of the intersection of S Jackson and Maynard Avenue will be closed to traffic until Saturday April 6th.

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

March 19th - 24th

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Electric Utility Installations

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Madison to Jefferson
    • Electrical installations
    • Utility pole foundations
  • James intersection
    • Remove island on NE corner

Weekend Work:
7:00 a.m. - 7:00 p.m.

  • Private utility work at Madison

Traffic Advisory:
Broadway and Madison - Expect a partial intersection closure the weekend of 3/29 - 3/30

What to Expect During Construction This Week:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Weekend Closure - Intersection of Yesler and Boren

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Jefferson to Spruce
    • Excavation for roadway restoration
    • Installation of utility pole foundations
  • Yesler - Broadway to 12th
    • Track construction
    • Roadway and sidewalk restoration
    • Platform construction
  • Jackson at Rainier
    • Excavate for utility pole foundations

Weekend and Nighttime Work: Friday at 7:00 p.m. until Sunday at 7:00 p.m.

  • Yesler - Broadway to 12th
    • Roadway restoration

Traffic Advisories:

Yesler and Boren intersection - This intersection will be closed this weekend beginning Friday night at 7:00 p.m. and continue until Monday at 6:00 a.m.

Broadway and Boren intersection - Expect the closure of this intersection the weekend of 3/29 - 4/1

What to Expect During This Week's Construction:

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Sidewalk restoration and saw cutting between 5th and 7th
  • Pavement restoration in westbound curb lane between 7th and 8th
  • Electrical work and street, sidewalk and alley restoration between Occidental and 3rd

Weekend Work:

  • Excavate the eastbound curb lane between 5th and 6th for permanent paving installation

Traffic Advisory:

  • On Saturday, March 23rd the south leg of the intersection of S Jackson and 6th Avenue will be closed to traffic until Saturday March 30th.

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

March 11th - 17th

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Weekend Closure of James at Broadway

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Denny to Pike
    • Electrical installations
  • Madison to Jefferson
    • Electrical installations
    • Pavement and sidewalk restoration

Weekend Work:

  • 7:00 a.m. - 7:00 p.m.
    • Asphalt paving Cherry to Jefferson
    • Private utility work at Madison

Traffic Advisory:

  • James will be closed to through traffic at Broadway from 3/15 at 7:00 p.m. until 3/17 by 7:00 a.m.

What to Expect During Construction This Week:

  • Odors from asphalt paving from Cherry to Jefferson on March 16
  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Yesler Way Closed from Broadway to Boren

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Jefferson to Terrace
    • Utility pole foundations
  • Yesler - Broadway to Boren
    • Sidewalk restoration
    • Track construction

Nighttime Work 7:00 p.m. - 6:00 a.m.

  • Yesler - Broadway to Boren
    • Rail delivery - Thursday morning
  • Jackson at 12th
    • Sewer relining

Traffic Advisories:

Yesler from Broadway to Boren -This section of Yesler Way will remain closed to traffic until April 4 to facilitate track construction and pavement restoration. For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm

Yesler and Boren intersection - This intersection will experience three weekend closures: March 15-17, 22-24 and 29-31. Closures will begin Friday night at 7:00 p.m. and continue until Monday at 6:00 a.m.

What to Expect During This Week's Construction:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Construct bicycle ramp from 8th and 9th
  • Excavate for utility pole foundations on 8th between Jackson and Dearborn
  • Electrical work alley restoration between Occidental and 3rd

Night Work: 7:00 p.m. - 7:00 a.m.

  • Sewer relining at 8th and Dearborn

Weekend Work: 7:00 a.m. - 7:00 p.m.

  • Pavement removal and restoration in westbound curb lane between Maynard and 8th
  • Electrical installation between 2nd and 3rd

Traffic Advisory:

  • S Jackson between 2nd and 3rd will have traffic flagged through one lane on 3/9 & 3/10
  • The north leg of the intersection of Jackson and 7th will close on March 9th for ten days

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

March 5th - 10th

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Howell to Denny
    • Electrical installation
  • Madison to Jefferson
    • Utility pole foundations
    • Sidewalk restoration
    • Pavement restoration

Upcoming Work:

  • Week of March 11th
    • Asphalt paving between tracks Columbia to Cherry
    • Pavement restoration from Cherry to Jefferson

Traffic Advisory:
James will be closed to through traffic at Broadway the weekend of 3/15-3/17

What to Expect During Construction This Week:

  • Closure of west leg of Broadway and Cherry intersection from 3/7 to 3/11
  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Yesler Way Closed from Broadway to Boren

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Jefferson to Terrace
    • Utility pole foundations
  • Yesler - Broadway to Boren
    • Sidewalk restoration
    • Track construction

Nighttime Work 7:00 p.m. - 6:00 a.m.

  • Yesler - Broadway to Boren
    • Rail delivery - Thursday morning
  • Jackson at 12th
    • Sewer relining

Traffic Advisories:

Yesler from Broadway to Boren -This section of Yesler Way will remain closed to traffic until April 4 to facilitate track construction and pavement restoration.
Yesler and Boren intersection - This intersection will experience three weekend closures: March 15-17, 22-24 and 29-31. Closures will begin Friday night at 7:00 p.m. and continue until Monday at 6:00 a.m.

What to Expect During This Week's Construction:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Construct bicycle ramp from 8th and 9th
  • Excavate for utility pole foundations on 8th between Jackson and Dearborn
  • Electrical work alley restoration between Occidental and 3rd

Night Work: 7:00 p.m. - 7:00 a.m.

  • Sewer relining at 8th and Dearborn

Weekend Work: 7:00 a.m. - 7:00 p.m.

  • Pavement removal and restoration in westbound curb lane between Maynard and 8th
  • Electrical installation between 2nd and 3rd

Traffic Advisory:

  • S Jackson between 2nd and 3rd will have traffic flagged through one lane on 3/9 & 3/10
  • The north leg of the intersection of Jackson and 7th will close on March 9th for ten days

What to Expect During Construction:

  • Short-term driveway restrictions
  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

Feb 25th - March 3rd

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Utility Pole Foundations, Pavement Restoration

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Pike intersection
    • Pavement restoration
  • Madison to Cherry
    • Utility pole foundations
    • Pavement restoration

What to Expect During Construction This Week:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise, dust and increased truck activity

Upcoming Work:

  • Week of March 4th
    • Pavement removal and restoration between streetcar tracks from Columbia to Cherry
    • Closure of west leg of Broadway and Cherry intersection from 3/7 to 3/11
    • Utility pole foundations from Cherry to Jefferson

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Utility Pole Foundations

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Jefferson to Terrace
    • Utility pole foundations
  • Broadway - Boren to Yesler
    • Sidewalk and pavement restoration
  • Yesler - Broadway to Boren
    • Track construction
  • Jackson - 8th to 12th
    • Curb and pavement restoration

Nighttime Work 10:00 p.m. - 4:00 a.m.

  • Yesler - Broadway to Boren
    • Rail delivery - Tuesday night

Saturday Work 7:00 a.m. - 7:00 p.m.

  • Jackson at 12th
    • Pavement restoration

What to Expect During This Week's Construction:

  • On street parking and loading restrictions
  • One travel lane in each direction
  • Construction noise and dust

Traffic Advisories:
Broadway and Yesler intersection - This intersection will remain closed to traffic until February 28.. For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
Yesler from Broadway to Boren - On March 4 this area will be closed to traffic for four weeks to facilitate track construction.

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Pavement removal and restoration in westbound curb lane between 5th and Maynard
  • Saw cutting roadway from Maynard to 8th
  • Excavating for utility pole foundations on 8th between Jackson and Dearborn
  • Electrical work and storm drain installation between Occidental and 3rd

Weekend Work: 7:00 a.m. - 7:00 p.m.

  • Electrical work between Occidental and 3rd

Traffic Advisory:

  • The north leg of the intersection of Jackson and Maynard will reopen on March 4th
  • The north leg of the intersection of Jackson and 7th will close on March 9th for seven days

.
What to Expect During
Construction:

  • On-street parking and loading restrictions
  • One travel lane in each direction
  • Pedestrian detours
  • Construction noise and dust

Feb 20th - 24th

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Utility Pole Foundations, Pavement Restoration

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Pike to Union
    • Curb ramp restoration
    • Pavement restoration
  • Union to Madison
    • Utility pole foundations
  • Madison to Cherry
    • Utility pole foundations
    • Pavement restoration

Weekend Work:
7:00 a.m. - 7:00 p.m.

  • Union intersection
    • Pavement restoration

Traffic Advisory:
This Saturday, February 23 the west leg of the Broadway and Union intersection will be closed from 5:00 a.m. until 7:00 p.m. for pavement restoration.

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Utility Pole Foundations

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Boren to Yesler
    • Pavement restoration
    • Track construction
  • Yesler - Broadway to 10th
    • Track construction
  • Jackson - 8th to 14th
    • Rail welding
    • Utility pole foundations

Weekend Work 7:00 a.m. - 7:00 p.m.

  • Jackson - 12th to 14th
    • Storm drain installation
    • Pavement restoration

Traffic Advisories:

Broadway and Yesler intersection - This intersection will remain closed to traffic until February 28.. For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
Yesler from Broadway to Boren - On March 4 this area will be closed to traffic for four weeks to facilitate track construction.

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Rail welding 8th to 10th
  • Saw cutting and pavement restoration in westbound curb lane between 5th and 8th
  • Electrical work and storm drain installation between Occidental and 3rd

Nighttime Work: 7:00 p.m. - 7:00 a.m.

  • Sewer line restoration - Tuesday

Weekend Work: 7:00 a.m. - 7:00 p.m.

  • Pavement restoration in westbound curb lane between 6th and Maynard
  • Electrical work and storm drain installation between Occidental and 3rd

Traffic Advisory:

  • The north leg of the intersection of Jackson and 6th will reopen on 2/23
  • The north leg of the intersection of Jackson and Maynard will close on 2/23 for ten days.

Feb 12th - Feb 17th

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Drilling Foundations for Utility Poles

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Denny to Pike
    • Utility inspections
    • Utility pole foundations
  • Madison to Jefferson
    • Storm drain work
    • Utility pole foundations
    • Driveway restorations

Traffic Advisory:

In late-February there will be a short-term partial closure of the Broadway and Union intersection for pavement restoration

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Water Main Work

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Boren to Yesler
    • Track construction
    • Pavement restoration
  • Yesler - Broadway to 13th
    • Concrete saw cutting
    • Water main installation
    • Pavement restoration
    • Utility pole foundations
  • 14th - Main to Jackson
    • Utility pole foundations
  • Jackson - 8th to 14th
    • Rail welding
    • Utility pole foundations
    • Sidewalk restoration

Nighttime Work 9:00 p.m. - 6:00 a.m.

  • Jackson -8th to 14th
    • Sewer line restoration
  • Jackson at 12th - Saturday night
    • Water line installation

Weekend Work 7:00 a.m. - 7:00 p.m.

  • Yesler at 12th
    • Water line installation
  • Jackson - 12th to 14th
    • Water line installation
    • Storm drain installation

Traffic Advisories

  • Broadway and Yesler intersection - This intersection will remain closed to traffic until February 28. . For bus and detour information go to: http://www.seattlestreetcar.org/firsthill.htm
  • 12th and Jackson Intersection - This intersection will have lane and turn restrictions from 7:00 a.m. Saturday, February 16 until 7:00 p.m. Sunday, February 17th for water main installation.
  • Yesler from Broadway to Boren - On March 4th this area will be closed to traffic for four weeks to facilitate track construction.

Note Regarding Water Main Installation:
On Saturday night, February 16 there will be water service interruptions on 12th between Main and Weller as new connections are made. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.

What to Expect During This Week's Construction:

  • On street parking and loading restrictions
  • One travel lane in each direction except where noted
  • Construction noise, dust and increased truck activity
  • The dates of this work are subject to change due to weather

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Rail welding 8th to 10th
  • Saw cutting 5th to 8th
  • Electrical work, pavement restoration and storm drain installations between Occidental and 3rd

Weekend Work:
7:00 a.m. - 7:00 p.m.

  • Roadway restoration north side of 5th to 6th

Traffic Advisory:

12th and Jackson Intersection - This intersection will have lane and turn restrictions from 7:00 a.m. Saturday, February 16th until 7:00 p.m. Sunday, February 17th for water main installation.

Feb 5th - Feb 10th

BROADWAY SEGMENT - CONSTRUCTION DETAIL
Pavement Restoration

Weekday Work:
7:00 a.m. - 4:00 p.m.

  • Howell to Pine
    • Utility pole foundations
    • Electrical installations
  • Union to Columbia
    • Pavement restoration
  • Madison to Marion
    • Electrical installations

Traffic Advisory:
In late-February there will be a short-term partial closure of the Broadway and Union intersection

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Water Main Work

Weekday Work 7:00 a.m. - 4:00 p.m.

  • Broadway - Boren to Yesler
    • Track construction
  • Yesler at Broadway
    • Foundations for utility poles
  • Jackson - 8th to 14th
    • Pavement restoration
    • Storm drain and water main work

Nighttime Work 9:00 p.m. - 6:00 a.m.

  • 14th and Yesler - Monday
    • Sewer line restoration
  • Broadway Spruce to Yesler - Friday
    • Rail delivery
  • Jackson between 8th and 9th - Saturday
    • Rail delivery
  • Jackson between 12th and 14th - Sunday
    • Sewer line restoration

Weekend Work - 7:00 a.m. to 7:00 p.m.

  • Broadway and Yesler Intersection
    • Track and roadway construction

Traffic Advisories

  • Broadway & Yesler Intersection - On February 9th this intersection will be closed to traffic 24-hours per day for three weeks to facilitate track construction.
  • Yesler from Broadway to Boren - On March 4th this area will be closed to traffic for four weeks to facilitate track construction
  • Rail Delivery - Beginning the evening of February 9th streetcar rail will be delivered, welded and stored in the center lane of Jackson between 8th and 10th.
  • 12th and Jackson Intersection - This intersection will be closed to traffic from 7:00 a.m. Saturday, February 16 until 7:00 a.m. Sunday, February 17 for water main installation.

What to Expect During This Week's Construction:

  • On street parking and loading restrictions
  • One travel lane in each direction except where noted
  • Construction noise, dust and increased truck activity
  • The dates of this work are subject to change due to weather

Note Regarding Water Main Installation:
In mid-February there will be water service interruptions on 12th between Main and Weller as new connections are made. If your building will be affected you will receive notice of a water shutdown directly from Seattle Public Utilities at least 72 hours in advance.

JACKSON SEGMENT - CONSTRUCTION DETAIL
Electrical Installations and Pavement Restoration

Weekday Work: 7:00 a.m. - 4:00 p.m.

  • Electrical work, pavement restoration and storm drain installations between Occidental and 3rd
  • Pavement restoration between 5th and 8th

Night Work: 7:00 p.m. - 7:00 a.m.

  • Electrical work at 2nd - Nightly
  • Sewer restoration at Dearborn and 8th - Tuesday
  • Rail delivery between 8th and 10th - Saturday
  • Sewer restoration Occidental to 2nd - Saturday

Weekend Work:
7:00 a.m. - 7:00 p.m.

  • Electrical work and pavement restoration between Occidental and 3rd

Traffic Advisory:
12th and Jackson Intersection - This intersection will be closed to traffic from 7:00 a.m. Saturday, February 16 until 7:00 a.m. Sunday, February 17 for water main installation.

View Older Updates


  HOME | ABOUT | SLU | FIRST HILL | BROADWAY | FAQ | NETWORK | SPONSOR | CONTACT
go to first hill main page go to South Lake Union main page go to Broadway Extention main page